Yorkshire Water’S Response to Selected Aspects of Ofwat’S Submissions of 16 June

Yorkshire Water’S Response to Selected Aspects of Ofwat’S Submissions of 16 June

Annex A – Yorkshire Water’s response to selected aspects of Ofwat’s submissions of 16 June Issue Ofwat ’s position YWS’s position Ofwat! "ross cutting issues – response to companies’ $7 &ay submissions to the "&A Cos t effi c i ency App li cati on o f [para 2. 14] Y or k s h i re Wat er (YWS) did Wh ether or no t YWS appli e d a fron ti er s hift assumpti on is irre l e(an t as it does no t f orm the &enc h mar k frontier shift to not apply a net frontier shift adjustment to under 'f%at* s approach. See YW)* s +esponse to 'f%at* s +eply (Response) – +esponse-.nnex 11-0.4.4. enhancement en hancement costs (including W !"# 1he key issue is the frontier shift assump tions of the &enchmark companies. 'f%at has pre(iously stated costs and metering costs), so it %as reasona&le that only the frontier shift assumptions of the benchmark companies are rele(ant: 'f%at +eply3440-5.65. for 'f%at selecti(ely to do so. [para 2. 21] ! one o f th e f our compani es This po i n t h as a l rea d y &een a dd resse d i n the par ti es ’ pre(i ous su & m i ss i ons 2 %hich are W !"#3cost efficient applied a YW): )tatement of 7ase (SoC) – )o7-241 and .nnex 6; +esponse-5.49.132 net f rontier shift challenge to their for%ard3looking costs , so there is no 'f%at: 'f%at +eply3440-5.65; 'f%at +eply3449-:.9:3:.:2 e(idence that 'f%at*s net fro ntier shift Specifically, as a&o(e, it is rele(ant to check %hether the &enchmark companies ha(e applied a frontier shift challenge dou&le counts efficiency gains. challenge. Whether YWS did so is irrele(ant. YWS has [para 2. 59] 1h ese cos t s seem h igh . t is 'f%a t* s sugges ti on tha t YW)* s es ti ma t e ;seems hig h” h as no e( id en ti a l & as i s. .s e/p l a i ne d i n requested an important that YWS &e in centi(ised to +esponse-.nnex 24, there %ere three key considerations &ehind YW)* s cost estimate: uncerta inty incur costs efficiently so any uncerta inty YW)*s efficient "D costs of >104m %ere deri(ed from a &ottom3up assessmen t using YW)*s unit mechanism fo r its mech anism should ha(e a conser(ati (e cost data&ase, %hich contains its historic outturn costs. YWS then applied an upfront efficiency £150m Industrial allo%ance for costs and a high sharing reduction of 20?. Emissions factor for customers. Directi e (IED" There remains uncertainty around the cost of compliance %ith "=. 1he cost is likely to &e highly compliance costs site specific and %ill depend on a (ariety of factors such as the age of sludge assets. The cost 1 Issue Ofwat ’s position YWS’ s position re@uir ements fo r each site %ill &e finalised once detailed consideration has &een gi(en to each site as part of the permitting process. YWS are in the process of applying for a permit under "D for assets in Aull and this e/perience reinforces the (iew that compliance costs are likely to &e far higher than the EA estimate. .s to the operation of the uncertainty mechanism, this should &e b ased on the &est a(aila&le central3case estimate of costs. Boreo(er, it s hould &e &orne in mind that 'f%at has already imposed a (ery high sharing factor %ithin the general totex sharing mechanis m, %ith sharing factors for customers of the order of 90? due to the %ell documented fla%s in 'f%at*s assessment of efficient costs. Co i d#1$ Impac sto f C o id# p[ara .42] 1 eh (as t ma ojri yt of t eh ' %fat ahs edscri e&d s ect oin 4 of t ehcross c3utt nig sisues paper as con atninig new e(i ednce on appl cia& el 19 p otential impacts r aised &y the disputing reconciliation adjustment, yet all of the comments appear to relate to a letter sent to all %ater company companies can &e addressed (ia e/isting 7"'s as long ago as mid3Barch. Boreo(er, YWS %ould &e concerned if 'f%at had already decided ho% #+19 mechanisms. it %ill respond to %hat remains an e/tremely uncertain and rapidly changing situ ation, %ith multiple factors that are %holly outside the control of companie s. 