Measurements of Train-Induced Pressure Variations

Measurements of Train-Induced Pressure Variations

Simplon Tunnel (CH/IT) Measurements of train -induced pressure variations Description The 20 km long Simplon rail tunnel connects the Italian and Swiss railway networks. It is op- erated by the Swiss Federal Railways (SBB). The free cross-sectional area of the two single- track tunnel tubes of the Simplon tunnel is smaller than the free cross-sectional area of the Lötschberg base tunnel as well as the existing rail tunnels (double-track) at Gotthard and Lö- tschberg. Accordingly, in the Simplon tunnel Northern portal of the Simplon tunnel more extreme aerodynamic conditions appear at the same speed compared to other existing rail tunnels in Switzerland. The train-induced pressure variation had to be determined for an increase of travel speed from V train = 140 km/h to V train = 160 km/h in the tunnel. Train-induced pressure variations in railway tunnels are caused by: − Train entry and exit of tunnel − Train passages at changes of cross- sectional area (for example in crossover) − Train passage at the measurement location due to pressure changes along the train Installation inside of the cross-passage for data acquisition (left) Services HBI Haerter Consulting Engineers provided the Passage 160 km/h Passage 170 km/h following services: − Elaboration of the concept for measure- ments, commissioning of the measurement system and realization of the measure- ments of train-induced pressure variations [kPa] in the Simplon tunnel − Analysis of the measured data and check- ing of the plausibility of the data − Determination of the maximum positive and Pressurepressure deviation from normal negative pressure deviation from normal Time [h] pressure in the railway tunnel for single Pressure deviation from normal pressure in the runs with the train ETR 470 tunnel during test run of high-speed train ETR 470 − Determination of the maximum positive and negative pressure deviation from normal pressure in the railway tunnel during nor- mal train operation of several days − Summary report as decision bases for safety authority HBI Haerter www.hbi.ch 3_OBJ_B_039_Simplon_DRUCKMESS_E_2013-09-01.docx Beratende Ingenieure Consulting Engineers Ingénieurs Conseils Ingegneri Consulenti Ingenieros Consultores www.hbi.eu .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    1 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us