Optimisation of Harbour Line Part-II (Kurla- G.T.B. Nagar)

Optimisation of Harbour Line Part-II (Kurla- G.T.B. Nagar)

MUMBAI URBAN TRANSPORT PROJECT LIST OF THE PAPs / PAHs ALLOTTED AT OPT. OF HARBOUR LINE PART-II (KURLA - G.T.B. NAGAR) FLAT NO. BLDG. DATE OF SR. NO. I. D. NO. MAP NO. SUB-PROJECT NAME OF THE OWNER SITE FLOOR / SHOP NO. ALLOTMENT NO. 1 378 11 (EAST-B) HRL-II SURENDRA SHANKAR REWALE Kokari Agar, Wadala B-7 GR 1 2 466 11 (EAST-B) HRL-II SADASIVAM C. NADAR Kokari Agar, Wadala B-4 GR 1 3 94/96 11 (EAST-B) HRL-II MURTI RAMAN DEVENDRA Kokari Agar, Wadala D-2 GR 001 4 195 11 (EAST-C) HRL-II YADAV LAKHRAJ ARJUN Kokari Agar, Wadala B-3 GR 1 5 151 11 (EAST-D) HRL-II K.VADIVEL Rock Line 12 GR 001 10/9/2004 6 384 11 (EAST-D) HRL-II BABA FAKIR Rock Line 13 GR 001 19-10-2004 7 413 11 (EAST-D) HRL-II SHELJI ANAND KAMBLE Kokari Agar, Wadala D-1 GR 001 8 300 11 (WEST-B) HRL-II GOVIND PRASAD KANOJIYA Kokari Agar, Wadala A-3 GR 1 2/3/2010 9 229 11 (WEST-C) HRL-II MEDAI UGRA NAI Kokari Agar, Wadala B-2 GR 1 10 296 11 (WEST-C) HRL-II DR. HUSAIN SAJAT Kokari Agar, Wadala D-3 GR 001 11 336 11 (WEST-C) HRL-II DR. UPADHAYAY VINOD SUBHEDAR Kokari Agar, Wadala D-4 GR 001 S. V. Patel Site , 12 19 11 (WEST-D) HRL-II KASHIRAM GUNAJI SAWANT 51 GR 001 26-04-2005 Mankhurd 13 15/16 12 (EAST) HRL-II DR. DAYANAND RACHA Kokari Agar, Wadala C-2 GR 1 Page 1 of 89 MUMBAI URBAN TRANSPORT PROJECT LIST OF THE PAPs / PAHs ALLOTTED AT OPT. OF HARBOUR LINE PART-II (KURLA - G.T.B. NAGAR) FLAT NO. BLDG. DATE OF SR. NO. I. D. NO. MAP NO. SUB-PROJECT NAME OF THE OWNER SITE FLOOR / SHOP NO. ALLOTMENT NO. 14 11 12 (WEST) HRL-II K.RAJU KARPAYYA Mankhurd Site 95 GR 1 15 312 11 (EAST-A) HRL-II ISAIKANI SHIVARAMAN NADAR Kokari Agar, Wadala B-1 GR 2 16 379 11 (EAST-B) HRL-II SAUNDRA P. TRIVENDRAM Kokari Agar, Wadala B-7 GR 2 17 762 11 (EAST-B) HRL-II BUDIRAM SUVGA KEVAT Rock Line 4 GR 002 23-08-2004 18 382/383 11 (EAST-B) HRL-II AKLESH L. CHOURASIYA Kokari Agar, Wadala B-2 GR 2 19 211 11 (EAST-D) HRL-II PANDU PUJARI Rock Line 13 GR 002 10/10/2004 20 278 11 (EAST-D) HRL-II SAJABAI BHANUDAS KILLARE Kokari Agar, Wadala 4 Gr 2 21 79 11 (WEST-C) HRL-II R.KARNAN Runwal Site 16 GR 002 23-10-2004 22 421 11 (WEST-C) HRL-II LINA ALLEX D'SOZA Kokari Agar, Wadala D-3 GR 002 23 244 11 (WEST-C) HRL-II ASHOK HARILAL GUPTA Kokari Agar, Wadala B-2 GR 2 24 70 11 (WEST-E) HRL-II BELLARSWAMI MARI Rock Line 12 GR 002 28-08-2004 25 22 12 (WEST) HRL-II KAYYUM SHEIKH Mankhurd Site 95 GR 2 26 117 11 (EAST-A) HRL-II