Largest Indianapolis-Area Ongoing Construction Projects(1) (Ranked by Estimated Cost (2))

Largest Indianapolis-Area Ongoing Construction Projects(1) (Ranked by Estimated Cost (2))

Largest Indianapolis-Area Ongoing Construction Projects(1) (Ranked by estimated cost (2)) GENERAL ESTIMATED START CONTRACTOR(S)/ PROJECT COST DESCRIPTION/ COMPLETION CONSTRUCTION RANK LOCATION SQUARE FEET MAJOR TENANT TARGET OWNER(S) ARCHITECT(S) ENGINEER(S) MANAGER(S) I-69 section 6 $79.0 million conversion of 27 miles of State March 2019 INDOT NA HNTB Corp., Milestone, Crawford DND Morgan, Johnson and Marion counties NA Road 37 to Interstate 69 from 2024 Murphy & Tilly Inc., Lochmueller 1 Martinsville to Indianapolis, Group Inc., WSP associated improvements to I-465 Criminal Justice Center $571.0 million 50-acre community justice campus June 2018 city of Indianapolis HOK, K2M Design, DLZ, American Structurepoint, Shiel Sexton Co. Inc., Prospect Street and Keystone Avenue 1.3 million including 3,000-bed jail, five-level Dec. 2021 Elevatus Architecture, Lynch Harrison & Brumleve, AECOM Hunt, F.A. 2 courthouse for civil and criminal Schmidt Associates, Schmidt Associates, Wilhelm Construction courts, three-level sheriff's office, CBRE | Heery CMID Engineering Co. Inc. Assessment and Intervention Center Bottleworks District $300.0 million West Elm Hotel, offices, retail, Oct. 2017 Hendricks Eppstein Uhen Civil & Environmental The Hagerman Group College and Massachusetts avenues 1.4 million housing, restaurants, entertainment July 2020 Commercial Architects, Ratio Consultants Inc., ARSEE 3 Properties Engineers, Fink Roberts & Petrie, Circle Design Group White River and Lower Pogue's Run $199.5 million 250-foot-deep, 7.6-mile-long rock June 2016 Citizens Energy NA Black & Veatch, AECOM Shea-Kiewit joint 4 Deep Tunnel Project DND tunnel to capture and store June 2021 Group venture Indianapolis combined sewer overflow Community Hospital East campus $175.0 million consolidation and renovation of June 2015 Community Health TEG Architects, BSA LifeStructures, Pepper Construction 5 redevelopment 537,000 existing hospital campus, June 2020 Network RTKL Associates JPS Consulting Engineers Company of Indiana 1500 N. Ritter Ave. construction of 155-bed tower and emergency department Midtown $150.0 million Allied Solutions, F.C. Tucker, July 2016 Ambrose Property Ratio, Studio M, CSO Civil & Environmental Consultants F.A. Wilhelm North Rangeline Road and Elm Street, 500,000 MJ Insurance, Sun King Spirits, July 2021 Group, Old Town Architects Inc., Weaver Inc., CrossRoad Engineers PC Construction Co. Inc., 6 Carmel Midtown Flats by J.C. Hart Development, Sherman, Axis Garmong , J.C. Hart J.C. Hart, Sun King The Yard at Fishers District $150.0 million culinary-focused retail development May 2018 Thompson Thrift Butler Design Group, Kimley Horn Thompson Thrift 116th Street and IKEA Way, Fishers 180,000 including culinary incubator, hotel Jan. 2020 Retail Group Woolpert, Studio M Construction 6 and mixed-use development Rolls-Royce plant renovations $140.0 million campus modernization and Sept. 2015 Rolls-Royce BRPH BRPH Pepper Construction 2001 S. Tibbs Ave. 1.0 million consolidation plan including facility, May 2019 Company of Indiana 8 equipment and infrastructure improvements 16 Tech Phase I $130.0 million 60-acre tech-focused district with Dec. 2018 16 Tech Ayers Saint Gross, American Structurepoint Inc., BSA Browning, 16 Tech Waterway Boulevard west of downtown 390,000 offices, laboratories, housing and May 2020 Community Corp. BSA LifeStructures, LifeStructures, JPS Consulting Community Corp. 9 retail space Schott Design Engineers LLC, Shrewsberry & Associates Indiana NeuroDiagnostic Institute $120.0 million hospital and treatment center for Jan. 2017 state of Indiana BSA Lifestructures BSA Lifestructures Pepper Construction 5435 E. 16th St. 239,000 acute and chronic mental health April 2019 Company of Indiana 10 and neurological disorders CityWay II $110.0 million apartment buildings, retail and Aug. 2016 Buckingham Cos. OZ Architecture V3 Cos., McComas Engineering, Buckingham Cos., F.A. Virginia and Louisiana streets 530,979 office space, parking structure Nov. 2019 Lynch Harrison & Brumleve Wilhelm Construction 11 Co. Inc. IndyGo Red Line BRT Phase 1 $96.3 million 13.1-mile bus rapid transit line May 2018 IndyGo CDM Smith Inc. CDM Smith Inc., American HNTB Inc., Rieth-Riley 66th Street and College Avenue DND including 27 new stations with 20 Oct. 2019 Structurepoint, VS, Etica Group Construction Co. Inc., 12 to Shelby Street and Hanna Avenue center boarding platforms and seven F.A. Wilhelm curbside stations Construction Co. Indiana University Health Riley $89.5 million renovation of four floors to house March 2018 Indiana University BSA LifeStructures BSA LifeStructures Messer Construction 13 Hospital for Children Maternity and 197,500 labor and delivery unit, new 45-bed Jan. 2020 Health