DETAILS OF WORKS FOR HIGHWAYS DEMAND No.21 --- HIGHWAYS AND MINOR PORTS DEPARTMENT Page HEADS OF DEPARTMENT Number 21 02. CHIEF ENGINEER - NATIONAL HIGHWAYS 1-- 41 21 03. CHIEF ENGINEER (CONSTRUCTION AND MAINTENANCE ) - HIGHWAYS 42—86 21 04. CHIEF ENGINEER (HIGHWAYS) - PROJECTS 87— 138 21 05. PROJECT DIRECTOR - TAMIL NADU ROAD 139—142 SECTOR PROJECT 21 07. CHIEF ENGINEER (HIGHWAYS) - NABARD 143—152 AND RURAL ROADS 21 10. CHIEF ENGINEER (METRO) 153—161 DEMAND No.21 – HIGHWAYS AND MINOR PORTS DEPARTMENT 21 02. CHIEF ENGINEER - NATIONAL HIGHWAYS DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT 21 2 Chief Engineer, National Highways 5054 01 337 JA [ ` in Thousands] Expenditure Revised Budget Estimate Budget upto Estimate Estimate Details of Works Amount Estimate 31-3-2017 2017-18 2017-18 2018-19 5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 01 National Highways 337 Road Works JA Original works 16 Major Works ( DPC 5054 01 337 JA 16 00 ) 1. AS / TS / RAS: 0 New Works likely to be sanctioned ... ... ... ... 1 Tirunelveli (NH) Division 2. AS / TS / RAS: 4400 Shifting of Electric Poles and Transformers for the work Widening from 44,00 ... 1 1 ... double lane to 10.0 Metre width in Km 25/0-45/0 and Strengthening and Improvements to wearing surface of Srivilliputhur - Sivakasi - Virudunager - Aruppukottai - Tiruchuli- road. G.O (D) No 62 Highways and Minor Porsts (HV2) Department dated 4.3.2016 64 Lands ( DPC 5054 01 337 JA 64 09 ) Madurai(NH) Division 1. AS / TS / RAS: 154 LAOP Case 58/1987- National Highways - Madurai (NH) Division- 1,54 ... 1 1 ... Lands acquired for Widening Of NH 7 in Thadi Kombu Village Dindugul District - Enhanced Compensation. G.O (D) No 93 Highways and Minor Porsts (HV2) Department dated 21.7.2016 TOTAL - 5054 01 337 JA 45,54 ... 2 2 1 1 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT 21 2 Chief Engineer, National Highways 5054 05 800 SA [ ` in Thousands] Expenditure Revised Budget Estimate Budget upto Estimate Estimate Details of Works Amount Estimate 31-3-2017 2017-18 2017-18 2018-19 5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 05 Roads 800 Other Expenditure SA Revamped Central Road Fund 16 Major Works ( DPC 5054 05 800 SA 16 04 ) 1. AS / TS / RAS: 0 New works likely to be sanctioned in 2018-19 ... ... ... ... 550,00,00 Chennai (NH)Division 2. AS / TS / RAS: 10100 Improvement to Chittor-Tirutani-Renigunda road kanchipadi road 1,01,00 65 98,00 1,00,35 ... km0/0-2/0 CRF-TN-2016-17-113 3. AS / TS / RAS: 5586 Construction of box culverts at Km 18/10,19/8,20/4,20/8(i) 20/8(ii) 55,86 37 59,00 55,49 ... 21/10,29/2,29/8,29/10 & 31/10 of Maduranthagam-Vennangupattu Road CRF-TN-2016-17-81 4. AS / TS / RAS: 8800 Improvements to Echur Thiruporur Road to Thirunilai Harijan Colony 88,00 60 1,05,00 87,40 ... Road km 0/0 – 2/0 CRF-TN-2016-17-78 5. AS / TS / RAS: 93740 Construction of Bridge at km 3/8 of pinjivakkam Harijan Colony Road 9,37,40 ... ... 