4.8 Utilities

4.8 Utilities

SECTION 4.8: UTILITIES 4.8 UTILITIES Introduction This section describes existing conditions (including regulations) relating to utilities occurring or potentially occurring in the Corridor Plan Area, and potential impacts to water supply, wastewater, and solid waste services that could occur with implementation of the Corridor Plan and the Bay Meadows Specific Plan Amendment (Bay Meadows project). Mitigation measures for any significant impacts are also identified. This assessment was prepared using information obtained from utility providers in the project area and published documents pertaining to the project area. Throughout the existing conditions section, discussion of the Corridor Plan Area includes the Bay Meadows project site. Therefore, the terms “project area” and “project location” refer to both the Corridor Plan Area and the Bay Meadows project site. However, a separate discussion of existing conditions and impacts and mitigation measures associated with the Bay Meadows project is provided. Existing Conditions Corridor Plan Area Water Supply California Water Service Company (Cal Water) The project area is within the City of San Mateo, which receives water service from the California Water Service Company (Cal Water). The City is within Cal Water’s Mid-Peninsula District, which serves more than 120,000 people in the cities of San Mateo and San Carlos, including over 31,000 residential and nearly 4,000 commercial connections. Within the Cal Water service area, single-family and multi-family residences account for 87.8 percent and 1.6 percent of water connections, respectively, and commercial connections total 9.3 percent. Industrial, government, and construction uses are small, at 1.3 percent (Cal Water, 2003b). The Cal Water system comprises 41 storage tanks with a combined storage capacity of up to 21.2 million gallons of water and over 358 miles of mains for water delivery. Most of the City’s existing water system was installed in the 1950s and 1960s, while portions of the Hillsdale Boulevard system were replaced in the 1970s. Under normal conditions, the pressure of the system is 55 pounds per square inch (psi). Presently, the City's water supply is considered sufficient to meet the current demand, which averages 16.9 million gallons of water per day (Cal Water, 2003b). San Francisco Public Utilities Commission Agreement Cal Water’s Mid-Peninsula District is 100 percent dependent on imported surface water purchased from the San Francisco Public Utilities Commission (SFPUC) under a 25-year contract (Cal Water, 2003a). SFPUC San Mateo Corridor Plan and Bay Meadows Specific Plan Amendment EIR 4.8-1 EDAW, Inc. SECTION 4.8: UTILITIES receives its water from the Hetch-Hetchy system, the Tuolumne Basin, and various local sources, and serves the City of San Mateo through connections in the northwest region of the City. Cal Water’s contract with the SFPUC accounts for Cal Water's purchases by its three peninsula districts: the Bear Gulch District, Mid-Peninsula District and South San Francisco District. The contract with SFPUC allows Cal Water to purchase up to 47,400 acre-feet (AF) of water per year for all three peninsula districts. This amount was set based on the SFPUC's locally generated supply, since the Raker Act, which authorized the construction of the Hetch-Hetchy Project, excludes investor-owned utilities like Cal Water from purchasing water produced by the Hetch-Hetchy Project. Based on current demand conditions, the five-year average purchased water demand is 39,142 AF, which indicates some water remains available within the original contractual allocation (Cal Water, 2003a). The contract with the SFPUC was amended in 1984 with the adoption of the Supplemental Agreement and Master Sales Contract. This agreement called for the development of a Supply Assurance Allocation (SAA) for all SFPUC suburban customers. The SAA allocates to these customers the available supply of 206,106 acre-feet per year (AFY) as a maximum annual average metered supply. This allocation was reached through negotiation in the early 1990s between the SFPUC and the Bay Area Water Users Association (BAWUA), an association of the suburban customers of the SFPUC. Cal Water’s SAA for its collective systems is 39,642 AFY. Dry Year Water Supply For single dry and multiple dry years, Cal Water uses SFPUC's Urban Water Management Plan (UWMP) information to estimate the availability of supply over a 20-year projection since the current source of all water to the Mid-Peninsula system is the SFPUC. During a single dry year, SFPUC anticipates a supply of 90 percent of normal supply. For multiple dry years, SFPUC anticipates a supply of 90 percent of normal supply for the first year and 80 percent of normal supply for each subsequent year (Cal Water, 2004). Experience has shown that cumulative dry years in a developed area like the San Francisco Bay Area do not result in a progressively greater annual demand for water as the dry period continues, beyond the second year. The region is mostly developed with urban