(R&B) Department Kashmir

(R&B) Department Kashmir

Finanical details of State Sector Roads (Projectization) during 2015-16 (R&B) Department Kashmir (Rs in lakhs) Physical Progressive Year of Target Expdt Revised cost Name of the Project/ Cost of Date of Progress of expdt to the Payment S.No. Commenc Year of during the if any/date Work work sanction work in end of the pending edment completion year of revision Percentage year 1 2 3 4 5 6 7 8 9 10 11 DISTRICT SRINAGAR Srinagar Charisharief road 1 176.22 2012-13 2012-13 com 100% 23.57 176.22 0.00 176.22 Km 1st to 5th Road connecting old Airport with I.G road at Peerbagh.(bund road), Yayil, Gousia Colony, allied links/Pilot Project RBI Tech and other link roads in Amira Kadal Constituency/ Impvt of 2 305.56 2011-12 2011-12 2018-19 56% 22.00 172.40 133.16 305.56 road from Alamdar Colony behind Green Valley School with RCC culvert/Drain in Lane E Alamdar Colony Rawalpora bridge from the house of Late Bashir Ahmad Bhat to main road L.D Colony roads at Wazabagh Hyderpora Usmania Colony, Gooripora, Goriwan, Sanatnagar, Majid 3 bagh, Perbagh/Budshah 300.36 2011-12 2011-12 2018-19 62% 14.00 184.86 115.50 300.36 colony roads at Sanatnagar//Const. of Goripora Peerbagh road & contr of surface drain Roads at Chanapora (Madina Colony Lone Mohalla, Batpora Link, Ahlihadees Masjid, Rose lane, Khan Colony, Garden Lane, Bagi Islam, Masjid Murtaza, Mustafa Colony, 4 300.00 2011-12 2011-12 com 100% 0.00 300.00 0.00 300.00 Iqbal Colony links, Pamposh Colony etc., Abu Baker Masjid Chanapora/Roads in Housing Colony Chanpora/Khan Colony/Impvt /ugprd of Garden lane Chanpora Budshahnagar roads, Shahi Hamdan Colony, Stadium colony, Disoz Colony, Jamia Masjid Natipora, Tawheed lane, Irfan Colony/Iqbal 5 308.44 2011-12 2011-12 2017-18 76% 18.50 234.73 73.71 308.44 Colony/Upgrd/ impvt link road Azad Basti Natipora/Jamia Masjid Natipora road/Upgrd/impvt of Irfan Colony Natipora Flood Channel Bund road, 6 250.00 2011-12 2011-12 2018-19 22% 7.50 56.00 194.00 250.00 Peerbagh right side Friends enclave,Soz link road, Humhama Baginder link, Humhama link near Islamia school,Airport Avenue,Bund rroad , Nadirgund link, Umerabad-B, Old Peerbagh,Friends link,Batpora Hyderpora Al- 7 530.00 2011-12 2011-12 209-20 33% 35.00 177.54 352.46 530.00 farooq Lne and Hair Angan Hyderpora, Habib Colony, Parraypora, Post office lane, Jahangir Colony Hyderpora, Friends Colony/enclave Humhama/Post office Lane Hyderpora in Km 6th of I.G road 8 Roads in Jawahir Nagar 256.31 2009-10 2009-10 2016-17 93% 16.88 237.90 18.41 256.31 Kursoo Aramwari Rajbagh links [Spring field lane, Lowerence Vidyaliya lane, Kabeer lane, Ansari lane, Iqbal colony, Aramwari links, Masjid Musahib, Alnoor 9 colony, Sheikh colony to 256.16 2009-10 2009-10 2016-17 92% 0.00 236.28 19.88 256.16 Mehjoor link, new lanes Kursoo bund, zero bridge to graveyard, widening Huryat office to Kursoo bund, Convent square lanes, Dr Dhar to Comrade Inn] 10 Roads in Lal Chowk area 278.92 2010-11 2010-11 2016-17 100% 23.50 277.64 1.28 278.92 11 Gulbahar colony links 115.00 2011-12 2011-12 com 100% 8.32 115.00 0.00 115.00 12 Roads Sadder Court Complex 45.00 2012-13 2012-13 2016-17 98% 20.00 44.00 1.00 45.00 Page 1 of 6 Physical Progressive Year of Target Expdt Revised cost Name of the Project/ Cost of Date of Progress of expdt to the Payment S.No. Commenc Year of during the if any/date Work work sanction work in end of the pending edment completion year of revision Percentage year 1 2 3 4 5 6 7 8 9 10 11 Impvt. of road at Hakim Bagh near HS Rawalpora/Impvt. of road network at Rawalpora Housing Colony Gooripora Majeedbagh/Al-Farooq Colony (adjacent to Hakimbagh) Rawalpora, 13 391.31 2011-12 2011-12 2019-20 60% 45.00 235.31 156.00 391.31 Astanpora/ Wanbal, Gulzarpora, Rawalpora Housing Colony, Hill View Colony, Charam Wood, Watalpora, Canal Avenue, Bank Colony, Baghat Chowk to Sanat Nagar & allied links. Upgrd of road network at Mehjoor Nagar, Khal SIDCO 14 