25,00 9,12,40 CRF-TN-2017-18-26 6. AS / TS / RAS: 12500 Strengthening to Chidambaram - Pitchavaram Tourist Centre road km 1,25,00 74 1,00,00 1,24,26 ... 10/4 - 13/0 CRF-TN-2016-17-80 7. AS / TS / RAS: 13800 Improvements to East Coast Road to Vaswa Samudhram Road km 0/0 1,38,00 87 1,47,00 1,37,13 ... – 2/6 CRF-TN-2016-17-118 2 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT 21 2 Chief Engineer, National Highways 5054 05 800 SA [ ` in Thousands] Expenditure Revised Budget Estimate Budget upto Estimate Estimate Details of Works Amount Estimate 31-3-2017 2017-18 2017-18 2018-19 5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 05 Roads 800 Other Expenditure SA Revamped Central Road Fund 16 Major Works ( DPC 5054 05 800 SA 16 04 ) Chennai (NH)Division 8. AS / TS / RAS: 19300/ 19950 Improvements to GNT road to Ayyanallur road km0/0-3/0 1,99,50 1,29 1,53,00 1,98,21 ... CRF-TN-2016-17-77 9. AS / TS / RAS: 45600 Widening to SL to IL Chunambedu – Perumbair road in km 7/2-12/0 4,56,00 2,89 3,66,00 4,53,11 ... CRF-TN-2016-17-72 10 . AS / TS / RAS: 38400 Strengthening to Keerapalayam - Sethiyathope Road km 5/0 - 12/6 3,84,00 2,34 3,44,00 3,81,66 ... CRF-TN-2016-17-73 11 . AS / TS / RAS: 64400/ 70600 Providing CC pavement in Km 50/8-54/0 of Virudhachalam-Ulundurpet- 7,06,00 8,47 6,04,00 6,97,52 ... Villupuram Road CRF-TN-2016-17-75 12 . AS / TS / RAS: 21889 Improvements to Km 8/6 of Cuddalore - Thirukovilur - Sankarapuram 2,18,89 1,28 2,11,00 2,17,61 ... road to Sathankuppam road (via) Thirumanikuzhi road km 0/0 - 5/6. CRF-TN-2016-17-121 13 . AS / TS / RAS: 24700/ 26100 Widening single lane to intermediate and strengthening Agaram colony 2,61,00 1,72 2,07,00 2,59,28 ... – Gangaiyadikuppam road km0/0-3/2 CRF-TN-2016-17-76 14 . AS / TS / RAS: 28900 Improvements to Periyapattu-Andarmullipallam - Poochimedu road km 2,89,00 1,69 2,61,00 2,87,31 ... 0/0-4/8 CRF-TN-2016-17-74 3 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT 21 2 Chief Engineer, National Highways 5054 05 800 SA [ ` in Thousands] Expenditure Revised Budget Estimate Budget upto Estimate Estimate Details of Works Amount Estimate 31-3-2017 2017-18 2017-18 2018-19 5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 05 Roads 800 Other Expenditure SA Revamped Central Road Fund 16 Major Works ( DPC 5054 05 800 SA 16 04 ) Chennai (NH)Division 15 . AS / TS / RAS: 31200/ 32500 Widening single lane to intermediate and strengthening GNT road – 3,25,00 2,12 2,72,00 3,22,87 ... Agaram colony km0/0-4/0 CRF-TN-2016-17-71 16 . AS / TS / RAS: 15681 Improvements to Ottivakkam to Manappakkam Road km 0/0 – 2/8 1,56,81 1,02 1,56,00 1,55,79 ... CRF-TN-2016-17-79 17 . AS / TS / RAS: 23337 Improvements to km 13/0- 19/0 of Kumaratchi - Vallam Padhugai Road 2,33,37 ... ... 