CASHLESS TOLLING TA 19-1, Contract D800002 DB CONTRACT DOCUMENTS PART 8 SPECIAL SPECIFICATIONS / EQUIPMENT CUT SHEETS DRAFT February 7, 2019 New York State Thruway Authority This Part 8 – Special Specifications provides access to, and details the Project-specific requirements for the use of, the following documents: 1. NYSDOT/Authority Standard Specifications and Construction Materials 2. NYSDOT/Authority Engineering Information Issuances 3. NYSDOT/Authority Special Specifications. NYSDOT Standard Specifications and Construction Materials The Design-Builder shall use the NYSDOT Standard Specifications Construction Materials in coordination with Part 5 – Special Provisions. The NYSDOT Standard Specifications Construction Materials can be accessed at the following internet link: https://www.dot.ny.gov/main/business-center/engineering/specifications/busi-e-standards-usc. NYSDOT/Authority Engineering Information Issuances The Design-Builder shall use the relevant NYSDOT/Authority engineering information issuances, which include: 1. Engineering Instructions (EI); 2. Engineering Bulletins (EB); 3. Engineering Directives (ED). The above listed engineering information issuances can be accessed at the following internet link: https://www.dot.ny.gov/main/business-center/consultants/forms-publications-and- instructions/engineering-information-issuance-system NYSDOT Special Specifications The Design-Builder may submit to use NYSDOT/Authority Special Specifications which are listed in the Electronic Pay Item Catalog (e-PIC) (requires Authority acceptance) and which have received General Approval, and shall use any NYSDOT/Authority Special Specifications which are referenced in this Part 8 or elsewhere in the Contract Documents. Delete and ignore sections in the NYSDOT/Authority Special Specifications titled Method of Measurement and Basis of Payment from the NYSDOT/Authority Special Specifications. NYSDOT Special Specifications can be accessed at the following internet link: https://www.dot.ny.gov/main/business-center/engineering/specifications/special-specifications-us. The NYSTA Special Specifications may be accessed Via a written request provided at the One on One meetings with names of firm’s personnel needing access. Cashless Tolling i Part 8 - SpecialSpecifications TA 19-1, Contract D800002 DRAFT February 7, 2019 New York State Thruway Authority The following Special Specifications are attached herein: ITEM 502.90010018 – CLEAN AND FILL CRACKS AND JOINTS IN PORTLAND CEMENT CONCRETE (PCC) PAVEMENT, ASTM D 6690 TYPE IV ITEM 606.9575--25 - MEDIAN BARRIER GATE SYSTEM (INSTALLED) ITEM 637.11----25 – ENGINEER'S FIELD OFFICE TYPE 1 ITEM 645.4530--25 – DYNAMIC MESSAGE SIGN (DMS) FULL MATRIX, FRONT ACCESS LED - DB ITEM 645.4520--25 - TOLL LANE VARIABLE MESSAGE SIGN ITEM 646.0603--25 – INSTALL DELINEATOR OR TENTH MILE MARKER ON POST ITEM 646.0604--25 – INSTALL DELINEATOR OR TENTH MILE MARKER, BACK- TO-BACK ON POST ITEM 646.0610--25 – INSTALL DELINEATOR OR TENTH MILE MARKER, BAND OR BRACKET MOUNTED ITEM 646.0612--25 – INSTALL DELINEATOR OR TENTH MILE MARKER, BACK- TO-BACK, BAND OR BRACKET MOUNTED ITEM 646.0626--25 – INSTALL MILE MARKERS ITEM 646.0801--25 – INSTALL SNOWPLOW MARKER, SINGLE UNIT ITEM 646.0802--25 – INSTALL SNOWPLOW MARKER, DOUBLE UNIT ITEM 646.10320025 – RESET EXISTING DELINEATORS OR MARKERS ITEM 646.50----25 – REMOVE AND DISPOSE DELINEATORS AND MARKERS ITEM 651.02001525 – CCTV CAMERA MOUNTING POLE ITEM 651.0201-25 – CAMERA LOWERING DEVICE ITEM 651.9908XX25 – FIBER OPTIC COMPONENTS – DB ITEM 662.74125325 – HDPE INNERDUCT 1.25 INCH ID – DB ITEM 680.5830--25 – PREFORMED INDUCTANCE LOOP DETECTOR (CAST IN PLACE) INSTALLATION ITEM 680.5860--25 – PREFORMED INDUCTANCE LOOP DETECTOR (ASPHALT OVERLAY) INSTALLATION ITEM 680.8020XX25 – CABINETS FOR ITS EQUIPMENT Cashless Tolling ii Part 8 - SpecialSpecifications TA 19-1, Contract D800002 DRAFT February 7, 2019 New York State Thruway Authority ITEM 683.6730--25 – CCTV CAMERA SITE EQUIPMENT - PEDESTAL MOUNT ITEM 683.9805XX--25 – TOLL FACILITY SECURITY SYSTEM SERIALIZED – DB ITEM 685.17XX--25 – HIGHLY REFLECTORIZED TRIPLE DROP EPOXY PAVEMENT STRIPES, 6 INCH WIDTH ITEM 690.6202--25 – INSTALLATION OF TOLL TREADLE FRAME 1 ITEM 697.0203--25 – FIELD CHANGE ORDER (THRUWAY) ITEM 800.01000015 – DESIGN BUILD – DESIGN SERVICES ITEM 800.02000015 – DESIGN BUILD – CONSTRUCTION INSPECTION SERVICES ITEM 800.03000015 – DESIGN BUILD – QUALITY CONTROL SERVICES ITEM 800.04000025 – DESIGN BUILD – FORCE ACCOUNT WORK ITEM 800.05000015 – DESIGN BUILD – SITE MOBILIZATION ITEM 800.0600NN15 – DESIGN BUILD – CONSTRUCTION WORK In the event of a discrepancy between the version of any Special Specification attached herein and the version available from the NYSDOT/Authority web site listed above, the version included in these Contract Documents shall