OGW-30-01 Broken Hill to Stockinbingal

OGW-30-01 Broken Hill to Stockinbingal

Division / Business Unit: Safety, Engineering & Technology Function: Operations Document Type: Guideline Network Information Book TOCO Board Broken Hill to Stockinbingal (exc) and Bogan Gate to Bogan Gate North OGW-30-01 Applicability Interstate Network Publication Requirement Internal / External Primary Source Local Appendices West Volume 3 Route Access Standard – Defined Interstate Rail Network Section Pages D11 & D14 Document Status Version # Date Reviewed Prepared by Reviewed by Endorsed Approved 2.2 21 May 2021 Configuration Configuration Standards GM Technical Standards Management Management Manager Administrator Administrator Amendment Record Amendment Date Clause Description of Amendment Version # Reviewed 1.0 19 Oct 2016 Initial issue 1.1 03 Aug 2017 Various Broken Hill diagram updated, 4WD Access only text inserted, and Yarrabandai level crossing updated. Diagram legend updated and safety interface agreements details added. © Australian Rail Track Corporation Limited (ARTC) Disclaimer This document has been prepared by ARTC for internal use and may not be relied on by any other party without ARTC’s prior written consent. Use of this document shall be subject to the terms of the relevant contract with ARTC. ARTC and its employees shall have no liability to unauthorised users of the information for any loss, damage, cost or expense incurred or arising by reason of an unauthorised user using or relying upon the information in this document, whether caused by error, negligence, omission or misrepresentation in this document. This document is uncontrolled when printed. Authorised users of this document should visit ARTC’s intranet or extranet (www.artc.com.au) to access the latest version of this document. CONFIDENTIAL Page 1 of 141 TOCO Board Broken Hill to Stockinbingal (exc) and Bogan Gate to Bogan Gate North OGW-30-01 Table of Contents 1.2 4 Dec 2018 Various Signal corrections to Kaleentha, Matakana, Euabalong West, Kiacatoo, Wirrinya & Caragabal diagrams. Line segment correction in Level Crossings table section 1.7. 2.0 14 Oct 2019 1.7, 2.14 Level crossing table updated. SCT Parkes location details extensively updated and North West Link diagram replaces Gunningbland – Goobang Junction diagram. 2.1 9 Nov 2020 1.7, 2.15 Level crossing table updated. Newell Highway level crossings at Welcome and Tichborne added to section 2.15.1. Broken Hill, North West Link, Goobang Junction, Goobang Junction South, Wirrinya & Milvale – Stockinbingal diagrams updated 2.2 21 May 2021 1.4, 1.7, 1.14, Adjacent train control details updated. Menindee level crossing 2.1, 2.3 updated. Wayside Equipment section updated. Broken Hill diagram updated. Use note added to diagrams. This document is uncontrolled when printed. Version Number: 2.2 Date Reviewed: 21 May 2021 Page 2 of 141 TOCO Board Broken Hill to Stockinbingal (exc) and Bogan Gate to Bogan Gate North OGW-30-01 Table of Contents Table of Contents Table of Contents ............................................................................................................................................. 3 1 Introduction ............................................................................................................................................. 5 1.1 Board Extent................................................................................................................................... 5 1.2 Safe Working System ..................................................................................................................... 5 1.3 Applicable Rules ............................................................................................................................ 5 1.4 Adjacent Train Control Boards / Centres ....................................................................................... 5 1.5 Section Operating Equipment ........................................................................................................ 5 1.5.1 How to Take Local Control ............................................................................................................. 5 1.5.2 Motorised Point Machines & Ground Frames ................................................................................. 6 1.5.3 Main Line Indicator and Trailing Points Indicator Push Button Units .............................................. 9 1.6 Train Braking Requirements ........................................................................................................ 10 1.7 Level Crossings ............................................................................................................................ 11 1.8 Emergency Local Releases ......................................................................................................... 25 1.9 Maximum Permanent Speeds and Permanent Speed Restrictions ............................................. 25 1.10 Maximum Train Length ................................................................................................................ 26 1.11 Structure Clearances ................................................................................................................... 26 1.12 Operation of Double Stack Containers ........................................................................................ 26 1.13 Communications .......................................................................................................................... 27 1.14 Wayside Monitoring Systems ....................................................................................................... 27 1.15 Ruling Gradients .......................................................................................................................... 28 1.16 Curve and Gradient Data ............................................................................................................. 28 1.17 Drawing Legend ........................................................................................................................... 29 2 Locations and Sections Information .................................................................................................. 30 2.1 Broken Hill (BKH) ......................................................................................................................... 30 2.2 Kinalung (KIN) .............................................................................................................................. 40 2.3 Menindee (MNE) .......................................................................................................................... 45 2.4 Kaleentha (KLE) ........................................................................................................................... 51 2.5 Darnick (DNK) .............................................................................................................................. 56 2.6 Ivanhoe (IVN) ............................................................................................................................... 62 2.7 Trida (TRD) .................................................................................................................................. 67 2.8 Roto (RTO) ................................................................................................................................... 71 2.9 Matakana (MTK) .......................................................................................................................... 73 This document is uncontrolled when printed. Version Number: 2.2 Date Reviewed: 21 May 2021 Page 3 of 141 TOCO Board Broken Hill to Stockinbingal (exc) and Bogan Gate to Bogan Gate North OGW-30-01 Table of Contents 2.10 Euabalong West (EUA) ................................................................................................................ 77 2.11 Kiacatoo (KCT) ............................................................................................................................. 80 2.12 Condobolin (CON) ........................................................................................................................ 84 2.13 Derriwong (DER) .......................................................................................................................... 87 2.14 Ootha (OTH)................................................................................................................................. 89 2.15 Yarrabandai (YAI) ........................................................................................................................ 91 2.16 Bogan Gate North (BPN) ............................................................................................................. 95 2.17 Bogan Gate (BGT) ....................................................................................................................... 96 2.18 Gunningbland (GBD) .................................................................................................................. 100 2.19 SCT Parkes (SCP) & Parkes North West Yard (PNP) ............................................................... 102 2.19.1 General Arrangements ............................................................................................................... 102 2.19.2 Parkes SCT Siding ..................................................................................................................... 103 2.19.3 Parkes North West Link .............................................................................................................

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    141 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us