25,00 91,69 CRF-TN-2017-18-45 18 . AS / TS / RAS: 20000/ 218940 Reconstruction of High level bridge in lieu of existing causeway at 21,89,40 11,92,38 1 9,97,01 ... Km.25/2 of Thiruvannamalai - Thiyagadurgam road CRF-TN-2015-893, dt.14.05.15 19 . AS / TS / RAS: 278910 Construction of Bridge at km 44/8 of Thirumazhisai- Uthukkottai 27,89,10 ... ... 25,00 27,64,10 Road CRF-TN-2017-18-41 20 . AS / TS / RAS: 72400 Widening from SL to IL in Km.0/0 - 7/2, 12/0 - 13/0 and 19/0 - 19/8 of 7,24,00 5,78,38 1 ... ... Chunambedu - Perumbair road CRF-TN-2015-882, dt.14.05.15 21 . AS / TS / RAS: 109800 Providing paved shoulders and strengthening in Km 18/0 - 25/0 of 10,98,00 8,49,42 1 ... ... Thandalam - Perambakkam road to Thakolam - Arugilpadi road CRF-TN-2015-874, dt.14.05.15 4 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT 21 2 Chief Engineer, National Highways 5054 05 800 SA [ ` in Thousands] Expenditure Revised Budget Estimate Budget upto Estimate Estimate Details of Works Amount Estimate 31-3-2017 2017-18 2017-18 2018-19 5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 05 Roads 800 Other Expenditure SA Revamped Central Road Fund 16 Major Works ( DPC 5054 05 800 SA 16 04 ) Chennai (NH)Division 22 . AS / TS / RAS: 74000 Improvements in Km.48/0-51/0 & 52/0-58/0 of Cuddalore - 7,40,00 5,07,49 1 2,32,50 ... Thirukovilur - Sankarapuram road CRF-TN-2015-863, dt.14.05.15 23 . AS / TS / RAS: 61200 Strengthening from km 39/2-51/04 of Thiruvannamalai - 6,12,00 ... ... 25,00 5,87,00 Thiyagadurgam road CRF-TN-2017-18-27 24 . AS / TS / RAS: 50140 Improvements to km 5/6- 19/0 of Cuddalore - Chittur Road 5,01,40 ... ... 25,00 4,76,40 CRF-TN-2017-18-33 25 . AS / TS / RAS: 10400/ 107700 Widening from SL to IL Moogilthuraipattu to Thiruvarangam Km 0/0- 10,77,00 2,33 10,00,00 10,74,66 ... 18/8 CRF-TN-2016-17-135 26 . AS / TS / RAS: 107700 Strengthening to Thiruvannamalai Thiyagadurgam road km 19/2 - 39/20 10,77,00 2,33 11,49,00 10,74,66 ... CRF-TN-2016-17-70 Vellore (NH) Division 27 . AS / TS / RAS: 49950/ 50000 Widening from SL to IL and Improvements to Km 5/4 - 14/4 of Central 5,00,00 ... ... 25,00 4,75,00 Jail - Amirthi Road . CRF-TN-2017-18-44 28 . AS / TS / RAS: 100040 Improvements to Km 30/0-34/0, 46/6-48/4 & 56/0-64/0 of 10,00,40 ... ... 25,00 9,75,40 Abdullapuram - Asanampattu - Alangayam - Tirupattur road. CRF-TN-2017-18-23 5 DEMAND NO.21 - HIGHWAYS AND MINOR PORTS DEPARTMENT 21 2 Chief Engineer, National Highways 5054 05 800 SA [ ` in Thousands] Expenditure Revised Budget Estimate Budget upto Estimate Estimate Details of Works Amount Estimate 31-3-2017 2017-18 2017-18 2018-19 5054 CAPITAL OUTLAY ON ROADS AND BRIDGES 05 Roads 800 Other Expenditure SA Revamped Central Road Fund 16 Major Works ( DPC 5054 05 800 SA 16 04 ) Vellore (NH) Division 29 .
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages168 Page
-
File Size-