All Notices Gazette

All Notices Gazette

ALL NOTICES GAZETTE CONTAINING ALL NOTICES PUBLISHED ONLINE BETWEEN 29 SEPTEMBER AND 1 OCTOBER 2017 PRINTED ON 2 OCTOBER 2017 PUBLISHED BY AUTHORITY | ESTABLISHED 1665 WWW.THEGAZETTE.CO.UK Contents State/ Royal family/ Parliament & Assemblies/ Honours & Awards/ Church/ Environment & infrastructure/2* Health & medicine/ Other Notices/19* Money/ Companies/22* People/73* Terms & Conditions/105* * Containing all notices published online between 29 September and 1 October 2017 ENVIRONMENT & INFRASTRUCTURE Frost, Marine and Fisheries Division, Welsh Government, Cathays Park, Cardiff CF10 3NQ or email [email protected] to be ENVIRONMENT & received no later than 31st October 2017 and must send a copy of the statement of objection to The Fisheries Advisor (Rod Duties), Environment Agency, Horizon House, Deanery Road, Bristol BS1 INFRASTRUCTURE 5AH. Peter Kellett, Director of Legal Services on behalf of the Environment Agency AGRICULTURE, FORESTRY & FISHERIES Sarah Asbrey, Head of Legal Services on behalf of Natural Resources Wales (2876471) 2876471ENVIRONMENT AGENCY NATURAL RESOURCES WALES SALMON AND FRESHWATER FISHERIES ACT 1975 ENVIRONMENTAL PROTECTION ROD AND LINE FISHING LICENCE DUTIES Pursuant to section 25 of, and Schedule 2 to, the Salmon and 2876376FULL CIRCLE GENERATION LTD Freshwater Fisheries Act 1975, as amended, the Environment Agency PUBLIC NOTIFICATION OF AN APPLICATION MADE UNDER and Natural Resources Wales gives notice of their intention to make REGULATION 19 OF THE POLLUTION PREVENTION AND no changes to Rod and Line fishing licence duties for the period 1 CONTROL (INDUSTRIAL EMISSIONS) REGULATIONS April 2018 to 31 March 2020. These duties will have effect throughout (NORTHERN IRELAND) 2013 the Environment Agency area as described in section 6(7) of the INTEGRATED POLLUTION PREVENTION AND CONTROL Environment Act 1995 and the Natural Resources Wales area as Notice is hereby given that Full Circle Generation Ltd has applied to described in section 6(7A) of the Environment Act 1995. the Chief Inspector for an Integrated Pollution Prevention and Control Duties (1 April 2018 to 31 March 2019 and 1 April 2019 to 31 March (IPPC) Permit Variation to operate an installation for combustion of 2020). Refuse Derived Fuel with a capacity greater than 3 tonnes per hour. Licence type Licence 1st April 2018 Structural The variation is for an increase in throughput from 120,000 tonnes per Category to 31st March Change annum to 180,000 tonnes per annum. The installation is located at 7 2020 Airport Road, Belfast BT3 9DZ. Non-migratory Full annual (2) £30 365 day licence The application contains all particulars as required by the Regulations trout, char, Concessionary £20 (4) including a description of foreseeable significant effects of emissions freshwater fish annual (3) from the installation on the environment. (coarse fish) 1-day temporary £6 Option to A copy of the application which contains the information listed in and eels 8-day temporary £12 upgrade to a full Schedule 7 Part 1 (1) of the regulations is available for public 365 day licence inspection free of charge between the hours of 09.30-12.00 and (5) 14.00-15.30 at Northern Ireland Environment Agency, Klondyke Junior annual (6) £0 Free junior Building, Cromac Avenue, Gasworks Business Park, Lower Ormeau licence Road, Belfast, BT7 2JA and Belfast City Council, Cecil Ward Building, Full annual 3 rod £45 3 rod licence (4) 4-10 Linenhall Street, Belfast BT2 8BP. In addition, members of the licence (7) public who wish to obtain a copy of the relevant information Concessionary £30 contained in the register can do so upon the payment of a reasonable annual 3 rod charge to cover the cost of photocopying. licence (3) Written representations about the application may be sent to the Salmon, Full annual £82 365 day licence Chief Inspector of the Industrial Pollution & Radiochemical migratory trout Concessionary £54 (4) Inspectorate, Northern Ireland Environment Agency, (address as (sea trout), annual (3) above), within 42 days from the date of this publication. All non-migratory 1-day temporary £12 Option to representations will be placed on the public register unless a trout, char, 8-day temporary £27 upgrade to a full representation contains a written request to the contrary. If there is freshwater fish 365 day licence such a request, the register will only include a statement that there (coarse fish) (5) has been such a request. (2876376) and eels Junior annual (6) £0 Free junior licence Notes: (1) The rod licence duties advertised above remain the same 2873786WEST LOTHIAN COUNCIL as 1 April 2017 to 31 March 2018 and will result in no increase in THE TOWN AND COUNTRY PLANNING (ENVIRONMENTAL duties for a minimum of two years. IMPACT ASSESSMENT) (SCOTLAND) REGULATIONS 2017 (2) A licence allows the use of up to two rods at the same time when NOTICE UNDER REGULATION 20 fishing for freshwater fish and eels, subject to byelaws. Notice is hereby given that additional information (Groundwater (3) The concessionary charge will apply to: Abstractions and Groundwater Dependant Terrestrial