Final Study Report

Final Study Report

ENVIRONMENT AND SOCIAL IMPACT ASSESSMENT STUDY REPORT CONTENTS Chapter Description Page EXECUTIVE SUMMARY xiv 1 INTRODUCTION 1-1 1.1 Project Background and rationale 1-1 1.2 Project Location 1-2 1.3 Objectives of the ESIA study 1-5 1.4 Methodology 1-6 1.4.1 Screening Visit 1-6 1.4.2 Project Report and Scoping 1-6 1.4.3 Desk Study 1-6 1.4.4 ESIA Study 1-7 1.4.5 Ecological Surveys 1-7 (a) Qualitative method- Desk stop study and indigenous knowledge on aquatic fauna of the study area 1-7 (b) Quantitative methods 1-7 (i) Field sampling design 1-7 (ii) Aquatic fauna sampling techniques 1-8 (iii) Fish sampling techniques 1-8 (iv) Macro-invertebrates sampling methods 1-9 (v) Water quality parameters 1-10 (vi) Others- Small mammals, amphibians and reptiles 1-10 (vii) Fish and invertebrates identification 1-10 (c) Other fauna 1-11 (d) Plants 1-11 1.4.6 Impacts on biodiversity 1-11 1.4.7 Hydrology 1-11 1.4.8 Mapping of Baseline Environment 1-12 1.4.9 Socioeconomic Survey 1-14 1.4.10 Public Consultations 1-14 (a) Project Report Stage 1-14 (b) ESIA Study Stage 1-14 (i) Public meetings 1-15 (ii) Key Informant Interviews 1-15 (c) Incorporating public views into the ESIA report 1-15 (d) Public disclosure 1-15 1.5 Study Limitations 1-16 1.6 ESIA Study Team 1-16 1.7 Structure of the Report 1-16 2 POLICY, LEGAL AND REGULATORY FRAMEWORK 2-1 2.1 Background 2-1 ESIA STUDY REPORT NCT PHASE 1 ii Issue 1.0 / October 2014 2.2 Policy Framework 2-1 2.2.1 Environmental Policy 2-1 2.2.2 Kenya’s Vision 2030 2-1 2.2.3 Land Policy 2-2 2.2.4 National Water Policy 2-2 2.2.5 Millennium Development Goals (MDGs) 2-3 2.3 Legal Framework 2-3 2.3.1 Constitution of Kenya 2-3 2.3.2 The Environment Management and Coordination Act, 1999 2-4 (a) Environmental Impact Assessment and Audit Regulations 2003 2-4 (b) The Environmental Management and Co-ordination Act (Water Quality) Regulations, 2006) 2-5 (c) The Environmental Management and Co-ordination (Waste Management) Regulations, 2006 2-6 (d) The Environmental Management and Coordination Act (Noise and Excessive Vibration Pollution) (Control) Regulations, 2009 2-6 (e) The Environmental Management and Coordination (Wetlands, River Banks, Lake Shores and Sea Shore Management) Regulations, 2009 2-7 (f) The Environmental Management and Coordination (Conservation of Biological Diversity and Resources, Access to Genetic Resources and Benefit Sharing) Regulations, 2006 2-7 (g) Environmental Management and Coordination (Fossil Fuel Emission Control) Regulations 2006 2-7 2.3.3 The Water Act, 2002 2-8 (a) The Water Resources Management Rules, 2007 2-8 2.3.4 The Public Health Act (Cap. 242) 2-9 (a) The Public Health (Drainage and Latrine) Rules 2-9 2.3.5 Malaria Prevention Act Cap 246 2-9 2.3.6 Occupational Safety and Health Act, 2007 2-10 2.3.7 Work Injury Benefits Act (WIBA), 2007 2-10 2.3.8 The Wildlife Conservation and Management Act, 2013 2-10 2.3.9 The Kenya Roads Board Act, Cap 408 of 1999 2-11 2.3.10 Public Roads and Road of Access Act (Cap 399) 2-11 2.3.11 The Kenya Roads Act of 2007 2-11 2.3.12 Acts Related to Land 2-12 2.3.13 The Physical Planning Act, 1996 2-16 2.3.14 Mining Act, Cap 306 2-17 2.3.15 Explosives Act, Cap 115 2-18 2.3.16 The Penal