GUJARAT GAS Ref.: GGL/Panchmahal GA/PF-0.0754 Ha./ Compliance Report /2020/02C Date: 11/09/2020 To, The Deputy Conservator of Forest Social Forestry Division Godhra. Sub.: Submission of Compliance Report of Stage-ll Permission — Diversion Area: 0.0754 Ha.: Diversion of Protected Forest Land For Laying of Proposed 6" Dia. Steel Gas Pipeline Along & Across SH-5 Asphalt Road (Godhra-Lunawada) (Halol-Godhra-Shamlaji Toll Road) from GGL COCO CNG to Franchisee CNG Station (Mr. Jasvantbhai Patel) in Halol village, Halol Taluka of Panchmahal district. (754.40 Sq.m. i.e. 0.0754 Hectares Area.) Ref.: 1) Appli. Letter No. GGL/Panchmahal GA/Taluka- Halol/PF- 0.0754Ha/2020/02, Dtd. 27/02/2020 2) In-Principal Permission No. FCA-1020/5-27/20/SF-153/F— Dtd. 24.08.2020 3) DCF, Panchmahal — Demand Note No. C/JMN/9/271-74/2020-21 — Dtd. 25.08.2020 4) Online Challan No. 7244833545 Dtd. 29.08.2020 5) GGL Payment Advice on Dtd. 29.08.2020 Dear Sir, We appreciate for granting us Stage—I "In-Principle permission" vide letter no. FCA-1020/5-27/20/SF- 153/F— Dtd. 24.08.2020 for diversion of Proposed 6" Dia. Steel Gas Pipeline Along & Across SH-5 Asphalt Road (Godhra-Lunawada) (Halol-Godhra-Shamlaji Toll Road) from GGL COCO CNG to Franchisee CNG Station (Mr. Jasvantbhai Patel) in Halol village, Halol Taluka of Panchmahal district. Further, in order to obtain Stage-II permission for the said proposal, we hereby submit the compliance report of conditions stipulated in the aforesaid Stage—I permission letter: Condition Compliance of Conditions by Gujarat Gas Conditions of In-Principal Permission No. Limited Condition This Permission is granted only for use of Agreed No. 1 the forest land for the purpose specified in the proposal. The legal status of the forest land shall remain unchanged. Condition The Net Present Value (NPV) for the area to The Cost of Net Present Value (NPV) of Rs. No. 2 be diverted under the proposal shall be Rs.33,030/-has been deposited as per deposited by the user agency as per the Challan generated through OSMFWC orders of the Hon'ble Supreme Court of India portal. The payment has been transferred dated 30.10.2002, 01.08.2003, 28.03.2008 to GUJARAT CAMPA account no. and 09.05.2008 in IA-566 in W.P. (Civil) No. 150687244833545 on 07/09/2020 through 202/1995 and as per the guidelines issued by the MoEFCC vide letters No. 5-1/1998-FC (pt- NEFT/RTGS vide Transaction Reference 11) dated. 18.09.2003 as well as letter No. 5- no.(UTR No.: N251201237188200). Copy 2/2006-FC dated 03.10.2006 and 5-3/2007-FC enclosed. dated 05.02.2009 in this regards. 1.•."—'7.---;',-, GUJARAT GAS LIMITED (A GSPC Group Company - Government of Gujarat Undertaking) (Formerly known as GSPC Distribution Networks Li Corporate Office : 2, Shanti Sadan Society, Near Parietal Garden, Ellisbridge, Ahmedabad - 380 006, Gujarat, India. Tel.: +91-79-26462980, 26460095 Fax : +91-79-26466249 .• Page 1 of 3 Registered Office : Gujarat Gas CNG Station, Sector 5/C, Gandhinagar - 382 006, Gujarat, India. Tel.: +91-79-232647-77, 23264999 Website : www.gujaratgas.com , www.gspcgroup.corn CIN : L40200GJ20125GC069118 9th Floor, Avdhesh House, Opp. Shri Govind Gurudwara, S. G. Highway, Ahmedabad - 380 054, Gujarat, India. Tel.: +91-79-26737400 Fax : +91 -79-26737456 Condition Compliance of Conditions by Gujarat Gas Conditions of In-Principal Permission No. Limited Condition All the funds received from the user Agreed No. 3 agency under the project shall be transferred/deposited to CAMPA fund only through e.portal. Condition User Agencies shall generate challan Generated Challan through OSMFWC No. 4 through OSMFWC portal before making portal. payment for Stage-II Clearance process. All the funds shall be deposited though OSMFWC portal by the User Agency. Condition The forest land shall not be used for any Agreed. No. 5 purpose other than that Specified in the FCA proposal. Condition User Agency will have to obtain Agreed No. 6 permission from the Nodal Officer (FCA), for carrying out any maintenance works in future. Condition User agency will have to restore the Agreed No. 7 forest land after use/ maintenance work. No tree shall be cut. Condition User agency will be liable to compensate Agreed No. 8 any loss to Forests/Environment caused due to the use of the said land by the user agency. Condition Project area is not a part of Protected Noted No. 9 Area/Sanctuary/National Park and the project area is 65.00 Km. away from the Nalsarovar Bird Sanctuary. Condition User Agency will seek permission from Agreed No. 10 the Road & Building Department/Science & Technology Dept. Sachivalaya, Gandhinagar if required so. Condition Gas Pipeline will be laid underground in Agreed No. 11 the trench of maximum depth of 2.00 meters and width of 0.5 meter, in between rows of road side