NARAYANLAL T. PARMAR Kokari Agar, Wadala B-1 GR 3 Page 2 of 89 MUMBAI URBAN TRANSPORT PROJECT LIST OF THE PAPs / PAHs ALLOTTED AT OPT. OF HARBOUR LINE PART-II (KURLA - G.T.B. NAGAR) FLAT NO. BLDG. DATE OF SR. NO. I. D. NO. MAP NO. SUB-PROJECT NAME OF THE OWNER SITE FLOOR / SHOP NO. ALLOTMENT NO. 27 273 11 (EAST-A) HRL-II KAMTAPRASAD KEVAT Runwal Site 3 GR 003 4/6/2008 28 156 11 (EAST-B) HRL-II V.P.MANI Mankhurd Site 95 GR 3 29 375 11 (EAST-B) HRL-II PADMAVATI TRIVENDRAM Kokari Agar, Wadala B-7 GR 3 30 977 11 (EAST-B) HRL-II SHAIBUDDIN BADRINATH Runwal Site 16 GR 003 23-10-2004 31 38 11 (WEST-C) HRL-II R. KRISHNAN SHETTIYAR Kokari Agar, Wadala B-7 GR 3 32 232 11 (WEST-C) HRL-II GANESH Kokari Agar, Wadala D-3 GR 003 33 465 11 (WEST-C) HRL-II VENKATESH PERIYAPPA Mankhurd Site 94 GR 3 34 48 11 (WEST-D) HRL-II LATHA BHASKARAN Runwal Site 7 GR 3 3/6/2008 35 74 11 (WEST-E) HRL-II PARVATI GOVIND SHIRKE Rock Line 12 GR 003 25-08-2004 36 159 11 (EAST-A) HRL-II DR. SHAMIM AHMED Kokari Agar, Wadala D-4 GR 4 37 380 11 (EAST-B) HRL-II SAOUNDRA P. THIRUVENGADAM Kokari Agar, Wadala B-1 GR 4 38 615 11 (EAST-B) HRL-II LILA PREMKUMAR Kokari Agar, Wadala D-3 GR 004 39 63 11 (EAST-C) HRL-II RAJENDRA PRASAD SHIVNATH PRAJAPATI Kokari Agar, Wadala B-7 GR 4 Page 3 of 89 MUMBAI URBAN TRANSPORT PROJECT LIST OF THE PAPs / PAHs ALLOTTED AT OPT. OF HARBOUR LINE PART-II (KURLA - G.T.B. NAGAR) FLAT NO. BLDG. DATE OF SR. NO. I. D. NO. MAP NO. SUB-PROJECT NAME OF THE OWNER SITE FLOOR / SHOP NO. ALLOTMENT NO. 40 106 11 (EAST-D) HRL-II PALANI SWAMI K. DEVENDRA/LAXMI Kokari Agar, Wadala D-1 GR 004 41 379 11 (EAST-D) HRL-II SULOCHANA NARAYAN CHAVAN Rock Line 13 GR 004 12/9/2004 42 293 11 (WEST-B) HRL-II DEVENDRA CHINAPPA Mankhurd Site 94 GR 4 43 377 11 (WEST-C) HRL-II SHANMURGAM A. Rock Line 3 GR 004 11/9/2004 44 61 11 (WEST-E) HRL-II BHOLANATH SURESHCHANDRA SHARMA Rock Line 12 GR 004 29-09-2004 45 62 12 (WEST) HRL-II BADRI PRASAD KANOJIYA Rock Line 11 GR 004 9/9/2004 46 285 11 (EAST-B) HRL-II ANGAI MINLAPPA Mankhurd Site 95 GR 5 47 41 11 (EAST-C) HRL-II SHIVSHANKAR GOKUL TIWARI Runwal Site 7 GR 5 4/6/2008 48 281 11 (EAST-D) HRL-II MAHADEV MOTIRAM BADDHE Rock Line 13 GR 005 12/9/2004 49 7 11 (WEST-A) HRL-II RAJU T. NAIR Kokari Agar, Wadala C-1 GR 005 50 394 11 (WEST-A) HRL-II SHYAMUVEL NAUMANI NADAR Kokari Agar, Wadala B-7 GR 5 51 54 11 (WEST-C) HRL-II KUPAI KANDA SWAMI Kokari Agar, Wadala D-3 GR 005 52 9 11 (WEST-E) HRL-II DEVAPPA MALAPPA KASVE Rock Line 12 GR 005 21-10-2004 