Code (Cap. 63) 2-18 2.4 World Bank Safeguard policies 2-19 2.4.1 World Bank policy OP 4.01 Environmental Assessment 2-19 2.4.2 World Bank policy OP 4.04 Natural Habitats 2-19 2.4.3 World Bank policy OP 4.11 Physical Cultural Resources 2-19 2.4.4 World Bank Operational Policy 4:12 Involuntary Resettlement 2-20 2.4.5 World Bank Operational Policy 4:37 Safety of Dams 2-20 2.5 AFD Policy on Environmental and Social Risk Management 2-21 2.5.1 Policy 2-21 2.5.2 Environmental and Social Risks 2-21 2.5.3 Reference Standards 2-21 2.6 Institutional Framework 2-22 2.6.1 Ministry of Environment, Water and Natural Resources 2-22 2.6.2 Athi Water Services Board 2-22 2.6.3 Nairobi City Water and Sewerage Company (NCWSC) 2-23 2.6.4 The National Environment Management Authority (NEMA) 2-23 (a) Standards and Enforcement Review Committee (SERC) 2-23 (b) Public Complaints Committee 2-23 ESIA STUDY REPORT NCT PHASE 1 iii Issue 1.0 / October 2014 (c) County Environmental Offices 2-23 2.6.5 Water Resource Management Authority (WRMA) 2-23 2.6.6 Water Services Regulatory Board 2-24 2.6.7 Ministry of Agriculture, Livestock and Fisheries 2-24 2.6.8 Kenya Forest Service 2-24 2.6.9 Kenya Wildlife Service 2-24 2.6.10 Directorate of Occupational Safety and Health 2-24 2.6.11 County Government of Murang’a 2-25 2.7 International Conventions 2-25 2.7.1 Convention on Biological Diversity 2-25 2.7.2 The Ramsar Convention 2-25 2.7.3 African Convention on the Conservation of Nature and Natural Resources 2-26 2.7.4 Kyoto Protocol to the United Nations Framework Convention on Climate Change 2-26 2.7.5 The 1992 United Nations Framework Convention on Climate Change (UNFCCC); 2-26 2.7.6 Vienna Convention for the Protection of the Ozone Layer 2-26 3 BASELINE ENVIRONMENTAL SETTING 3-1 3.1 Physical environment 3-1 3.1.1 Climate 3-1 (a) Rainfall 3-1 (b) Temperature and humidity 3-2 (c) Sunshine hours 3-2 (d) Evaporation 3-2 (e) Winds 3-2 3.1.2 Topography and Drainage 3-2 3.1.3 Geology 3-3 3.1.4 Landslide hazards 3-7 3.1.5 Soils 3-7 3.1.6 Hydrology and drainage 3-7 3.1.7 Water Resources and key uses 3-11 (a) Surface water resources 3-11 (b) Underground water resources 3-12 3.1.8 Air Quality 3-12 3.1.9 Noise 3-12 3.2 Biological Environment 3-15 3.2.1 Fauna 3-15 (a) Aquatic fauna of conservation significance 3-18 (b) Birds 3-19 (c) Other fauna 3-19 (i) Native species: 3-19 (ii) Introduced species: 3-19 3.2.2 Flora 3-19 (a) Floristic composition 3-19 Figure 3-10 Life form spectrum of species 3-21 (b) Floral Species diversity 3-21 (c) Botanical uniqueness 3-21 (d) Algae 3-22 (e) Threats to Plants and Existing Ecologically Sensitive Areas 3-23 3.3 Social Characteristics 3-24 3.3.1 Population size and composition 3-24 3.3.2 Household Headship 3-25 3.3.3 Religion 3-25 3.3.4 Education 3-25 ESIA STUDY REPORT NCT PHASE 1 iv Issue 1.0 / October 2014 (a) Population currently in school 3-25 (b) Education level for HH heads and spouses 3-26 3.3.5 Housing conditions 3-26 3.3.6 Access to water 3-27 3.3.7 Water treatment and sanitation 3-28 3.3.8 Health conditions 3-28 3.3.9 Medical facilities 3-29 3.3.10 Gender issues 3-30 3.3.11 Community problems 3-31 3.4 Economic Characteristics 3-31 3.4.1 Employment status of persons living in the project area 3-31 3.4.2 