Bioenergy in Nakusp and Around BC

Bioenergy in Nakusp and Around BC

Bioenergy in Nakusp and around BC November 22, 2013 David Dubois - Project Coordinator Wood Waste to Rural Heat Project Wood Waste to Rural Heat - Project Goals Work with communities, First Nations and Not-for-Profits assisting them to understand and adopt biomass heating solutions Previously known as the Green Heat Initiative Independent source of Information What does Wood Waste to Rural Heat (WW2RH) do? • Free technical assistance to help determine the best biomass heating solution for the specific application based on the proponents needs. • Developing business cases to help proponents make critical decisions. • Commercial, institutional, and municipal not residential Biomass Heating - Using Wood Chips or Pellets as Fuel Tatla Lake School Enderby District Heating System Baldy Hughes Treatment Centre Biomass District Heat After – Biomass Fired Before – Oil Fired Biomass Heating does not refer to… http://planning.montcopa.org/planning/cwp/fileserver,Path,PLANNING/Admin%20- http://www.thefullwiki.org/Beehive_burner %20Publications/Renewable_Energy_Series/Hydronic_heaters_web.pdf,assetguid,63 e45ed6-2426-4548-bc6dcfb59d457833.pdf How much do I need? Typical Biomass Consumption by Usage 500000 45000 450000 12,000 Truck Loads 40000 1,000 400000 Truck 35000 Loads 350000 30000 300000 25000 250000 20000 5,000 Truck Loads 200000 15000 150000 Tonnes of Biomass per Year Biomass of per Tonnes 10000 100000 20 5000 Truck 50000 Loads 0 0 5 MW Enderby Pellet Plant Power Plant 5MW Community EnderbyCommunity Electricity Electricity Nakusp – Current Energy Costs Unit Fuel Type Sale Retail Price $35.00 size Arena $30.00 kWh Electricity ¢7.4-10.1/kWh ESB $25.00 kWh ¢9.8-10.9/kWh Electricity Public Works $20.00 kWh Electricity ¢8.6-11.0/kWh $15.00 ESB Propane Litres ¢55.3-77.7/l Cost$/GJ Public Works $10.00 Litres Propane ¢57.0-77.9/l Bone $5.00 Hog Fuel/ Dry $5-100/Tonne Wood Chips $- Tonne Pellets Tonne $190-230/tonne (Retail) Nakusp • Current Work High 1) Building inventory review School i. Current Heating System ESB ii. Current fuel costs iii. Physical Layout 2) Preliminary review Total Distance = 700 m (currently being done) 3) Detailed Case study (early 2014) • WW2RH no cost so low risk • 250 BDT or 10 ‘B’ trains per Arena year • First Step Business Components of a DH System Input from Forest Heat Fuel Supply Heat Production Distribution Output to Individual Business Components Heat Clients Combined Business Components Single DH Business Ownership of DH System Private Public Ownership Ownership • Anchor Client • Sawmill • Village • Logger • Regional District • Woodlot • Province • Value added Partnership • Other • Community Forest • Not for profit • For Profit Fink District Heating System in Enderby – Technical Specs • 540 kW wood chip fired boiler • 640 m of trench • 8,400 l heat storage tank • 50 tonne fuel storage bunker – enough for two 53’ trucks to unload • Natural gas peaking boiler • Consumes 800 tonnes/year of biomass • Biomass is from sawmills, wood manufacturing and clean construction debris • Greenfield Development Heat Storage Tank Fuel Storage Bunker Fink District Heating System in Enderby – Con’t Lillooet REC Centre Case Study Using propane to heat swimming pool, arena, library and gym Installed 400 kW pellet boiler with 45 tonne storage silo Also did some building and mechanical system upgrades Full case study available at www.ruralbcgreenenergy.com Lillooet Capital Cost and Funding Capital Costs Funding Project Management and $111,000 Gas Tax Innovation Fund $467,000 Engineering District of Lillooet Biomass Boiler $312,000 $238,000 Reserve Building Upgrades $207,000 TOTAL $705,000 Sub-Total $630,000 Taxes $75,000 TOTAL $705,000 Lillooet Rate of Return Without Boiler Only Grants Total Capital $411,000 $411,000 DoL Investment $140,000 $411,000 Savings1 $26,000 $26,000 Payback 5 Years 16 Years NPV2 $97,000 -$21,000 IRR 17% -1% 1. Does not include avoided costs of carbon 2. 15 years and 7% Granisle Firehall Granisle Capital Cost and Funding Funding Gas Tax Innovation Fund $34,500 OBAC $20,000 Village $6,300 Capital Costs TOTAL $60,800 Project Management and $6,200 Admin Biomass Boiler $32,500 Container and Upgrades $22,100 TOTAL $60,800 Granisle Rate of Return BFP – Without Gas BFP – with all BFP – without Tax and OBAC grants OBAC $60,800 Total Project Cost $60,800 $60,800 $0 OBAC Grant $20,000 $0 $0 Gas Tax $34,500 $34,500 $60,800 VG Contribution $6,300 $26,300 (including In-kind) Fuel Savings $3,900 $3,900 $3,900 Simple Payback < 2 Years 8 Years 16 Years Net Present Value $42,300 $22,300 -$12,200 (20 years and 5%) Internal Rate of 2% 62% 14% Return Biomass to Electricity in Operation Current Power Purchase Agreements with BC Hydro in Operation Non Pulp and Paper Atlantic Power - Williams Lake – 68 MW Louisiana Pacific – Golden – 8 MW Tolko – Armstrong – 20 MW Pulp and Paper Zelstoff Celgar – Castlegar – 78 MW Canfor – Prince George – 60 MW Cariboo Pulp – Quesnel – 61 MW Paper Excellence – Skookumchuk – 51 MW Harmac - Nanaimo – 55 MW Howe Sound Pulp and Paper – Port Mellon – 112 MW Domtar – Kamloops – 76 MW Catalyst Paper – Powell River – 38 MW Biomass to Electricity in Development • Current projects in development as with BC Hydro West Fraser - Chetwynd - 12 MW West Fraser – Fraser Lake – 12 MW Tolko – Kelowna – 4.9 MW West Fraser x 3 – Quesnel – 13.7, 14.8, 14.8 MW Fort St. James Green Energy – Dalkia – 40 MW Merritt Green Energy – Dalkia – 40 MW Intercon Pulp - Canfor PG – 32 MW Northwood Pulp – Canfor PG – 63 MW Conifiex x 2 – Mackenzie – 36, 11.4 MW Biomass to Electricity in Development • Current Options 1. Standing Offer - 50 kW to 15 MW 2. Net Metering – up to 50 kW 3. Integrated Customer Solution 1 MW electric = 5000 BDT/yr. Nechako Lumber Vanderhoof OR . 2.2 MW ORC 200 B’ trains/yr. = 4 B’ . Reduces Electricity by 1/3 trains/wk. • Current Rates $100-130 MWh? • Long process with upfront costs Contact For more information www.woodwaste2ruralheat.ca Or Contact me David Dubois, BSChE Project Coordinator [email protected] 800-661-2293 250-457-7319 .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    24 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us