Co. Newborn Health Level 3 neonatal intensive care unit 705 Riley Hospital Drive and postpartum unit Indiana University Health West $83.0 million addition of 46 inpatient beds, Oct. 2018 Indiana University BSA LifeStructures BSA LifeStructures Turner Construction 14 Hospital expansion 116,358 operating room, support services Sept. 2020 Health Co., Harmon 1111 Ronald Reagan Parkway, Avon space Construction Hyatt House/Hyatt Place Hotel $81.4 million 15-story, 316-room downtown hotel Sept. 2017 Indy Penn Center Ratio Fink Roberts & Petrie, Civil & F.A. Wilhelm Pennsylvania and Georgia streets 208,000 with pedestrian connector to March 2019 Hotel Owner LLC Environmental Consultants Inc. Construction Co. Inc. 15 eight-level parking structure c/o HRI Properties LLC Brownsburg High School addition $81.0 million new classrooms, science labs, Nov. 2016 Brownsburg CSO Architects Inc. Context Engineering Co., Lynch Meyer Najem 1000 S. Odell St., Brownsburg 641,037 central mechanical room; renovation July 2020 Community School Harrison & Brumleve, Construction 16 of classrooms, corridors, auditorium Corp. R.E. Dimond & Associates 220 N. Meridian Tower $80.4 million mixed-use redevelopment with 160 Jan. 2019 Keystone Group CSO Architects Inc. DND Keystone Group 220 N. Meridian St. 555,453 apartments, parking garage, offices Jan. 2021 17 and first-floor retail at former AT&T Building KAR Auction Services headquarters $80.0 million corporate headquarters March 2018 Karmel Property Ratio Civil & Environmental Consultants Shiel Sexton Co. Inc. North Illinois and West 111th streets, 250,000 June 2019 LLC Inc., Walker Parking, RTM, 18 Carmel Snelling Engineering I-69 Madison County $79.0 million add eight miles of additional travel July 2018 INDOT NA DND Walsh Construction Madison and Delaware counties NA lanes, six miles of pavement and July 2020 Co., Rieth-Riley 19 bridge maintenance Construction Co. Inc. Westfield Washington Schools $79.0 million additions and renovations to middle April 2018 Westfield DND DND The Skillman Corp. 345 W. Hoover St., 326 W. Main St., 426,000 school, intermediate school and Dec. 2020 Washington 19 18250 N. Union St., Westfield high school Schools The Proscenium $70.0 million mixed-use development with Nov. 2017 Anderson Birkla Woolpert Woolpert The Hagerman Group Carmel Drive and Rangeline Road, Carmel 500,000 residential, retail and office space, April 2020 21 fitness club, underground parking The Whit $65.0 million 334 luxury apartments above Oct. 2016 TWG Development Browning Day Mullins SCA Consulting Engineers, TWG Construction LLC 307 N. Pennsylvania St. 462,644 first-floor retail March 2019 LLC Dierdorf Enverity Engineering, 22 VS Engineering Washington Township middle $62.8 million additions and renovations to Feb. 2019 MSD of Schmidt Associates KBSO Consulting LLC, Schmidt The Hagerman Group, 23 schools 358,776 Eastwood Middle School and Aug. 2021 Washington Associates, Shrewsberry Powers & Sons 4401 E. 62nd St., 1301 W. 73rd St. Westlane Middle School Township Associates, Lynch Harrison & Construction Co., Brumleve, Design 27 CorGroup JV Penrose on Mass $62.4 million 236 apartment units above 37,000 Jan. 2016 J.C. Hart Co., Schmidt Associates Schmidt Associates, Lynch J.C. Hart Co. Inc., 500 Massachusetts Ave. 450,000 square feet of retail May 2019 Strongbox Harrison & Brumleve F.A. Wilhelm, Powers 24 Commercial & Sons Construction Co. Inc. InterContinental Hotel $61.4 million 180-room luxury hotel including Dec. 2018 Keystone Group Ratio, Gettys DND Keystone Group 17 W. Market St. 149,780 rooftop restaurant and bar at former Dec. 2020 25 Illinois Building Research by Terry Sowka (current as of Feb. 15, 2019) Email: [email protected] Some projects may have been omitted due to Information was provided by the individual lack of information or deadline restrictions. architects, engineers, construction companies and developers and has not been independently DND=did not disclose The Indianapolis Business Journal list of largest verified. INDOT=Indiana Department of Transportation Indianapolis-area ongoing construction projects LLC=limited liability company is the most comprehensive available. For copies of Top 25 lists are compiled each December in the (1) ongoing as of March 1, 2019 MSD=metropolitan school district this list, go to www.IBJ.com and click on the "lists" Book of Lists. (2) includes soft costs, excluding land NA=not applicable link. Largest Indianapolis-Area Ongoing Construction Projects(1) (Ranked by estimated cost (2)) GENERAL ESTIMATED START CONTRACTOR(S)/ PROJECT COST DESCRIPTION/ COMPLETION CONSTRUCTION RANK LOCATION SQUARE FEET MAJOR TENANT TARGET OWNER(S) ARCHITECT(S) ENGINEER(S) MANAGER(S) Indiana University Health North $55.0 million two-story cancer center with March 2018 Indiana University MSKTD & Associates

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    2 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us