M/S Mckinley Ventures Sy No 76/2 ,76/3 Panathur Village ,Varthurhobli ,Bangalure

M/S Mckinley Ventures Sy No 76/2 ,76/3 Panathur Village ,Varthurhobli ,Bangalure

FORM – I & I A (Only for construction projects listed under item 8 of the Schedule) CONCEPTUAL PLAN & RELATED ANNEXURES FOR THE PROPOSED RESIDENTIAL BUILDING APARTMENT BY M/s Mckinley Ventures Sy no 76/2 ,76/3 Panathur Village ,varthurHobli ,Bangalure Prepared by M/s Mckinley Ventures #796, 9th ‘A’ Main, 9th A Main Rd, Binnamangala, Stage 2, Indiranagar, Bengaluru, Karnataka 560038. Table of Contents Contents Page No. Form 1 3 Form 1A 13 1 Location Map 27 2 Surrounding Features 28 3 Drawing of site Plan 29 4 Drawing of Basement Plan 30 5 Drawing of Ground Floor Plan 31 6 Drawing of Typical Floor Plan 32 7 Drawing of Overall Terrace Plan 33 8 Drawing of Elevation and Section 34 9 Details of Septic Tank & Soak Pit 35 10 Feasibility report on water pollution control 36 system 11 Rain Fall & Run Off calculations 47 12 Storm water Pollution Prevention Plan 49 13 Landscape Details 53 14 Traffic Impact Studies & Management 54 Measures 15 Impact of Noise & Mitigation Measures 56 16 Energy Conservation aspects in Building 56 materials 17 Objectives and Strategies of Fire Fighting 60 Design 18 Environmental Management Plan 62 19 Risk Assessment, Disaster Management 67 including Offsite & Onsite Emergency Plans 20 Conceptual Plan 86 Form 1 APPENDIX I (See paragraph – 6) Sl. No. Item Details 1 Name of the project/s Proposed residential building apartment by Mr., Vinod Kumar Reddy A M/s Mckinley Ventures Managing Partner #796, 9th ‘A’ Main, 9th A Main Rd, Binnamangala, Stage 2, Indiranagar, Bengaluru, Karnataka 560038 2 S. No. in the Schedule 8 3 Proposed capacity/area/length/tonnage Proposed residential building of 260 flats to be handled/ command area/lease with total built-up area of 47600 Sqmtrs area/number of wells to be drilled consisting of: BF+SF+13UF in total site area of 13463.95 Sq. mtrs. 4 New/Expansion/Modernization New 5 Existing Capacity/Area etc. 13463.95 Sq. mtrs 6 Category of Project i.e. ‘A’ or ‘B’ Category B 7 Does it attract the general condition? No If yes, please specify. 8 Does it attract the specific condition? No If yes, please specify. 9 Location Sy no 76/2 ,76/3 Panathur Village ,varthurHobli ,Bangalure Plot/Survey/Khasra No. Sy no 76/2 ,76/3 Village Panathur Village Tehsil Bangalore East District Bangalore State Karnataka 10 Nearest major railway station/ Kempegowda bus terminus/city railway commercial airport along with distance in station –21.3 Kms, kms. Bengaluru International Airport – 51.5Kms. 11 Nearest Town, city, District Headquarters Situated in Bengaluru eastCity along with distance in kms. 12 Village Panchayats, ZillaParishad, BBMP Head office ,Bangalure Municipal Corporation, Local body Office no: 080-22238540, 080- 22975501, 080- (complete postal addresses with 22248366 telephone nos. to be given) Email id:[email protected] 13 Name of the applicant Mr.Vinod Kumar Reddy #795, 9th ‘A’ Main, 9th A Main Rd, Binnamangala, Stage 2, Indiranagar, Bengaluru, Karnataka 560038 14 Registered Address Mr., Vinod Kumar Reddy #795, 9th ‘A’ Main, 9th A Main Rd, Binnamangala, Stage 2, Indiranagar, Bengaluru, Karnataka 560038 15 Address for correspondence: Mr., Vinod Kumar Reddy #795, 9th ‘A’ Main, 9th A Main Rd, Binnamangala, Stage 2, Indiranagar, Bengaluru, Karnataka 560038 Name Mr. Vinod Kumar Reddy Designation (Owner/Partner/CEO) Managing Partner Address Mr., Vinod Kumar Reddy #795, 9th ‘A’ Main, 9th A Main Rd, Binnamangala, Stage 2, Indiranagar, Bengaluru, Karnataka 560038. Pin Code Bangalore-560002 E-mail [email protected] Telephone No. 08041264646 /9880176656 Fax No. ----------- 16 Details of Alternative Sites examined, Village – District-State if any. Location of these sites should No alternative sites were examined as the be shown on a top sheet. proposed residential building shall come up in an area marked under residential zone in the CDP of BDA. 17 Interlinked Projects No, Not Applicable (NA) 18 Whether separate application of No, NA Interlinked project has been submitted? 19 If yes, date of submission No, NA 20 If no, reason No, NA 21 Whether the proposal involves No approval/clearance under: if yes, details of the same and their status to be given. (a) The Forest (Conservation) Act, 1980? (b) The Wildlife (Protection) Act, 1972? (c) The C.R.Z Notification, 1991? 22 Whether there is any Government Order No / Policy relevant / relating to the site? 23 Forest land involved (hectares) No, NA 24 Whether there is any litigation pending No, NA against the project and/or land in which the project is propose to be set up? a)Name of the Court b)Case No. c)Orders/direction of the court, if any &its relevance with the proposed project II ACTIVITY 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) Details thereof (with approximate quantities Sr. Yes Information/Checklist confirmation /rates, wherever possible) with source of No. /No information data 1.1 Permanent or temporary change in land Yes Basedon anecdotalinformation,thesitewas use, land cover or topography including primarilyconvertedIndustrialSites,there increase in intensity of land use (with bycomingunderpreviewof Commercialuse, respect to local land use plan) whereinResidentialCategoryisallowedinthe commercialuse(CDP2015). 