Details of Works for Highways Details of Works

Details of Works for Highways Details of Works

DETAILS OF WORKS FOR HIGHWAYS DEMAND No.21 --- HIGHWAYS AND MINOR PORTS DEPARTMENT Page HEADS OF DEPARTMENT Number 21 02. CHIEF ENGINEER - NATIONAL HIGHWAYS 1-- 41 21 03. CHIEF ENGINEER (CONSTRUCTION AND MAINTENANCE ) - HIGHWAYS 42—86 21 04. CHIEF ENGINEER (HIGHWAYS) - PROJECTS 87— 138 21 05. PROJECT DIRECTOR - TAMIL NADU ROAD 139—142 SECTOR PROJECT 21 07. CHIEF ENGINEER (HIGHWAYS) - NABARD 143—152 AND RURAL ROADS 21 10. CHIEF ENGINEER (METRO) 153—161 DEMAND No.21 – HIGHWAYS AND MINOR PORTS DEPARTMENT 21 02. CHIEF ENGINEER - NATIONAL HIGHWAYS DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT 21 2 Chief Engineer, National Highways 5054 01 337 JA [ ` in Thousands] Expenditure Revised Budget Estimate Budget upto Estimate Estimate Details of Works Amount Estimate 31-3-2017 2017-18 2017-18 2018-19 5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 01 National Highways 337 Road Works JA Original works 16 Major Works ( DPC 5054 01 337 JA 16 00 ) 1. AS / TS / RAS: 0 New Works likely to be sanctioned ... ... ... ... 1 Tirunelveli (NH) Division 2. AS / TS / RAS: 4400 Shifting of Electric Poles and Transformers for the work Widening from 44,00 ... 1 1 ... double lane to 10.0 Metre width in Km 25/0-45/0 and Strengthening and Improvements to wearing surface of Srivilliputhur - Sivakasi - Virudunager - Aruppukottai - Tiruchuli- road. G.O (D) No 62 Highways and Minor Porsts (HV2) Department dated 4.3.2016 64 Lands ( DPC 5054 01 337 JA 64 09 ) Madurai(NH) Division 1. AS / TS / RAS: 154 LAOP Case 58/1987- National Highways - Madurai (NH) Division- 1,54 ... 1 1 ... Lands acquired for Widening Of NH 7 in Thadi Kombu Village Dindugul District - Enhanced Compensation. G.O (D) No 93 Highways and Minor Porsts (HV2) Department dated 21.7.2016 TOTAL - 5054 01 337 JA 45,54 ... 2 2 1 1 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT 21 2 Chief Engineer, National Highways 5054 05 800 SA [ ` in Thousands] Expenditure Revised Budget Estimate Budget upto Estimate Estimate Details of Works Amount Estimate 31-3-2017 2017-18 2017-18 2018-19 5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 05 Roads 800 Other Expenditure SA Revamped Central Road Fund 16 Major Works ( DPC 5054 05 800 SA 16 04 ) 1. AS / TS / RAS: 0 New works likely to be sanctioned in 2018-19 ... ... ... ... 550,00,00 Chennai (NH)Division 2. AS / TS / RAS: 10100 Improvement to Chittor-Tirutani-Renigunda road kanchipadi road 1,01,00 65 98,00 1,00,35 ... km0/0-2/0 CRF-TN-2016-17-113 3. AS / TS / RAS: 5586 Construction of box culverts at Km 18/10,19/8,20/4,20/8(i) 20/8(ii) 55,86 37 59,00 55,49 ... 21/10,29/2,29/8,29/10 & 31/10 of Maduranthagam-Vennangupattu Road CRF-TN-2016-17-81 4. AS / TS / RAS: 8800 Improvements to Echur Thiruporur Road to Thirunilai Harijan Colony 88,00 60 1,05,00 87,40 ... Road km 0/0 – 2/0 CRF-TN-2016-17-78 5. AS / TS / RAS: 93740 Construction of Bridge at km 3/8 of pinjivakkam Harijan Colony Road 9,37,40 ... ... 