A. General History 1

A. General History 1

GENERAL HISTORY AND SALIENT FEATURES OF SOLAPUR DIVISION A. GENERAL HISTORY 1. Territorial Jurisdiction: PERIOD: Prior to 1953 (Fig in kms) SECTION DISTANCE Gauge Railway (Kms) PUNE-GANGAPUR ROAD 349.73 BG Great Indian Peninsular (GIP) DD-MMR 236.61 BG Great Indian Peninsular (GIP) GANGAPUR ROAD-WADI 63.30 BG Nizam State Railway MRJ-KWV 189.19 NG Barshi Light Railway (BLR) KWV-LUR 136.72 NG Barshi Light Railway (BLR) DD-BARAMATI 43.70 NG Private PERIOD: After 1953 YEAR DIVISION ZONE SECTION 1953 SOLAPUR Central Railway PUNE-RC DD-MMR 1954 SOLAPUR Central Railway Section added KWV-LUR(NG) KWV-MRJ(NG) DD-BRMT(NG) 1966 SOLAPUR South Central Section deleted Railway PA-DD DD-MMR DD-BRMT(NG) 1967 SOLAPUR South Central Section added Railway DD-PUNE 1977 SOLAPUR Central Railway Section added DD-MMR Section deleted WD-RC 1978 SOLAPUR Central Railway Section added MR-WADI 2003 SOLAPUR Central Railway Section added LUR-LURR Conversion to BG KWV-PVR 2004 SOLAPUR Central Railway Section deleted ANK-MMR (Excl.) 2007 SOLAPUR Central Railway Conversion to BG LUR-UMD Doubling SUR-PK 2008 SOLAPUR Central Railway Doubling PK-MO 2016 SOLAPUR Central Railway Doubling Hotgi-Tilati 2017 SOLAPUR Central Railway Doubling Mohol-Wakav and Tilati-Akkalkot and connectivity between Ahmadnagar-Narayandoh. 2. (A) Progress of Doubling (i) Completed Works Section Distance (in KMs) Year of Completion SHAHBAD-WADI 10.30 1970 SHAHBAD-GULBARGA 26.33 1989 SOLAPUR-HOTGI 15.07 1999 DAUND-BHIGVAN 27.68 2002 PAKNI-SOLAPUR 16.28 2007 MOHOL-PAKNI 17.00 2008 HOTGI-TILATI 6.45 March2016 MOHOL-WAKAV 22.59 Feb 2017 TILATI-AKKALKOT 13.88 April 2017 Doubling/Electrification works in progress executing by RVNL. (B) Progress of Gauge Conversion Work Year of Sanction Section (in Kms) Year of Completion 1. LTRR-LUR 2003 (33 kms) Gauge conversion 2. LUR-UMD 2007 of Latur-Miraj 1994-95 (80kms) section (374 Kms) 3. UMD-KWV July-2008 (72 Kms) 4. KWV-PVR 2001 (52 Kms) July -2010 5. PVR-MRJ (For goods) (135 kms) Feb-2011 (For All) B. SALIENT FEATURES GENERAL: 1.Route Length (Kms) : 955.42 Kms S/L : 800.01 Kms 83.73% D/L : 155.41 Kms 16.27% 2.Total Number of Stations : 104 B Class : 76 (3 lever frames) Special Class: 01 Halt :12 3. Civil District Headquarters within the division: Karnataka: Gulbarga Maharashtra: Solapur,Pune,Ahmednagar,Nashik,Latur,Usmanabad,Sangli 4.System of Working: Absoulte Block working system over the division. 5.States Covered : Maharashtra State : 91.26% Karnataka : 08.74% 3. Freight Operations: 3.1 IMPORTANT Loading & Unloading Stations: Stations where commodities (indicated) are accepted for loading /booked for unloading: Commodities Loading Stations Cement, Wadi,Hotgi,Gulbarga,Shahbad Clinker DOC Solapur,Latur Onion Yeola,Kopergaon,Rahuri Sugar Belapur,Rahuri,Ahmednagar,Kopergaon,Bhigvan, Kurduwadi, Solapur,Gulbarga,Latur,PAndharpur,Kavethemahankal Iron-ore Wadi Commodities Unloading Stations Cement Solapur,Ahmednagar,Bhigvan,Belapur,Gulbarga Fertilizer Gulbarga,Solapur,Kurduwadi,Bhigvan,Ahmednagar, Belapur,Kopergaon Coal Wadi,Bhigvan Military Ahmednagar,Vilad traffic Food grain Gulabrga,Solapur,Ahmednagar,Belapur,Kurduwadi,Latur POL Wadi,Hirenanduru,Pakni,Akolner Clinker Hotgi 3.2 Important Goods Shed Yeola,Kopergaon,Rahuri,Belapur,Ahmednagar,Bhigvan,Kurduwa di,Solapur,Gulbarga,Wadi,Latur,Usmanabad & Pandharpur. 3.3 Foreign Rly & Local Interchange Points of SUR Division Foreign Interchange Points Avg. trains/day T/O H/O 1. Wadi 1.SC Rly(GTL) 2.23 4.24 2.SC Rly (SC) 7.20 3.25 3.SC Rly (NED) 2.61 3.02 2 Hotgi SW Rly (UBL 1.53 0.93 Division) Local Interchange Points 1. DD-PUNE division 11.55 12.49 2. ANK-BSL division 4.60 6.14 3. Miraj-Pune division 1.46 1.11 3.4 Major Sidings: SN Name of Siding Commodity dealt 1 UltraTech Cement Hotgi Cement 2 ACC Siding Wadi Cement 3 Tilati Siding Tilati Cement 4 IOC Akolner POL 5 IOC Pakni POL 6 IOC Hirenanduru POL 7 Military Siding Ahmednagar Military Goods 3.5 Freight Examination Depots : Daund, Wadi 3.6 Fueling Points: Daund, Kurduwadi & Wadi 4. Coaching Operations Section Mail/Express Passenger Daily Non-daily Daily Non-daily DD-SUR 17 31 2 2 SUR-WADI 15 20 6 - DD-MMR 6 31 4 - KWV-MRJ/PVR 3 2 3 1 KWV-LUR-LTRR 1 6 2 - SUR-HG/GDG 4 5 6 1 Operating Statistics Items 2016-17 Originating Loading ( 8wu/day ) Cement 138.00 Clinker 56.00 Total 194.00 Others 44.00 Total 238.00 Million tonnes Cement 3.312 Clinker 1.376 Total 4.688 Others 0.917 Total 5.605 Punctuality M/Exp. 92.21 Pass. 84.04 Asset Utilisation Engine Utilisation DSL LOCO 374.00 Electric Loco 322.00 Wagon Utilisation a) Wagon Kms/Wagon Day in Use 286.32 b) Wagon Turn round (In days) 1.50 c) l.Divisional Wagon Balance (Railway) 1974 d) Net Tonn Kilometers (Wagon days) 12854 e) % of Distt. Wagons unloaded to total available 98.05.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    5 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us