M/S. ALYSJ JOINT VENTURE DOHA METRO GOLD LINE PROJECT

M/S. ALYSJ JOINT VENTURE DOHA METRO GOLD LINE PROJECT

Josef Gruseck M/s. ALYSJ JOINT VENTURE Member of the Executive Board DOHA METRO GOLD LINE PROJECT Traffic Tunnelling DOHA, QATAR Phone: +49 (78 24) 302 2390 Mobile: +49 (171) 85 07 553 Fax: +49 (78 24) 302 2550 e-mail: [email protected] www.herrenknecht.com [Ihr Zeichen] [Unser Zeichen] 77963 Schwanau, J. Grsueck / aks 2017-03-27 To whomsoever it may concern Dear Sir/Madam, This is to share that we are happy with JSL Global WLL, P O Box 55502, Doha- Qatar’s Service for last 03 TBMs (Tunnel Boring Machines) imports for Doha Sewage project, which entered in Doha on temporary importation for IDRIS project MTS01-03 in 2016. We also found JSL Global WLL’s local transport/local import-export custom clearance services satisfactory for our last Red Line South TBM re export from Hamad Port for our recent export in 1st quarter 2017. Project Details we worked with JSL during 2016 & 2017:- 01 TBM MTS3 – IDRIS (The Inner Doha Re-sewerage Implementation Strategy ) – Import from Germany to Qatar (Approx. volume @2800 CBM) (Client- HOCHTIEF Qatar) 02 Micro TBMS MTS1 – Import from Germany to Qatar (Approx. @2200 CBM) (Client – BOUYGUES Qatar) 05 TBMs Red Line South – Export from Hamad Port, Qatar to Germany (Approx. volume @15,000 CBM) (Client – QDVC QSC) 01 TBM MTS3- IDRIS – Export from Qatar to Germany (Approx. volume @2800 CBM) (Client- HOCHTIEF Qatar) To add in this, JSL Global Doha office managed Qatar customs clearance some technical matters & amendment of previous Import Bill of entry etc. very professional manner in our last projects. In our all projects to/from Qatar, they have managed to clear shipment without any Port storage or shipping line detention. JSL Doha team work professionally and have proved that proper SOP (Standard Operator procedure) & proper planning/coordination can avoid port storage/customs penalty/Trailer waiting charges etc. issue. We recommend JSL Global Doha service for any ongoing infrastructure projects in Qatar & any local transport/custom brokerage/Temporary import export permit & renewal etc. job. We are wishing them all very best for 2017 & onwards. Best regards Herrenknecht AG ppa. J. Gruseck Member of the Executive Board Traffic Tunnelling Datum Name / Kürzel 2 / 3 HERRENKNECHT AG Schlehenweg 2 • 77963 Schwanau • Germany Datum Name / Kürzel 3 / 3 HERRENKNECHT AG Schlehenweg 2 • 77963 Schwanau • Germany .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    3 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us