Page 4 of 89 MUMBAI URBAN TRANSPORT PROJECT LIST OF THE PAPs / PAHs ALLOTTED AT OPT. OF HARBOUR LINE PART-II (KURLA - G.T.B. NAGAR) FLAT NO. BLDG. DATE OF SR. NO. I. D. NO. MAP NO. SUB-PROJECT NAME OF THE OWNER SITE FLOOR / SHOP NO. ALLOTMENT NO. 53 10 12 (EAST) HRL-II MOHD. ABID FAROOQUE Kokari Agar, Wadala B-1 GR 5 54 123 11 (EAST-B) HRL-II KARAPAN DEVENDRA Mankhurd Site 95 GR 6 S. V. Patel Site , 55 4 11 (EAST-C) HRL-II M.CHANDRADAS YADAV 16 GR 006 1/4/2005 Mankhurd 56 30 11 (WEST-D) HRL-II DEVANAND SINGH Rock Line 1 GR 006 29-10-2004 57 80 11 (WEST-E) HRL-II ROSHAN NIYAZGUL KHAN Runwal Site 6-A GR 006 27-10-2004 58 84 11 (WEST-E) HRL-II RAJAMMA KANDSWAMI DEVENDRA Rock Line 12 GR 006 30-09-2004 59 114 12 (EAST) HRL-II SHRIVASTAVA BHARAT GAYAPRASAD Rock Line 2 GR 006 23-08-2004 60 465 11 (EAST-B) HRL-II SADASHIVAM C. NADAR Kokari Agar, Wadala C-1 GR 007 61 700 11 (EAST-B) HRL-II CHHOTELAL JAISWAL Kokari Agar, Wadala B-1 GR 7 62 148 11 (EAST-D) HRL-II UMESH KUMBHARI SHARMA Runwal Site 15 GR 007 63 248 11 (WEST-C) HRL-II POAVAI PALANISWAMY Mankhurd Site 95 GR 7 64 83 11 (WEST-E) HRL-II PAPATI KANDAN Rock Line 12 GR 007 23-08-2004 65 95 11 (EAST-B) HRL-II A. RAMAN DEVENDRA Kokari Agar, Wadala B-1 GR 8 Page 5 of 89 MUMBAI URBAN TRANSPORT PROJECT LIST OF THE PAPs / PAHs ALLOTTED AT OPT. OF HARBOUR LINE PART-II (KURLA - G.T.B. NAGAR) FLAT NO. BLDG. DATE OF SR. NO. I. D. NO. MAP NO. SUB-PROJECT NAME OF THE OWNER SITE FLOOR / SHOP NO. ALLOTMENT NO. 66 122 11 (EAST-D) HRL-II MARIYAMMA MOHAN Rock Line 13 GR 008 20-10-2004 67 16 11 (WEST-C) HRL-II MARAI Antop Hill 6 GR 008 68 45 11 (WEST-E) HRL-II PANDURANG GOPAL YADAV Rock Line 12 GR 008 27-10-2004 69 258 11 (WEST-C) HRL-II SENGODEN PONNUSWAMY DEVENDRA Rock Line 11 GR 009 19-10-2004 70 34 11 (WEST-E) HRL-II MONIKABAI KACHRU GUNJAL Rock Line 12 GR 009 19-10-2004 S. V. Patel Site , 71 236 12 (EAST) HRL-II PANNER SELVAM 9 GR 009 1/4/2005 Mankhurd 72 36 11 (WEST-E) HRL-II KANDASWAMI MARIMUTTU DEVENDRA Rock Line 12 GR 010 23-09-2004 S. V. Patel Site , 73 219 12 (EAST) HRL-II A.D.MANIKA VELU 9 GR 010 1/4/2005 Mankhurd S. V. Patel Site , 74 4 12 (WEST) HRL-II M.ALIMUTTU 16 GR 010 1/4/2005 Mankhurd S. V. Patel Site , 75 1007 11 (EAST-B) HRL-II BADRINATH TEJU JAISWAL 16 GR 011 1/4/2005 Mankhurd 76 292 11 (WEST-C) HRL-II RAMASHAY SHARMA Rock Line 13 GR 011 11/9/2004 77 2 11 (WEST-D) HRL-II SHRIPAT G.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    89 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us