25,00 9,12,40 CRF-TN-2017-18-26 6. AS / TS / RAS: 12500 Strengthening to Chidambaram - Pitchavaram Tourist Centre road km 1,25,00 74 1,00,00 1,24,26 ... 10/4 - 13/0 CRF-TN-2016-17-80 7. AS / TS / RAS: 13800 Improvements to East Coast Road to Vaswa Samudhram Road km 0/0 1,38,00 87 1,47,00 1,37,13 ... – 2/6 CRF-TN-2016-17-118 2 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT 21 2 Chief Engineer, National Highways 5054 05 800 SA [ ` in Thousands] Expenditure Revised Budget Estimate Budget upto Estimate Estimate Details of Works Amount Estimate 31-3-2017 2017-18 2017-18 2018-19 5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 05 Roads 800 Other Expenditure SA Revamped Central Road Fund 16 Major Works ( DPC 5054 05 800 SA 16 04 ) Chennai (NH)Division 8. AS / TS / RAS: 19300/ 19950 Improvements to GNT road to Ayyanallur road km0/0-3/0 1,99,50 1,29 1,53,00 1,98,21 ... CRF-TN-2016-17-77 9. AS / TS / RAS: 45600 Widening to SL to IL Chunambedu – Perumbair road in km 7/2-12/0 4,56,00 2,89 3,66,00 4,53,11 ... CRF-TN-2016-17-72 10 . AS / TS / RAS: 38400 Strengthening to Keerapalayam - Sethiyathope Road km 5/0 - 12/6 3,84,00 2,34 3,44,00 3,81,66 ... CRF-TN-2016-17-73 11 . AS / TS / RAS: 64400/ 70600 Providing CC pavement in Km 50/8-54/0 of Virudhachalam-Ulundurpet- 7,06,00 8,47 6,04,00 6,97,52 ... Villupuram Road CRF-TN-2016-17-75 12 . AS / TS / RAS: 21889 Improvements to Km 8/6 of Cuddalore - Thirukovilur - Sankarapuram 2,18,89 1,28 2,11,00 2,17,61 ... road to Sathankuppam road (via) Thirumanikuzhi road km 0/0 - 5/6. CRF-TN-2016-17-121 13 . AS / TS / RAS: 24700/ 26100 Widening single lane to intermediate and strengthening Agaram colony 2,61,00 1,72 2,07,00 2,59,28 ... – Gangaiyadikuppam road km0/0-3/2 CRF-TN-2016-17-76 14 . AS / TS / RAS: 28900 Improvements to Periyapattu-Andarmullipallam - Poochimedu road km 2,89,00 1,69 2,61,00 2,87,31 ... 0/0-4/8 CRF-TN-2016-17-74 3 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT 21 2 Chief Engineer, National Highways 5054 05 800 SA [ ` in Thousands] Expenditure Revised Budget Estimate Budget upto Estimate Estimate Details of Works Amount Estimate 31-3-2017 2017-18 2017-18 2018-19 5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 05 Roads 800 Other Expenditure SA Revamped Central Road Fund 16 Major Works ( DPC 5054 05 800 SA 16 04 ) Chennai (NH)Division 15 . AS / TS / RAS: 31200/ 32500 Widening single lane to intermediate and strengthening GNT road – 3,25,00 2,12 2,72,00 3,22,87 ... Agaram colony km0/0-4/0 CRF-TN-2016-17-71 16 . AS / TS / RAS: 15681 Improvements to Ottivakkam to Manappakkam Road km 0/0 – 2/8 1,56,81 1,02 1,56,00 1,55,79 ... CRF-TN-2016-17-79 17 . AS / TS / RAS: 23337 Improvements to km 13/0- 19/0 of Kumaratchi - Vallam Padhugai Road 2,33,37 ... ... 