plantation. Condition User Agency shall submit the details District Collector's FRA certificate enclosed No. 12 regarding compliance of MoEF's guideline herewith. dated 03.08.209 and 05.02.2013 with regard to the scheduled Tribe & Other Forest Dwellers (Recognition of forest Right) Act, 2006. FRA, 2006 shall be uploaded on e.portal (http://forestclearance.nic.in/) before Formal Approval. z..A Page 2 of 3 Condition Compliance of Conditions by Gujarat Gas Conditions of In-Principal Permission No. Limited Condition Additional Conditions as per the Agreed. Processing Fee paid and copy No. 13 Government of Gujarat's Resolution no. enclosed. FCA-1013/11-10/11/SF-24/F. Dt.12.06.2015 shall be complied with. Condition Any other condition, which the State No. 14 Government or Nodal Officer (FCA) may Agreed stipulate from time to time. Condition The compliance report shall be uploaded No. 15 on Agreed e.portal (http://forestsclearance.nic.in/) We have complied with the fulfillment of specific condition no. (2), (3), (4), (5), (12) , (13) and (15) and request you to issue order of formal approval at the earliest. Enclosures: 1. Processing Fee Payment Details 2. Stage-I permission letter 3. FRA Certificate 4. NPV Demand Note 5. E-Challan 6. NPV Payment Advice In view of foregoing, we request to issue the "Deemed Working Permission" to start execution of job. Thanking you, Yours Sincerely For Gujarat Gas Limited P Patel Deputy Manager (P Encl: As Above Copy forwarded to: 1) Add. Principal Chief Conservator of Forest, Land & Nodal Officer Gujarat State, Gandhinagar — With a request to issue "Deemed Working Permission". 2) Conservator of Forest, Social Forestry Circle, Near Panchmahal Dairy Van Chetna Dhanol, Godhra — With a request to issue "Deemed Working Permission". Page 3 of 3 Scanned by CamScanner Scanned by CamScanner Government of Gujarat Forests & Environment Department Block No. 14, 8rh Floor, New Sachivalaya, Gandhinagar, Gujarat- 382010, Tel: 079-23251071, Fax: 079-23252156. No. FCA-l 020/5-27/20/SF -153lF Dated.- 2 4 AUG ZOZI To Nodal officer (FCA) Gujarat State, Gandhinagar. Subject.- Diversion of 0.0754 ha. Protected Forest land for laying of 6" dia steel gas pipeline along/across SI-I-SAsphlat roadt Godhra-Lunawadau l lalol• Godhra-Sahmlaji Toll Road) from GGl COCO CNG to Franchisee eNG Station (Mr.Jasvantbhai Patel) in Halol Village, Halol Taluka of Panchrnhal District in favour of Dy. Manager (PR-RoU), Gujarat Gas Ltd., Ahmedabad. Ref: -(I) GOG, F&ED's letter No. JMN/IOI6iI970/1S/SF-38/F dated 15.09.2016 (2) Handbook of Forest Conservation Act, 1980 & Forest Conservation Rules, 2003 (Guidelines & Clarifications) Year 20 IY in Chapater-4( 4.2). Sir, T am directed to invite a reference to your single tile No. FCA-I020/5-27/20/SF- 153/F, dated 20.07.2020 on the above mentioned subject seeking prior approval of the Government under Section -2 of the Forest (Conservation) Act. 1980. ------- .-.~ ••••.-- ....- ...- .............- ....••....•....:•...··_········_·_····T···································.,...,..... S. Description Length xWidth i Area in No. ______{~I~!~!,t....! J!I_<l) 1 Along SH-S Asphlat Road(Godhra- IIS.OO 0.4 0.0046 Lunawada)(Halol-Godhra-Sham laji Toll Road) CH.175/00 to 290/00 2 Across SH-S Asphlat Road(Godhra- 4S.00 0.4 0.0018 Lunawadaul-lalol-Gcdhra-Shamlaji Toll Road) CH.290/00 to 33S/00 3 Along SH-S Asphlat Road(Godhra- IS6S.00 0.4 0.0626 Lunawadaul-lalol-Godhra-Shamlaji Toll Road) CH.335/00 to 1900/00 4 Along SH-S Asphlat Road( Godhra- 161.00 0.4 0.0064 Lunawada)(Halol-Godhra-Shamlaji Toll Road) CH.O/OOto 161100 Total 0.0754 The Government of India. Ministry of Environment. Forest & Climate Change has delegated the power for general approval to the State Governments of various categories like optical fiber cables, underground laying of telephone lines and underground laying of drinking water supply pipelines from time to time under section- 2 of the Forest (Conservation) Act, 1980 for diversion of forest land. , The Gol, MoEF&CC has extended the said general approval to underground laying ofCNGI PNG pipelines along the roads within existing right of way not tailing in National Parks and Wildlife Sanctuaries, without felling of trees, where the maximum size of the trench is not more than 2.00 meter depth and 1.00 meter width subject to fulfilment of conditions stipulated in the resolution of GoG Dated 15th September, 20 I6, referred No.1 & Handbook of Forest Conservation Act, 1980 & Forest Conservation Rules, 2003 (Guidelines & Clarifications) Year 2019 in Chapater- 4(4.2), referred No.2. In view of the above, the undersigned is pleased to convey the State Government's "in principle" approval for Diversion of 0.0754 ha.
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages19 Page
-
File Size-