Appendix a Capital Structural Maintenance

Appendix a Capital Structural Maintenance

APPENDIX A CAPITAL STRUCTURAL MAINTENANCE PROGRAMME 2007/2008 – ‘A’ Roads ROAD COST VILLAGE LOCATION DESCRIPTION NOTES No BAND Major maintenance Derby Road / A6006 Construction due A6 Hathern and installation of A Zouch Road junction. 2nd quarter traffic signals Ashby Road/Epinal Way Carriageway Construction due A512 Loughborough C Island Resurfacing 2nd quarter Carriageway Construction due A6004 Loughborough Belton Road Phase 2 C Resurfacing 2nd quarter Ashby Road Junction 23 Carriageway A512 Shepshed C Reserve Scheme Island Resurfacing Ashby Road Junction 23 A512 Shepshed Surface Dressing C Complete to Snells Nook Road A607 Syston Northern Bypass Surface Dressing C Complete Newarke Road/Melton Carriageway Construction due A607 Thurmaston Road Island (ASDA Resurfacing B 2nd quarter Island) Newarke Road Surface Dressing A607 Thurmaston C Complete Southbound Cost band Key:- C < £50k; B £50k - £200k; A > £200k 1 E:\moderngov\data\published\Intranet\C00000699\M00001950\AI00017103\AppendixA0.doc APPENDIX A CAPITAL STRUCTURAL MAINTENANCE PROGRAMME 2007/2008 – OTHER ROADS ROAD COST VILLAGE LOCATION DESCRIPTION NOTES No BAND Carriageway C3206 Anstey The Nook Resurfacing C Complete Carriageway U/c Anstey Stadon Road Resurfacing C Complete Carriageway Construction due U/c Anstey Link Road C Resurfacing 2nd quarter Carriageway Construction due C3301 Barkby Beeby Road C Resurfacing 2nd quarter Carriageway C4304 Barkby Queniborough Road Resurfacing C Reserve Scheme Carriageway Construction due U/c Barkby Thorpe Queen Street/Thorpe Road C Resurfacing 2nd quarter C3301 Hungarton Lane/Main Resurfacing and Beeby C Reserve Scheme C3303 Street Edge Repairs Carriageway Construction due C3207 Cropston Cropston Road C Resurfacing 2nd quarter Carriageway Construction due C6204 Loughborough Meadow Lane C Resurfacing 2nd quarter Carriageway Construction due C3212 Shepshed Brook Street B Resurfacing 3rd quarter Carriageway U/c Shepshed Church Street Resurfacing C Reserve Scheme Carriageway Construction due U/c Tickow Lane C Shepshed Resurfacing 3rd quarter Carriageway U/c Sileby Highgate Road Resurfacing C Reserve Scheme Carriageway Construction due C3303 South Croxton South Croxton Road Resurfacing C 2nd quarter Leicester Lane/Swithland Haunch Construction C4203 Swithland Road Carriageway C starts 1 st quarter Leicester Lane/Swithland Carriageway C4203 Swithland Reserve Scheme Road Resurfacing C Carriageway Construction due C5204 Swithland Main Street Phase 1 C Resurfacing 2nd quarter C3308 Carriageway Construction due Syston Melton Road/High Street rd C4302 Resurfacing C 3 quarter Carriageway Construction due C4301 Syston Barkby Road rd Resurfacing C 3 quarter 2 E:\moderngov\data\published\Intranet\C00000699\M00001950\AI00017103\AppendixA0.doc C3307 Carriageway Construction due Syston Fosse Way/Wanlip Road rd C3307 Resurfacing C 3 quarter Carriageway C3203 Thurcaston Leicester Road Phase 2 Reserve Scheme Resurfacing C Haunch Construction due C7204 Ulverscroft Charley Road Carriageway B 2nd quarter Carriageway Construction due C3208 Ulverscroft Joe Moores Lane Resurfacing B 2nd quarter Carriageway Construction due U/c Wymeswold Narrow Lane Phase 4 B Resurfacing 2nd quarter Cost band Key:- C < £50k; B £50k - £200k; A > £200k 3 E:\moderngov\data\published\Intranet\C00000699\M00001950\AI00017103\AppendixA0.doc APPENDIX A CAPITAL STRUCTURAL MAINTENANCE PROGRAMME 2007/2008 FOOTWAY RECONSTRUCTION ROAD COST VILLAGE LOCATION DESCRIPTION NOTES No BAND In association with Construction due C3301 Barkby Beeby Road carriageway C 2nd quarter resurfacing Footway Construction due C5213 Barrow Sileby Road (Bridge) C Resurfacing 3rd quarter Footway Construction due C5213 Barrow Sileby Road C Resurfacing 3rd quarter Footway u/c Birstall Johnson Road C Reserve Scheme Resurfacing In association with Construction due C3207 Cropston Cropston Road carriageway C 2nd quarter resurfacing Countrymans Way/Squires Footway u/c East Goscote C Complete Corner Resurfacing Footway u/c Loughborough Crosshill Lane Resurfacing C Reserve Scheme Footway Construction due u/c Loughborough Market Place C Resurfacing 2nd quarter Footway u/c Loughborough New Ashby Road Resurfacing B Complete Footway u/c Loughborough Old Ashby Road Resurfacing C Reserve Scheme Footway Construction due u/c Loughborough Thorpe Hill C Resurfacing 2nd quarter In association with Construction due C3212 Shepshed Brook Street carriageway C 3rd quarter resurfacing In association with Construction due u/c Shepshed Tickow Lane carriageway C 3rd quarter resurfacing In association with Construction due C5204 Swithland Main Street Phase 1 carriageway C 2nd quarter resurfacing Footway Construction due u/c Thurmaston Lonsdale Road C Resurfacing 3rd quarter Cost band Key:- C < £50k; B £50k - £200k; A > £200k 4 E:\moderngov\data\published\Intranet\C00000699\M00001950\AI00017103\AppendixA0.doc .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    4 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us