1.2 Clearance of existing land, vegetation and No NA buildings? 1.3 Creation of new land uses? No The area is already marked as residential in BBMP land use plan 1.5 Construction works? Yes Proposed residential building of 260 flats with total built-up area of 47600 Sqmtrs consisting of BF+SF+13UF in site area of 13463.95Sq.meters. 1.6 Demolition works? No NA 1.7 Temporary sites used for construction Yes There shall not be labour camp at site. Peak works or housing of construction number of laborers to be employed shall be 100. workers? Adequate number (8 Nos.) of toilets / bathrooms shall be provided at site as per National Building Code. First aid room and ambulance shall be provided at site. Routine weekly checkup shall be done by a qualified doctor. The capacity, design, size of septic tank & soak pit is attached as Annexure 9 along with Form IA. 1.8 Above ground buildings, structures or Yes All the structures shall be located above the earthworks including linear structures, ground. Construction activity will involve cut cut and fill or excavations and fill activity. The total earth/soil (including top soil) to be cut is about 20195 cum. Backfilling to be done between foundations is about 6548 cum. Backfilling to be done on the backside of retaining walls & underground tanks is about 6500.cum. Top soil to be used for landscape development is about 6731 cum. There is no excess earth/soil is generated. 1.9 Underground works including mining or No NA tunneling? 1.10 Reclamation works? No NA 1.11 Dredging? No NA 1.12 Offshore structures? No NA 1.13 Production and manufacturing processes? No NA 1.14 Facilities for storage of goods or No NA materials? 1.15 Facilities for treatment or disposal of solid Yes STP shall be provided for treatment of Sewage waste or liquid effluents? during operation phase. Proper disposal of garbage is also planned. STP shall be designed for175 m3/day& quantity of sewage shall be 160 m3/day. The proposed project envisages the utility of treated sewage for recycling purposes by way of using it for flushing of toilets, gardening, floor and road washing Recycle. i. Toilet Flushing: 59 m3/day ii. Gardening: 27 m3/day iii. Excess water to BWSSB Drain Domestic garbage generated from the proposed project is envisaged to be disposed through Trash bins, Trash cover collection system & then through the municipal/local Garbage collection Trucks for further disposal. Domestic household garbage would be segregated into Organic and Inorganic wastes and then kept ready for disposal. Organic waste shall be converted into soil conditioner using organic waste converter. The quantity of the total garbage (780 Kg/day) produced from the proposed project is worked out as per the guidelines of IS 6924-1973. Around 24 Kg/day of STP sludge shall be generated & the same shall be used as manure within the premises. 1.16 Facilities for long term housing of No NA operational workers? 1.17 New road, rail or sea traffic during Yes Slight increase in traffic during operational construction or operation? phase is expected 1.18 New road, rail, air waterborne or other No NA transport infrastructure including new or altered routes and stations, ports, airports etc? 1.19 Closure or diversion of existing transport No NA routes or infrastructure leading to changes in traffic movements? 1.20 New or diverted transmission lines or No NA pipelines? 1.21 Impoundment, damming, culverting, No NA realignment or other changes to the hydrology of watercourses or aquifers? 1.22 Stream crossings? No NA 1.23 Abstraction or transfers of water from No Source of water shall be from BWSSB during ground or surface waters? operation phase. 1.24 Changes in water bodies or the land Yes Runoff is taken care of with Rain Water surface affecting drainage or run-off? Harvesting and Storm Water management plan. Details of rain water harvesting and storm water management plan are attached as Annexure 11 & 12 along with Form 1A. 1.25 Transport of personnel or materials for Yes During construction phase only. construction, operation or decommissioning? 1.26 Long-term dismantling or No NA decommissioning or restoration works? 1.27 Ongoing activity during No NA decommissioning which could have an impact on the environment? 1.28 Influx of people to an area in either Yes Temporarily during construction & temporarily or permanently? permanently during operational phases 1.29 Introduction of alien species? No NA 1.30 Loss of native species or genetic diversity? No NA 1.31 Any other actions? No NA 2.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    17 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us