MARBURG DETENTION BASIN at MARBURG – QUARRY ROAD, MARBURG

MARBURG DETENTION BASIN at MARBURG – QUARRY ROAD, MARBURG

EMERGENCY ACTION PLAN MARBURG DETENTION BASIN at MARBURG – QUARRY ROAD, MARBURG September, 2021 This Emergency Action Plan has been prepared to comply with the conditions notified under the Water Supply (Safety and Reliability) Act 2008, Chapter 4. Marburg Detention Basin Emergency Action Plan Emergency Activation Quick Reference The Emergency Action Plan (EAP) for Marburg Detention Basin covers four emergency conditions evaluated within this document. Use the following table to select the relevant section of the EAP that deals with the emergency condition. Note that the Dam Operator is responsible for the decision to activate the EAP. Activation Level Alert Lean Forward Stand-Up Stand-Down Decision Authority Dam Operator Dam Operator Dam Operator & Local Dam Operator Disaster Co-Coordinator Activation trigger for emergency conditions relating to dam hazards Flood Event with No Structural Water level = 81.50 EAP activated at water level Water level = 86.70 mAHD Water level = 83.00 mAHD Issues (Flow Chart A) mAHD (Automatic Flood = 83.00 mAHD (Automatic (Automatic Flood Gauge (Automatic Flood Gauge Gauge Level = 2.10 m) Flood Gauge Level = 3.6 m) Level = 7.3 m) Level = 3.6 m) and falling and rising with no more rain Flood Event with Structural Water level = 81.50 EAP activated at water level Water level = 86.70 mAHD Water level = 83.00 mAHD Issues (Flow Chart B) mAHD (Automatic Flood = 83.00 mAHD (Automatic (Automatic Flood Gauge (Automatic Flood Gauge Gauge Level = 2.10 m) Flood Gauge Level = 3.6 m) Level = 7.3 m) Level = 3.6 m) and falling and rising with no more rain Earthquake Event (Flow Chart C) Earthquake occurs of Rainfall Event Imminent - No safety issue magnitude 4 or greater identified/remaining Terror Event (Flow Chart D) Terror event occurs Rainfall Event Imminent - No safety issue identified/remaining Page 2 of 47 Marburg Detention Basin Emergency Action Plan Distribution Control Page Controlled Copy: Marburg Detention Basin - EAP - 2020 - Copy#l Refer Note below) Authorisation: Signature: Date:10/09/2021 21/09/21 Approved by: A / General Manager, Infrastructure and Environment Department Copy# Position* Location 1 Dam Operator Ipswich City Council 2 Dam Managers Ipswich City Council 3 Local Disaster Coordinator/Local Emergency Management Unit, Ipswich City Disaster Management Group Council, Ipswich 4 Chief Executive/Director Dam Safety Department of Regional Development, Manufacturing and Water (RDMW) 5 SES Local Controller Ipswich City SES unit 6 Executive Officer Queensland Police Service Yamanto Ipswich District Disaster Management Group Revisions: Revision Description Revision Revised By No. 1 Update of 2014 EAP October 2016 (WSP PB) 2 Updated with DEWS comments January 2017 ICC 3 Updated with comments from February 2018 stakeholders (SMEC) 4 Annual Review September 2018 ICC 5 Annual Review September 2019 ICC 6 Annual Review October 2020 ICC 7 Annual Review September 2021 ICC Note: A complete set of documents in hard copy form shall be held in Infrastructure and Environment Department, Asset Management Section at 1 Nicholas street Level 7. The electronic copies are saved in Objective and on the USB Drive attached to Controlled Copy No.1). * Refer to the notification listing for contact details. Page 3 of 47 Marburg Detention Basin Emergency Action Plan TABLE OF CONTENTS 1 Introduction .................................................................................................................................... 6 1.1 Risks and Issues ....................................................................................................................... 7 1.2 Technical Data ......................................................................................................................... 9 1.3 Monitoring System .................................................................................................................. 9 1.4 Maintenance and Inspections ................................................................................................. 9 1.5 Glossary ................................................................................................................................. 11 2 Notification Listing Flow Chart ...................................................................................................... 12 2.1 Notification Flow Chart ......................................................................................................... 12 2.2 Emergency Response Notification and Contact List ............................................................. 15 2.3 Impacted Persons / Property ................................................................................................ 16 2.4 Road Inundation and Road Closure....................................................................................... 17 2.5 Evacuation Routes / Evacuation Centre ................................................................................ 18 3 Roles and Responsibilities ............................................................................................................. 20 4 Emergency Events and Action List ................................................................................................ 22 4.1 Potential Emergency Events and Responses ........................................................................ 23 4.2 Possible Scenarios Leading to Activation of the EAP ............................................................ 24 LIST OF FIGURES Figure 2.1 – Marburg EAP Notification Flow Chart ............................................................................... 14 Figure 4.1 – Flow Chart A – Flood Inflow, No Embankment Issues ...................................................... 26 Figure 4.2 – Flow Chart B – Flood Inflow, Embankment Issue Identified ............................................. 32 Figure 4.3 – Flow Chart C – Earthquake Event ...................................................................................... 40 Figure 4.4 – Flow Chart D – Terror Event .............................................................................................. 44 Page 4 of 47 Marburg Detention Basin Emergency Action Plan LIST OF TABLES Table 1.1 – Peak Storage Levels for a Rage of Flood Events ................................................................... 7 Table 1.2 – Marburg Detention Basin Technical Data............................................................................. 9 Table 1.3 – Marburg Detention Basin Maintenance & Inspection Schedule ........................................ 10 Table 1.4 – Glossary .............................................................................................................................. 11 Table 2.1 – Alert Level Definitions ........................................................................................................ 12 Table 2.2 – Notification Contact List ..................................................................................................... 12 Table 2.3 – Flood Level Designation...................................................................................................... 12 Table 2.4 – Road Closures for Different Flood Levels ........................................................................... 18 Table 3.1 – Roles and Responsibilities .................................................................................................. 20 Table 4.1 – Possible Dam Safety Issues ................................................................................................. 23 Table 4.2 – Flow Chart A – Recommended Actions .............................................................................. 27 Table 4.3 – Flow Chart B – Recommended Actions .............................................................................. 33 Table 4.4 – Modified Mercalli Scale ...................................................................................................... 39 Table 4.5 – Flow Chart C – Recommended Actions .............................................................................. 41 Table 4.6 – Flow Chart D – Recommended Actions .............................................................................. 44 LIST OF APPENDICES Appendix A Mapping Appendix B Supporting Information Page 5 of 47 Marburg Detention Basin Emergency Action Plan 1 Introduction This Emergency Action Plan (EAP) is part of a suite of dam safety and management documents provided by Ipswich City Council (ICC). When using this plan, reference is also to be made to the current version of Ipswich City Council Local Disaster Management Plan (LDMP). ICC is the owner of Marburg Flood Detention Basin and any emergency response in relation to the basin is to be managed and directed as per this EAP. The Marburg Detention Basin is a flood detention structure located on Black Snake Creek immediately upstream of the township of Marburg. The detention basin was constructed to reduce the impact of flooding downstream of its location, by detaining flood flows from Black Snake Creek and releasing them at a reduced rate, lowering the probability of inundation of properties and infrastructure downstream. In the case where there is no storm event occurring within the catchment the basin is effectively dry and as such Sunny Day Failure is not considered within this document. The basin was constructed in 2003 as an earth embankment, with a height of approximately 10 metres and an embankment length of 700 metres. A centrally located spillway provides the ability to discharge

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    76 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us