uses that are comparatively resistant to dry climatic periods in terms of their water demands. Historical records indicate that residential, commercial and industrial uses generally will use the same amount of water during droughts as normal years, with perhaps an increase in irrigation for landscaping, however in multiple dry years, irrigation water use is substantially decreased (City of San Mateo Public Works Department, 2004). Therefore, in a single dry year Cal Water would be allocated 35,678 AFY (39,642 x 90%), and during subsequent multiple dry years, Cal Water would be allocated 31,714 AFY (39,642 x 80%) (Cal Water, 2004). The ten-year average total annual purchase from SFPUC is 37,234 AFY, and the five-year average is 39,142 AFY. Both the ten-year average and the five-year average are below Cal Water’s annual SAA for its San Mateo Corridor Plan and Bay Meadows Specific Plan Amendment EIR 4.8-2 EDAW, Inc. SECTION 4.8: UTILITIES collective Peninsula systems of 39,642 AFY. However, they exceed the anticipated supply during single and multiple dry years. During each of the last three years Cal Water's purchases were in excess of the SAA of 39,642 AFY, by amounts ranging from 326 AFY to 1,787 AFY (Cal Water, 2003a; Cal Water 2004). BAWUA’s Interim Water Shortage Allocation Plan BAWUA has developed an Interim Water Shortage Allocation Plan (IWSAP) that allocates water between its member water agencies during supply shortages. The allocation is based on the SAA and past and current demand levels. Under the IWSAP, water agencies that are exceeding their SAA could face cutbacks greater than the overall requested cutbacks. For example, if a supply shortage emergency prompted a 20 percent reduction in overall supply, then Cal Water, which exceeded its SAA over the last three years by two to three percent, would probably face a reduction in the order of 23 or 24 percent rather than 20 percent. If a water agency continued to take excess allocations during a declared shortage period, it would be subject to an Excess Usage Charge. Depending on the amount by which the allocation is exceeded, the Excess Usage Charge could be double or triple the amount being paid for the allocated water. The IWSAP also permits transfer of shortage allocations. The cost of these shortage allocations would be negotiated between the two parties conducting the transfer. The cost would likely be lower than any Excess Usage Charge (or else the purchasing water agency would have no incentive to purchase from the other selling agency), however it could still be quite expensive. Customers needing additional supplies in excess of their SAA to meet future demands would be required to pay for the additional supply at the full cost of development. If obtained from the SFPUC, based on the SFPUC's Master Plan from 2000, such future supplies would cost approximately $800 per acre-foot (Cal Water, 2004). Future Supply Plans and Sources Cal Water is investigating development of a local water supply to reduce their reliance on SFPUC supplies and to supplement supply for redevelopment projects. Moreover, developing a local supply will cost much less than paying to develop additional imported supplies (Cal Water, 2003a). Cal Water intends to develop sufficient local sources to generate an amount of water equal to 10 percent of the total system demand, which would amount to approximately 1,900 AFY. To this purpose Cal Water has budgeted the drilling of a test well in the Mid-Peninsula District service area. The assessment of the planned test well will take nearly one year to complete. If a sufficient groundwater supply is detected, then it would take another year to drill, develop and equip the well, with an additional year required for constructing any necessary water treatment facilities. In total, an additional water supply could be provided within two to three years (Cal Water, 2004). San Mateo Corridor Plan and Bay Meadows Specific Plan Amendment EIR 4.8-3 EDAW, Inc. SECTION 4.8: UTILITIES Water Planning The following water supply data are based upon a Water Supply Assessment prepared by Cal Water and subsequent communications with Cal Water. The City of San Mateo requested that Cal Water prepare a Water Supply Assessment in accordance with Senate Bill 610 (SB 610). SB 610 amended existing California land use and water supply law by requiring that water retail providers like Cal Water demonstrate that sufficient and reliable supplies are available to serve large-scale developments prior to completion of the environmental review for such projects. Specifically, SB 610 requires that a Water Supply Assessment include an inventory of the water provider’s total projected supplies and address whether those supplies will be available during normal, single-dry, and multiple-dry years during a 20-year projection, and also evaluate whether that projected available water would satisfy the demand of the proposed project; given present and planned future uses.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    28 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us