Diesel and Gas-Engine Power Plants in India Arkay Location: Tamil Nadu Operator: Ind-Barath Energies Ltd Bairabi Location: Mizoram Configuration: 10 X 8.7 MW 20V34SG engines, 1 X Butibori-2 Operator: Mizoram Power & Electricity Dept 8.1 MW steam set Location: Maharashtra Configuration: 4 X 5.75 MW 16V32LN engines Fuel: natural gas Operator: Indo Rama Synthetics Ltd Fuel: heavy oil Operation: 2006 Configuration: 3 X 13.5 MW 16V46 engines Operation: 2004 HRSG supplier: ?? Fuel: heavy oil E/G supplier: Wartsila, BHEL E/G and T/G supplier: Wartsila, Hangzhou Operation: 1996 EPC: BHEL Quick facts: In Mar 2006, Arkay Energy E/G supplier: Wartsila (Rameswarm) Ltd, a unit of Ind-Barath Power, Quick facts: This is the largest power plant in completed this power station at Valantharavai, Mizoram. Ramnad District. The plant uses gas from isolated GAIL wells in Ramanathapuram and at the completion was the largest plant of its kind in India. Haebowal Complex Location: Punjab Operator: Punjab Energy Development Agency Kasargod Location: Kerala Dalmia Cement Configuration: 1 X 1 MW JMC320GS-BL engine Operator: KSK Energy Ventures Ltd Location: Tamil Nadu Fuel: biogas Configuration: 3 X 7 MW CM32 engines Operator: Dalmia Cement Operation: 2004 Fuel: heavy oil Configuration: 2 X 2 MW 6R32, 1 X 4 MW 12V32 E/G supplier: Jenbacher Operation: 2001 engines EPC: Clarke Energy India E/G supplier: MAK Fuel: heavy oil Quick facts: This biogas cogeneration system is at Quick facts: This is the first IPP in Kerala. The Rs Operation: 1983-1987 the 50ac Haebowal dairy complex, one of two 70.70 crore plant has a 15yr PPA with Kerala State E/G supplier: Wartsila centralized facilities in Ludhiana that in total serve 1,490 dairy operations with 150,000 head of cattle. Electricity Board (KSEB). Low sulfur HFO is Of a total of 2,500 tpd of manure produced per day , supplied by Bharat Petroleum Corp Ltd (BPCL). the biogas demonstration project processes 235t to generate electricity and hot water. Entec Biogas GmbH supplied the biogas system. Nagarpattinam Leimakhong Modipon Location: Tamil Nadu Location: Manipur Location: Uttar Pradesh Operator: MMS Steel & Power Operator: Manipur Electricity Department Operator: Modipon Fibres Co Ltd Configuration: 2 X 6 MW Configuration: 6 X 6 MW engines Configuration: 1 X 11.5 MW 16V32 engine Fuel: natural gas Fuel: heavy oil Fuel: heavy oil Operation: 2003 Operation: 2002 Operation: 1986 E/G supplier: ?? E/G supplier: Wartsila, BHEL E/G supplier: Wartsila Quick facts: This captive power plant was later EPC: BHEL, Simplex Projects Quick facts: This captive power plant has well over extended to 28 MW and cost a total of Rs 65 crore. Quick facts: The work scope for this project 100,000 running hours having been operated at Fuel is supplied by GAIL and Oil and Natural Gas included a 33/11kV switchyard. baseload for many years. Corp. Power offtakers include Gujarat Heavy Chemicals and Brakes India Ltd. Vasavi Location: Tamil Nadu Operator: GMR Group Configuration: 4 X 50 MW 12K90MC-S engines Fuel: heavy oil Operation: 1998-1999 RVK Konkepudi E/G supplier: MAN B&W, Hyundai, ABB Location: Andhra Pradesh EPC: Hyundai E&C Operator: KSK Energy Ventures Ltd Quick facts: This is the largest power station of its Configuration: 8 X 3 MW G3616 engines kind in the world. Engine output is 70,000HP and Fuel: heavy oil each machine is is as high as a 5-story building. Operation: 2000-2001 The plant cost $235mn and went commercial on 4 E/G supplier: Cat Mar 1999, somewhat ahead of schedule. At the Quick facts: This is the first successful engine- time, CMS Energy held a 49% ownership stake, but based plant of its type in the state. Fuel is supplied the company announed in Nov 2001 that it was from local stranded gas assets and from GAIL. divesting the stake. Low sulfur fuel oil is provided Customers include India Cements and Zuari under a 15yr contract with Hindustan Petroleum Cements. Corp Ltd. Vasavi is connected to the local 110kV grid and operated by Hyundai O&M staff. A Metso Automation MAX 1000 + PLUS system is used to control and monitor the engines and BOP equipment and the plant has an innovative system that uses wastewater for engine cooling..
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages2 Page
-
File Size-