City of Bloomington Kirkwood Avenue Maintenance Project Weekly Construction Report for Week Ending 5/8/2020

City of Bloomington Kirkwood Avenue Maintenance Project Weekly Construction Report for Week Ending 5/8/2020

City of Bloomington Kirkwood Avenue Maintenance Project Weekly Construction Report for Week Ending 5/8/2020 Project RPR: C. R. Mitchell Substantial Completion Date: 6/30/2020 Final Completion Date: 6/30/2020 Original Construction Contract Amount: $1,057,857.95 Current Construction Contract Amount: $1,078,592.95 Approximate % Complete: 49.0 Progress for the Week: SATURDAY 5/2/20- E&B did subgrade treatment and clearing of right of way at Dunn St. Poured the bollard footer at North leg, Washington St. MONDAY 5/4/20- E&B poured crosswalk at North Washington St., did clearing right of way and did a 10” concrete patch at Dunn St. TUESDAY 5/5/20- To wet for controlling operation. WEDNESDAY 5/6/20- E&B poured crosswalk at alley and poured a bollard footer at Dunn St. THURSDAY 5/7/20- E&B poured a 10” concrete patch at Lincoln in intersection, did clearing right of way @ Lincoln, poured a bollard footer at South leg, Dunn St. FRIDAY 5/8/20- To wet for controlling operation. Upcoming Activities: Continue to do clearing right of way, pavement removal, common excavation, subgrade treatment, set forms, pour curb ramps, pour crosswalks, and pour bollard footers. Finish out Dunn and Lincoln St., Intersections and close the East leg, Walnut., ½ Intersection. Construction Issues: Dunn St., Intersection, North leg, still revising the alignment of the bollard footer as It conflicts with the storm box culvert. 120 West Spring Street, Suite 400 / New Albany, IN 47150 / 812.725.8595 / clarkdietz.com WEEKLY CONSTRUCTION REPORT Silver Hills Sanitary Sewer Improvements March 13, 2020 Page 2 An example of how a bollard change is accomplished. WEEKLY CONSTRUCTION REPORT Silver Hills Sanitary Sewer Improvements March 13, 2020 Page 3 Opened up 3 legs, Washington St., Intersection on Wednesday. North leg left closed while the concrete cures until Monday, 5/11. WEEKLY CONSTRUCTION REPORT Silver Hills Sanitary Sewer Improvements March 13, 2020 Page 4 Bollard footer recently constructed at Dunn St., Intersection, East leg. .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    4 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us