25,00 91,69 CRF-TN-2017-18-45 18 . AS / TS / RAS: 20000/ 218940 Reconstruction of High level bridge in lieu of existing causeway at 21,89,40 11,92,38 1 9,97,01 ... Km.25/2 of Thiruvannamalai - Thiyagadurgam road CRF-TN-2015-893, dt.14.05.15 19 . AS / TS / RAS: 278910 Construction of Bridge at km 44/8 of Thirumazhisai- Uthukkottai 27,89,10 ... ... 25,00 27,64,10 Road CRF-TN-2017-18-41 20 . AS / TS / RAS: 72400 Widening from SL to IL in Km.0/0 - 7/2, 12/0 - 13/0 and 19/0 - 19/8 of 7,24,00 5,78,38 1 ... ... Chunambedu - Perumbair road CRF-TN-2015-882, dt.14.05.15 21 . AS / TS / RAS: 109800 Providing paved shoulders and strengthening in Km 18/0 - 25/0 of 10,98,00 8,49,42 1 ... ... Thandalam - Perambakkam road to Thakolam - Arugilpadi road CRF-TN-2015-874, dt.14.05.15 4 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT 21 2 Chief Engineer, National Highways 5054 05 800 SA [ ` in Thousands] Expenditure Revised Budget Estimate Budget upto Estimate Estimate Details of Works Amount Estimate 31-3-2017 2017-18 2017-18 2018-19 5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 05 Roads 800 Other Expenditure SA Revamped Central Road Fund 16 Major Works ( DPC 5054 05 800 SA 16 04 ) Chennai (NH)Division 22 . AS / TS / RAS: 74000 Improvements in Km.48/0-51/0 & 52/0-58/0 of Cuddalore - 7,40,00 5,07,49 1 2,32,50 ... Thirukovilur - Sankarapuram road CRF-TN-2015-863, dt.14.05.15 23 . AS / TS / RAS: 61200 Strengthening from km 39/2-51/04 of Thiruvannamalai - 6,12,00 ... ... 25,00 5,87,00 Thiyagadurgam road CRF-TN-2017-18-27 24 . AS / TS / RAS: 50140 Improvements to km 5/6- 19/0 of Cuddalore - Chittur Road 5,01,40 ... ... 25,00 4,76,40 CRF-TN-2017-18-33 25 . AS / TS / RAS: 10400/ 107700 Widening from SL to IL Moogilthuraipattu to Thiruvarangam Km 0/0- 10,77,00 2,33 10,00,00 10,74,66 ... 18/8 CRF-TN-2016-17-135 26 . AS / TS / RAS: 107700 Strengthening to Thiruvannamalai Thiyagadurgam road km 19/2 - 39/20 10,77,00 2,33 11,49,00 10,74,66 ... CRF-TN-2016-17-70 Vellore (NH) Division 27 . AS / TS / RAS: 49950/ 50000 Widening from SL to IL and Improvements to Km 5/4 - 14/4 of Central 5,00,00 ... ... 25,00 4,75,00 Jail - Amirthi Road . CRF-TN-2017-18-44 28 . AS / TS / RAS: 100040 Improvements to Km 30/0-34/0, 46/6-48/4 & 56/0-64/0 of 10,00,40 ... ... 25,00 9,75,40 Abdullapuram - Asanampattu - Alangayam - Tirupattur road. CRF-TN-2017-18-23 5 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT 21 2 Chief Engineer, National Highways 5054 05 800 SA [ ` in Thousands] Expenditure Revised Budget Estimate Budget upto Estimate Estimate Details of Works Amount Estimate 31-3-2017 2017-18 2017-18 2018-19 5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 05 Roads 800 Other Expenditure SA Revamped Central Road Fund 16 Major Works ( DPC 5054 05 800 SA 16 04 ) Vellore (NH) Division 29 .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    168 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us