'f%at goes on to state (in para 4.14) that softening or remo (ing performance co mmitments risks unnecessarily distorting or remo(ing incenti(es wh ich &enefit customers. Cut there is no mention of the need to ensure that incenti(es designed for a %orld %ithout 7o(id3 19 or its impacts and limitations, do not distort the costs and achie(a&ili ty of targets, to the e/tent that they: Cecome economically irrational %ith the efficient costs of achie(ement far out%eighing customer &enefits deli(ered. =o not account for the necessary restrictions in acti(ity that %ater companies ha(e had to comply %ith meaning that some acti(ities ha(e &een fully paused or significantly reduced. n any e(ent, YWS disagrees %ith 'f%at*s assertion that e/isting mechanisms address this situation: 2 Issue Ofwat ’s position YWS’ s position The rele(ant mechanisms a(aila&le to 'f%at to deal %ith in .3BP incid ents are as follo%s: Interim determination !IDOK) apparatus. 1his is designed to deal %ith cost shocks – %hereas the early e(idence already poin ts to the principal impacts of 7o(id319 &eing on re enue reco(ery$ specific performance commitments (especially those regarding aspects of customer &eha(iour) and financial '= s (especially %here s u&ject to annu al in3period ass essment), thus rendering the ='D me chanism unsuita&le in these circumstances. n addition, the specific conse@uences of the hiatus in the non3residential retail market and the solutions re@uired from %holesale companies %ill need to &e dealt %ith. This is not pro(ided for in the ='K apparatus. In#period assessment of %DIs. 1here is no precedent for in3period assessments to deal %ith ne% circumstances. ndeed, one of the principles th at 'f%at has follo%ed in #+14 is that all companies should adhere to the agreed '= s. Boreove r, at the time of %r iting, 'f%at has yet to pro(ide any insight on the method that 'f%at %ill re@uire to assess the in3period '= s for #+16, far less any ne% process to deal %ith 7o(id319 impacts. .s pre(iously ad(ised, YWS %ill pro(ide an update to the 7BA in late3July of its &est a(aila&le (ie% regarding the scale of 7o(id319 impacts, and the e(idence a(aila&le. While YWS %ill endea(our to pro(ide as much clarity as possib le, its strong e/pectation is that there %ill remain important ele ments %her e the impacts remain uncrystallised or su&ject to a major d egree of uncertainty. n these circums tances, rather than speculating on outcomes, YWS considers it %ill &e more effecti(e for the 7BA to limit its thinking on 7o(id319 to a small num&er of guiding principles, such as the follo%ing: 7lear rec ognition that the redeterminations ha(e not included an y recogniti on of 7o(id319 effects – and hence these remain to &e dealt %ith &y 'f%at in their entirety using su ita&le new mechanisms. 7lear recogn ition th at %hen 'f%at considers 7o(id319 effects, the disputing compan ies should &e treated in line %ith all other companies in light of the fact that this %ill not &e considered &y the 7B.. 3 Issue Ofwat ’s position YWS’ s position .ny rele(ant ;lessons learnt” from the redeterminations around incentiv e mechanisms and the &alance of risks f aced &y companies – applica &le to either 'f%at or companies – should &e reflected in 'f%at*s approach to 7o(id319 impacts to achie(e the &est outcomes for all stakeholders. Ofwat! (esponse to Yorkshire Water’s $7 &ay submission to the "&A &he resilience impact of the final determination & ehresil eince p[ara .24] ' %fat does no t e&l ei(e t aht it si YW) s*posit oin siset out ni o)7-2G5 et se@. impacts of the necessary or prudent for YWS to defer t is note%orthy that the deferral of capital maintenance necessitated &y the FD %as e/plained in the )o7$ final capital main tenance under the final meaning that 'f%at had ample opportunity to address this in its second3round su&missions. determination determination (FD). 1he cost allo%ance alle'ed (y YWS in the FD allo%s YWS to maintain its assets and resilience, undertake its re@uired enhancement programme and meet its #erformance Commitments. [para 2. 0] 1h e rea di ness % ith %hi c h YWS 1his m i sses the po i n t . YWS is no t suggesti ng tha t th e d eferra l of capit a l mai n t enance % ill result i n poorer is prepared to deprioritise capital performance during .B#:, such that underperformance payments %ou ld &e necessary.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    34 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us