Ecosystems (a) persons aged 65 years or older, Report; NVC Survey Report) has been submitted to West Lothian (b) persons in possession of a Blue Badge parking concession, Council by Fauch Hill Sustainable Energy Ltd relating to the (c) persons in receipt of Disability Living Allowance or Personal application in respect of formation of a wind farm consisting of 12 Independence Payment. turbines with maximum height to blade tip of 125m and maximum (4) The full annual licence will run from the time and date of purchase, generating capacity of 48MW, crane hardstandings, access tracks, or requested future start time and date, to 23:59 on the eve of the underground cabling, construction compound/storage area, anniversary of purchase one calendar year later. substation/control building and borrow pits (application number (5) A single 1 or 8 day fee will be discounted from the full annual 0235/FUL/17). licence of the same licence type on upgrading. A fourteen day The proposed development at Fauch Hill, West Colzium and window from the date and time of expiry of a temporary licence will Crosswoodburn, West Calder is subject to assessment under the exist to upgrade to a full annual licence. The window to upgrade will Town and Country Planning (Environmental Impact Assessment) expire at 23:59 on the fourteenth day. (Scotland) Regulations 2017. (6) Persons who are between 13 to 17 years on the date of registering The additional information can be purchased from Burness Paull LLP, of the licence. 50 Lothian Road, Edinburgh, EH3 9WJ or (7) The 3 rod licence allows the use of up to three rods at the same [email protected]. The additional information together with time when fishing for freshwater fish and eels, subject to byelaws. the associated planning application can be inspected free of charge Any person who wishes to object to the proposed full annual, online at www.westlothian.gov.uk or at West Lothian Council, West concessionary and junior duties for England must send a statement of Lothian Civic Centre, Howden South Road, Livingston EH54 6FF. Any their objection in writing to Rod Duties– Migratory and Freshwater Fisheries team, Defra, Nobel House, 17 Smith Square, London, SW1P 3JR or email [email protected] or for Wales, to Jeremy 2 | CONTAINING ALL NOTICES PUBLISHED ONLINE BETWEEN 29 SEPTEMBER AND 1 OCTOBER 2017 | ALL NOTICES GAZETTE ENVIRONMENT & INFRASTRUCTURE person who wishes to make representations to the council about the Project type Afforestation additional information should make them in writing within 30 days of Location Knockans South/ Ballynalougher, Cushendall the date of this notice to Development Management, West Lothian Grid Reference D 229 263 Council, West Lothian Civic Centre, Howden South Road, Livingston Area 4.96ha EH54 6FF Project description Planting of oakwood Date: 28 September 2017 (2873786) Opinion Not relevant. There are no likely significant environmental effects Reference Defor 17/18-03 2873737ENVIRONMENTAL IMPACT ASSESSMENT Project type Deforestation Forest Service, an Agency of the Department of Agriculture, Location Umbra, Downhill, Co. Londonderry Environment and Rural Affairs has provided opinions on the following Grid Reference C 726 358 projects in respect of the Environmental Impact Assessment (Forestry) Area 3.53ha Regulations (Northern Ireland) 2006 (as amended). Project description Removal of conifers and conversion to SAC dune Reference Affor 17/18-01 grassland habitat Project type Afforestation Opinion Not relevant. There are no likely significant environmental Location Ligadaughtan/ Knockmacloskey, Cushendun effects Grid Reference D 257 354 Maps showing the extent of the projects have been placed on Area 3.15ha www.daera-ni.gov.uk/topics/forestry. Further information may be Project description Planting of oakwood obtained by contacting Policy and Regulation Branch at 028 6634 Opinion Relevant. There are likely significant environmental effects 3165 or by emailing [email protected]. Any because of landscaping and part of the site comprises Coastal person wishing to comment on the likely environmental effects of the Maritime Cliff and Slopes priority habitat. This project will require an above projects may do so in writing by 30 October 2017 to Forest environmental statement Service, Policy and Regulation Branch, Inishkeen House, Killyhevlin, Reference Affor 17/18-02 Enniskillen, Co. Fermanagh BT74 4EJ or by emailing Project type Afforestation [email protected] (2873737) Location Moyad Upper, Attical Grid Reference J 287 216 Area 4.52ha Project description Planting of oakwood Planning Opinion Relevant. There are likely significant environmental effects because: The establishment of a seed source could have the potential TOWN PLANNING for colonisation of habitats within the Eastern Mournes SAC/ ASSI; the entire area is priority habitat lowland heathland; and woodland 2875582FALKIRK COUNCIL creation would be out of keeping with the landscape character of this APPLICATION(S) FOR PLANNING PERMISSION part of the Mourne AONB.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    108 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us