Income sources 3-31 3.4.3 Land tenure and ownership 3-32 3.4.4 Land use potential and agricultural activities 3-32 3.4.5 Energy sources 3-33 3.4.6 Roads access 3-34 4 PROJECT DESCRIPTION 4-1 4.1 Introduction 4-1 4.1.1 River Diversion Weir and Intake Structures 4-1 (a) River Diversion Weirs 4-2 (b) Intake 4-3 (c) Desilting Basin 4-3 (d) Tunnel Inlet Well Drop Structure 4-4 (e) Irati Drop Shaft 4-4 (f) Compensation Channels for In-stream Flow Requirements (IFR) 4-4 (i) Design features 4-4 (ii) Operating principle 4-5 4.1.2 Northern Collector Tunnel 4-5 4.1.3 Tunnel Outfall Structure 4-7 4.1.4 Kaanja and Gikigie Adits 4-8 4.1.5 Tunnel portals 4-8 4.2 Fish Passes 4-9 4.3 Tunnel Excavation Methods 4-11 4.3.1 Conventional Tunnelling Construction 4-11 4.3.2 Excavation by Tunnelling Boring Machine (TBM) 4-11 4.4 Material Sources and Spoil Sites 4-12 4.4.1 Material Sources 4-12 4.4.2 Spoil sites 4-12 4.5 Project Inspection and Maintenance 4-13 4.6 Safety in Design 4-14 4.7 Temporary and enabling works 4-14 4.8 Construction Inputs and activities 4-15 4.8.1 Construction materials 4-15 4.8.2 Construction equipment 4-15 4.8.3 Labour 4-15 4.8.4 Construction activities (summary) 4-15 (a) For the intakes and outfall 4-16 (b) For the tunnels and adits 4-16 4.9 Project Cost and Duration 4-16 ESIA STUDY REPORT NCT PHASE 1 v Issue 1.0 / October 2014 4.10 Community Support Projects 4-16 4.10.1 Community water projects 4-16 4.10.2 Corporate Social Responsibility 4-17 5 PROJECT ALTERNATIVES 5-1 5.1 No Project Alternative 5-1 5.2 Construction of Maragua Dam 5-1 5.3 Tunnel Construction Options 5-2 5.3.1 Conventional Tunneling construction 5-2 5.3.2 Excavation by Tunnel Boring Machine (TBM) 5-2 6 PUBLIC CONSULTATIONS AND DISCLOSURE 6-1 6.1 General 6-1 6.1.1 Objectives of the Public consultation 6-1 6.2 Previous Consultations 6-2 6.2.1 Stakeholder Consultations at Scoping Stage 6-2 6.2.2 Summary of issues rose 6-2 6.3 Stakeholder Consultations during ESIA and RAP 6-5 6.3.1 Consultations during the ESIA and RAP Study 6-5 6.3.2 Stakeholder identification 6-6 6.3.3 Approach and implementation of public consultations 6-6 6.4 Summary of Stakeholders Comments 6-8 6.5 Consultations with Project Beneficiaries 6-16 6.6 Focus Group Discussions Meetings 6-22 6.6.1 Employment Opportunities 6-22 6.6.2 Alcoholism among the youth 6-22 6.6.3 Road networks in the project area 6-22 6.6.4 Land Ownership in the area 6-22 6.6.5 Social impacts of compensation 6-23 6.6.6 Youth Groups in the project area 6-24 6.6.7 Intrusion of new people in the area 6-24 6.6.8 Lack of Health Facilities 6-25 6.6.9 Education institutions in the project area 6-25 6.6.10 Communication network in the area 6-25 6.6.11 Community roles 6-25 6.6.12 Community perception of economic ability 6-25 6.6.13 Grave sites 6-26 6.6.14 Cultural sites in the area 6-26 6.7 Public Meeting Consultations 6-27 6.7.1 Objective of Public Consultation Meetings 6-27 6.7.2 Comments from the Consultations 6-27 (a) Abstracting water used by community 6-28 (b) Social impacts of alien persons in the area 6-28 (c) Grievance mechanisms during and after Compensation 6-28 (d) Waste

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    394 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us