NORTH CENTRAL RAILWAY RAEBARELI PARLIAMENTARY CONSTITUENCY Uttar Pradesh, the most populous state of Nation is served by North Central Railway along with Northern, North Eastern M. C. Chauhan and East Central Railways. Indian Railways (IR) plays a very General Manager important role in development of the state and provides North Central Railway connectivity for freight and passengers, including international tourists. IR has a history of more than 160 years in the state and has the highest route kilometers - 9100 route kilometers - within it, which is 14% of entire railway network. IR has made Uttar Pradesh proud by giving it Nation's first semi high speed train Gatimaan Express, which initially ran between Agra and Delhi. It has now been extended upto Jhansi with effect from 01.04.2018 - a move that will boost tourism in bundelkhand region of Uttar Pradesh. Efforts for further development of railway infrastructure in Uttar Pradesh have been intensified in last four years with 376% more investment in comparison to previous years. Results of such a massive investment are becoming visible with enhanced infrastructure and modern passenger amenities. Soon the era of congestion and inconvenience will be a matter of past and a new Railway equipped with state-of-the-art facilities will be able to serve the citizens with greater level of satisfaction. The longest stretch of the under construction Eastern Dedicated Freight Corridor i.e. almost 57% of the entire length lies in Uttar Pradesh from Pt. Deen Dayal Upadhyaya Jn. to Ghaziabad. In this brochure, we have compiled the important contributions and achievements of Indian Railways in the development of the RAEBARELI constituency of Uttar Pradesh in the last four years. I hope that it will serve as a ready reckoner for those eager to know about the role of Railways in the development of this constituency. It may be noted that the budgets allocated to various projects are not apportioned constituency wise but reflect the cost of the project. INPUTS BY RAILWAY IN RAEBARELI PARLIAMENTARY CONSTITUENCY RAEBARELI PARLIAMENTARY CONSTITUENCY A. ASSEMBLY SEGMENTS Bachhrawan, Harchandpur, Raebareli, Sareni, Unchahar. B. WORKS COMPLETED IN LAST FOUR YEARS 1. INFRASTRUCTURAL DEVELOPMENT Raebareli Station l Facade lightning with LED and LED based station name board at Raebraeli Station. lConstruction of New washable Apron at Platform No. 1 at Raebareli Station. lLED lights at Railway platform at Raebareli Station. lRaising of platform from rail level to medium level at Bani Station. lExtension of platform No. 2, 3 from existing 180 mtr. to 580 mtr. and resurfacing of platforms at Unchahar. lBachhrawan-Kundanganj-Road Over Bridge in lieu of level crossing No.175-B 2. lImprovement of small shelters at station Harcharanpur, Kankaha, Shrirajnagar, Nigoha, Mohanlalganj, Gangaganj, Rupamau, Talakhajuri, Mishrauli, Takia, Fatehpur, Fursatganj, Chouras, Bighapur stations. 2. IMPROVEMENTS IN PASSENGERS AMENITIES lPlatform shelters at platform-2 and 3 at Dalmau station. l Installation of 2 Water vending machines on platforms at Raebareli stations. lConstruction of waiting room at Bachrawan station. lLED Lights have been provided at all stations. C. OTHERS DEVELOPMENTS New Train/Stoppages over Raebareli Constituency lTrain No. 14101/14102, Prayag- Kanpur Express at Unchahar, Jalalpur Dhai, Dalmau, Lalganj and Raghuraj Singh. lTrain No. 13429/13430, Malda Town- Anand Vihar Express. lTrain No. 14259/14260, Lucknow- Mughalsarai Ekatmata Express. D. ON-GOING WORKS New Line: lUnchahar - Amethi (66.17 Km.) lFaizabad-Lalaganj Via Akbarganj, Maharajganj and Raebareli (116 Km.) Doubling: lUtraitia - Rae Bareli (65.6 Km.) lRaebareli-Amethi (60.1 Km.) lPhapamau-Unchahar-Raebareli section of 110 Km alongwith electrification. Other Works: lRailway electrification work on Utraitia-Janghai section of existing line by Rail Vikas Nigam Limited (RVNL). lDevelopment of Raebareli station in association with Ministry of Tourism. lImprovement of Rail Level goods platform adjacent to line No. 3 at Dariapur station. lRaebareli-Improvement of Drainage system in and around Raebareli Station. lElimination of unmanned level crossings by diversion of approach roads and merger into adjacent manned level crossing. lIntegrated Emergency Response Management system video surveillance system at Raebareli Jn. lImprovement of platform surface at station Kankaha, Srirajnagar, Rupamau. Talakhajuri, Mishrauli, Takiya & Dalmau. lDisplay system at platform and waiting rooms for Train enquiry at class A1, A and B stations of Lucknow Division. lAugmentation of public address equipment system with computerised announcement system at Lalganj, Jais stations. lRaebareli- Yard remodeling. lUnchahar-Raebareli-2 lane Road over bridge in lieu of level Crossing No. 24-A near Raebareli. lACs in running room of Raebareli and Unchahar. lAdditional over head tank with tubewell at Unchahar Station. Road Over Bridge at Raebareli Yard Limited Height Subway at Raebareli Yard.
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages4 Page
-
File Size-