apply. Cashless Tolling iii Part 8 - SpecialSpecifications TA 19-1, Contract D800002 DRAFT February 7, 2019 ITEM 502.90010018 - CLEAN AND FILL CRACKS AND JOINTS IN PORTLAND CEMENT CONCRETE (PCC) PAVEMENT, ASTM D 6690 TYPE IV DESCRIPTION. Clean and fill the following cracks and joints that are 1/4 - 1 inch wide at the locations indicated in the contract documents: • New transverse contraction joints within full depth repairs. • Existing transverse and longitudinal joints outside new full depth repairs. • Existing cracks. Do not clean and fill: • Transverse and longitudinal joints that define new full depth repair boundaries. • New longitudinal joints within full depth repairs. MATERIALS. Highway Joint Sealants (ASTM D 6690 Type IV)..............................................................................705-02 Backer Rods............................................................................................................. ASTM D5249 (Type 1) In addition to meeting the requirement of ASTM D5249 (Type 1), backer rods must have a diameter at least 25% wider than the location of the crack it is placed into. The Department may perform supplementary sampling and testing of the sealant. Deliver sealant in the Manufacturer’s original sealed container legibly marked with the: • Manufacturer’s name. • Trade name of the sealant. • Manufacturer’s batch or lot number. • ASTM D 6690, Type IV. • Minimum application temperature. • Maximum (or Safe) heating temperature. CONSTRUCTION DETAILS. If diamond grinding is included in the contract documents, prepare the joints and cracks, diamond grind the pavement, then clean and fill the joints and cracks. Prepare New Transverse Contraction Joints Within Full Depth Repairs. Widen the joint to 1/4 – 3/8 inch for a depth of 1 inch if the first stage saw cut is less than ¼ inch wide. Use diamond blade saws equipped with cutting guides, blade guards, water cooling systems, dust controls, and cut depth control. Immediately wash the slurry from the pavement such that it does not re-enter the joint. Do not place backer rod in these joints. Prepare Existing Transverse and Longitudinal Joints. Use a 1/8 – 1/4 inch wide, 1 5/8 inches deep saw cut to dislodge debris and existing sealant or filler from the joint without damaging the joint faces. Follow the saw cut with a compressed air blast to remove the dislodged debris to the bottom of the existing joint sealant reservoir or to a depth of 3 inches if there is no existing reservoir. Install a trap or other device on the compressed air equipment to prevent oil from contaminating the joint surfaces. Supplement the air blast with mechanical removal, such as a screwdriver, if it is not sufficient to remove the debris. Do not damage the joint faces. Immediately wash or sweep the dislodged debris from the pavement such that it does not re-enter the joint. Do not place backer rod in these joints. Prepare Existing Cracks. Remove all debris from existing cracks as deep as possible using a compressed air blast supplemented with mechanical removal. Install a trap or other device on the compressed air EI 05-015 Rev. L 09/08/05 EI 03-012 Page 1 of 3 L 09/11/03 ITEM 502.90010018 - CLEAN AND FILL CRACKS AND JOINTS IN PORTLAND CEMENT CONCRETE (PCC) PAVEMENT, ASTM D 6690 TYPE IV equipment to prevent oil from contaminating the crack surfaces. Immediately wash or sweep the dislodged debris from the pavement such that it does not re-enter the joint. Backer rod may be placed after cleaning provided it is at least 25 % wider than the crack everywhere along the crack and is placed 2 inches beneath the pavement surface. Cleaning. Clean the joints and cracks by abrasive blasting before filling. Do not allow any traffic on the pavement between cleaning and filling. Reclean if it rains between cleaning and filling. Sealant Melting. Provide the Engineer a copy of the sealant Manufacturer’s recommendations for heating and application at least 24 business hours before filling. Follow those recommendations for heating and application. Unless stated otherwise, the recommended pouring temperature is 10ºF below the Manufacturer's designated safe heating temperature, with an allowable variation of ± 10ºF. Heat the sealant in a melter constructed either: • As a double boiler with the space between inner and outer shells filled with a heat-transfer medium. • With internal tubes or coils carrying the sealant through a heated oil bath and into a heated double wall hopper. Do not use direct heating. Use a melter capable of maintaining the pouring temperature that is equipped with: • Positive temperature controls. • Mechanical agitation or a re-circulation pump capable of providing homogeneous sealant. • Separate thermometers indicating
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages214 Page
-
File Size-