lane/Mustafa Colony 1204.01 2011-12 2011-12 2020-21 27% 87.00 330.06 873.95 1204.01 Rambagh & adjacent links/ Mehjoor Nagar roads Hamdanai Colony Bemina 15 640.31 2011-12 2011-12 2020-21 5% 13.00 30.20 610.11 640.31 road Impvt/extension of road sector 3 lane-2 Gulberg 16 25.00 2013-14 2013-14 2016-17 88% 16.00 22.00 3.00 25.00 Colony Hyderpora Srinagar/ Gulberg colony roads Upgrd of Iram Lane at 17 Natipora, Sector K - Sub lane 30.00 2013-14 2013-14 2017-18 60% 13.00 18.00 12.00 30.00 1 & 2 Upgrdation of Shah Anwar 18 /Gulberg & Gulbahar Colony 75.00 2012-12 2012-12 2018-19 65% 41.51 48.51 26.49 75.00 Road Roads in Lal Chowk area 19 50.00 2013-14 2013-14 com 100% 28.00 50.00 0.00 50.00 (Phase-II) Dev/constr of approach road to Residential Colonies from 20 Lasjan tupo Tengpora Bridge 75.00 2013-14 2013-14 2017-18 67% 14.00 50.00 25.00 75.00 (both sides) incld internal links of Gangbugh Roads at Allochibagh and Solina (Inner links at Allochibagh, Link road at Solina Payeen from Govt Qtr (Opp Shalimar Bakers to 1 271.80 2010-11 2010-11 2016-17 97% 21.37 262.68 9.12 271.80 graveyard), Link road at Solina Payeen from Modern High School (Near Indian Guest House to Masjid Ahal-i- Hadees) Hilalabad and Qamarabad 2 487.85 2008-09 2008-09 2018-19 86% 24.04 421.24 66.61 487.85 Roads at Qamarwari Mustafaabad link roads at 3 304.89 2008-09 2008-09 2017-18 94% 15.33 285.18 19.71 304.89 Zainakote Road from Shalteng crossing 4 260.84 2011-12 2011-12 2017-19 90% 41.17 234.95 25.89 260.84 to H.M.T with allied links H.M.T roads towards 5 Zainakote alongwith allied 266.33 2011-12 2011-12 2018-19 88% 22.19 233.47 32.86 266.33 links Links from left side of road 6 254.50 2011-12 2011-12 2017-18 94% 32.43 238.76 15.74 254.50 from Shalteng to Narbal Roads in Gogjibagh around 7 A.S.College and in Tulsibagh 199.78 2011-12 2011-12 2017-18 88% 6.13 176.71 23.07 199.78 area behind Govt Quarters Roads in Housing Colony, 8 Bemina(Nundi Reshi Colony) 195.09 2011-12 2011-12 2018-19 58% 14.53 113.68 81.41 195.09 incld other allied links. Road from Magarmalbagh to 9 183.81 2011-12 2011-12 com 100% 22.09 183.81 0.00 183.81 Shergadi Link road from NH (near Tengpora) to Muslimabad, 10 224.90 2011-12 2011-12 2019-20 39% 12.09 87.07 137.83 224.90 Sector Ist incld all links on both sides Main road in sector 1 at 11 Gulshanabad.Main road in 150.00 2012-13 2012-13 2018-19 62% 6.85 93.70 56.30 150.00 sector 2 & 3 at Gulshanabad. Link road on left side in SK 12 Colony incld link near Police 111.55 2013-14 2013-14 com 100% 36.30 111.55 0.00 111.55 Housing Colony Mehrajpora link road lane-15 13 86.25 2013-14 2013-14 2017-18 83% 16.59 71.28 14.97 86.25 Firdousabad 14 Lane No.9/9A at Firdousabad 70.00 2012-13 2012-13 2017-18 43% 8.08 30.35 39.65 70.00 Constr of bund road from 15 Mujgund to Checki Hargopal 108.39 2013-14 2013-14 2018-19 33% 13.67 35.39 73.00 108.39 B/way of GSB/WBM G-II 16 Upgrd of roads at Bemina 495.00 2013-14 2013-14 2020-21 20% 20.25 97.11 397.89 495.00 Budshah bridge to PCR 17 crossing via New Sectt. 172.20 2013-14 2013-14 2018-19 70% 70.50 121.30 50.90 172.20 Crossing invl. HSHS & flyover 18 Firdousabad main road 40.95 2013-14 2013-14 com 100% 11.83 40.95 0.00 40.95 Page 2 of 6 Physical Progressive Year of Target Expdt Revised cost Name of the Project/ Cost of Date of Progress of expdt to the Payment S.No. Commenc Year of during the if any/date Work work sanction work in end of the pending edment completion year of revision Percentage year 1 2 3 4 5 6 7 8 9 10 11 Roads at Shahwaliyat Colony & Shahnaqashband colony on 19 76.90 2013-14 2013-14 2017-18 70% 7.95 53.95 22.95 76.90 right city sub-division side of NH near Umerababd Link on Bemina Budgam road 20 90.00 2013-14 2013-14 2016-17 90% 20.33 80.68 9.32 90.00 via Iqbalabad Upgradation of Malroo link 21 379.68 2009-10 2009-10 2017-18 85% 26.22 324.31 55.37 379.68 roads Upgrad.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    6 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us