Florida Department of Transportation District 7 LOW BID DESIGN-BUILD

Florida Department of Transportation District 7 LOW BID DESIGN-BUILD

Florida Department of Transportation District 7 LOW BID DESIGN-BUILD REQUEST FOR PROPOSAL For I-275/SR93 Bus on Shoulder From Alt US19/SR595/5th Ave N to SR694/Gandy Blvd. Pinellas County Financial Projects Number(s): 443684-1-52-01 Federal Aid Project Number(s): N/A Contract Number: E7R17 Table of Contents I. Introduction. .......................................................................................................................1 A. Design-Build Responsibility .................................................................................. 1 B. Department Responsibility .................................................................................... 2 II. Schedule of Events. .............................................................................................................2 III. Threshold Requirements. ..................................................................................................3 A. Qualifications ......................................................................................................... 3 B. Joint Venture Firm ................................................................................................. 3 C. Price Proposal Guarantee ....................................................................................... 3 D. Pre-Proposal Meeting ............................................................................................ 4 E. Question and Answer ............................................................................................. 4 F. Protest Rights ......................................................................................................... 4 G. Non-Responsive Proposals .................................................................................... 4 H. Waiver of Irregularities .......................................................................................... 5 I. Modification or Withdrawal of Proposal ............................................................... 6 J. Department’s Responsibilities ............................................................................... 6 K. Design-Build Contract ........................................................................................... 6 IV. Disadvantaged Business Enterprise (DBE) Program. ......................................................6 A. DBE Availability Goal Percentage: ....................................................................... 6 B. DBE Supportive Services Providers: ..................................................................... 7 C. Bidders Opportunity List: ...................................................................................... 7 V. Project Requirements and Provisions for Work .............................................................7 A. Governing Regulations: ......................................................................................... 7 B. Innovative Aspects:.............................................................................................. 10 C. Geotechnical Services: ......................................................................................... 10 D. Department Commitments: .................................................................................. 10 E. Environmental Permits: ....................................................................................... 10 F. Railroad Coordination: ........................................................................................ 11 G. Survey: ................................................................................................................. 12 H. Verification of Existing Conditions: .................................................................... 12 I. Submittals: ........................................................................................................... 12 J. Contract Duration: ............................................................................................... 15 K. Project Schedule: ................................................................................................. 15 L. Key Personnel/Staffing: ....................................................................................... 16 M. Partner/Teaming Arrangement: ........................................................................... 16 N. Meetings and Progress Reporting: ....................................................................... 16 O. Quality Management Plan (QMP): ...................................................................... 17 P. Liaison Office: ..................................................................................................... 18 Page i Request for Proposal I-275/SR93 Bus on Shoulder From Alt US19/SR595/5th Ave N to SR694/Gandy Blvd. May 23, 2019 Q. Engineers Field Office: ........................................................................................ 18 R. Schedule of Values: ............................................................................................. 18 S. Computer Automation: ........................................................................................ 19 T. Construction Engineering and Inspection: ........................................................... 19 U. Testing: ................................................................................................................ 19 V. Value Added: ....................................................................................................... 19 W. Adjoining Construction Projects: ......................................................................... 20 X. Issue Escalation: .................................................................................................. 20 VI. Design and Construction Criteria. .................................................................................21 A. General: ................................................................................................................ 21 B. Vibration and Settlement Monitoring: ................................................................. 21 C. Geotechnical Services: ......................................................................................... 21 D. Utility Coordination ............................................................................................. 23 E. Roadway Plans:.................................................................................................... 24 F. Roadway Design: ................................................................................................. 25 G. Geometric Design: ............................................................................................... 27 H. Design Documentation, Calculations, and Computations: ................................. 27 I. Structure Plans: .................................................................................................... 27 J. Specifications: ...................................................................................................... 29 K. Shop Drawings:.................................................................................................... 29 L. Sequence of Construction: ................................................................................... 30 M. Stormwater Pollution Prevention Plans (SWPPP) ............................................... 30 N. Transportation Management Plan: ....................................................................... 30 O. Environmental Services/Permits/Mitigation: ....................................................... 31 P. Signing and Pavement Marking Plans: ................................................................ 31 Q. Lighting Plans: ..................................................................................................... 31 R. Signalization and Intelligent Transportation System Plans ................................. 32 S. Landscape Opportunity Plans: ............................................................................. 49 VII. Technical Proposal Requirements: ................................................................................49 A. General: ................................................................................................................ 49 B. Submittal Requirements: ...................................................................................... 50 C. Evaluation Criteria: .............................................................................................. 51 D. Final Selection Process: ....................................................................................... 51 VIII. BID PROPOSAL REQUIREMENTS. ...........................................................................51 A. Bid Price Proposal: .............................................................................................. 51 Page ii Request for Proposal I-275/SR93 Bus on Shoulder From Alt US19/SR595/5th Ave N to SR694/Gandy Blvd. May 23, 2019 ATTACHMENTS The Attachments listed below are hereby incorporated into and made a part of this Request for Proposal (RFP) as though fully set forth herein. A001_Project Advertisement A001.01_E7R17_Ad_052819.pdf A002_Specifications A002.01_Division I Design-Build Specifications A002.01.A_Division I Design Build Specifications A002.02_Divisions II and III Special Provisions identified by the Department to be used on the Project: A002.02.A_Mobilization (SP1010000DB) A002.02.B_Contractor Quality Control General Requirements (SP1050813DB) A002.02.C_Structures Foundations (SP4550000DB)

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    57 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us