BRAND NEW STATE-OF-THE-ART INDUSTRIAL SPACE IN CENTREPORT Stephen Sherlock Murray Goodman Vice President Executive Vice President T 204 928 5011 T 204 928 5009 C 204 799 5526 C 204 990 4800 [email protected] [email protected] INDUSTRIAL FOR LEASE (+/-) 6,000 SF TO (+/-) 80,190 SF PERIMETER HIGHWAY Property Highlights • Located in CentrePort Canada, the inland port, offering unparalleled access to tri-modal transportation (road, rail, air) • (+/-) 6,000 sf bays • Dock and grade loading • 28’ clear ceiling height ROUTE 90 • Brand new construction • Excellent exposure on CentrePort Canada Way • All major amenities nearby WAY • Quick access to major highways and key trade corridors A D A • Zoned I2 N A C WINNIPEG RICHARDSON RT PO INTERNATIONAL AIRPORT Lease Rate: TBD CENTRE CAM & Tax: TBD EXCELLENT OPPORTUNITY TO MOVE INTO A NEW HIGH EXPOSURE NEW GENERATION INDUSTRIAL PARK GENERAL NOTE: DRAWING IS INTENDED TO BE VIEWED IN COLOUR. PROPERTY INFORMATION DERIVED FROM SURVEY DATED FEBRUARY 25, 2019 DRAFTED BY BARNES & DUNCAN. SATELLITE IMAGE, PARK ROYALE WAY GOOGLE IMAGES DATED 2019. TOPOGRAPHIC SURVEY REQUIRED. MUNICIPALITY OF ROSSER REQUIRED TO REVIEW AND COMMENT ON SITE PLAN. CENTREPORT CANADA WAY CENTREPORT CANADA WAY EXISTING DITCH T.B.C. FRONT YARD 37 18'-0" 20'-0" 87 STALLS 20'-0" 50 18'-0" 20'-5 3/4" 3'-0" 20'-0 1/4" 50'-10" 610'-0" 110'-0" 107'-0" 66,200 SF 20'-0" 8'-0" 3 ISSUED FOR OWNER REVIEW MARCH 16, 2020 TC @ 4% -4'-0" 2 ISSUED FOR OWNER REVIEW JULY 22, 2019 TC 20'-0" 1.5% SITE PLAN 55'-0" 52'-0" 1 ISSUED FOR OWNER REVIEW JUNE 28, 2019 TC 68'-0 3/4" No. ISSUED FOR DATE BY 8'-0" @ 4% DRAWN BY: KK PHASE I PRINTING DATE: JULY 22, 2019 95'-0" 205'-0" 86'-0" STAMP 8'-0" @ 4% 52'-0" 68'-0" 1.5% 55'-0" 55'-0" -4'-0" -4'-0" 8'-0" @ 4% 5'-0" 5'-0" 30'-0" 660'-0" 40'-0" 660'-0" 120'-0" 123'-0" 123'-0" 80,19080,190 SF sf 49'-6" 80,190 SF 25'-0" 33'-0" 25'-0" 3'-0" 3'-0" 7'-0" 4'-0" 65 65 18'-0" EASEMENT - PLAN 30720 129 STALLS 10'-0" 129 STALLS 64 64 REAR YARD 20'-0" 1'-0" GENERAL NOTE: EASEMENT - RD. NO. 6, PLAN 52148 DRAWING IS INTENDED TO BE VIEWED IN COLOUR. PROPERTY INFORMATION DERIVED FROM SURVEY DATED FEBRUARY 25, 2019 DRAFTED BY BARNES & DUNCAN. SATELLITE IMAGE, EXISTING DITCH PARK ROYALE WAY GOOGLE IMAGES DATED 2019. EXISTING DITCH TOPOGRAPHIC SURVEY REQUIRED. MUNICIPALITY OF ROSSER REQUIRED TO REVIEW AND COMMENT ON SITE PLAN. N E J M A R K A R C H I T E C T NEW APPROACH CENTREPORT CANADARED WAY FIFE NEW APPROACH NEW APPROACH 2-54 Adelaide Street Winnipeg Manitoba R3A 0V7 CENTREPORT CANADA WAY P 204 947 3775 F 204 947 3789 www.nejmark.mb.ca Drawings and specifications, as instruments of service are the property of the architect, EXISTING DITCH T.B.C. the copyright in the same being reserved to them. No reproduction may be made without the permission of the architects, and when made, must bear their names. All prints to be returned. FRONT YARD 37 The contractor is to verify dimensions and date noted herein with conditions on the site 18'-0" 20'-0" 87 STALLS and is held responsible for reporting discrepancy to the architects for adjustment. 20'-0" 50 18'-0" 20'-5 3/4" 3'-0" PROJECT TITLE: 20'-0 1/4" 50'-10" 610'-0" 110'-0" 107'-0" STEELE INDUSTRIAL 66,200 SF 20'-0" 8'-0" 3 ISSUED FOR OWNER REVIEW MARCH 16, 2020 TC @ 4% DEVELOPMENT -4'-0" 2 ISSUED FOR OWNER REVIEW JULY 22, 2019 TC 20'-0" 1.5% 55'-0" 52'-0" 1 ISSUED FOR OWNER REVIEW JUNE 28, 2019 TC 68'-0 3/4" ROSSER, MANITOBA No. ISSUED FOR DATE BY 8'-0" @ 4% DRAWN BY: KK PRINTING DATE: JULY 22, 2019 95'-0" 205'-0" 86'-0" STAMP SHEET TITLE: 8'-0" @ 4% 52'-0" 68'-0" 1.5% 55'-0" 55'-0" OPTION 3: -4'-0" -4'-0" 8'-0" @ 4% 5'-0" 5'-0" PRELIMINARY SITE PLAN SITE PLAN 30'-0" 1 660'-0" 40'-0" 660'-0" 120'-0" COMMISSION NUMBER: SHEET NUMBER: 123'-0" 123'-0" 80,190 SF 49'-6" 80,190 SF 1.0 1.0 25'-0" 33'-0" 25'-0" 1925 A1.1 SCALE: N.T.S. 3'-0" 3'-0" 7'-0" 4'-0" 65 65 18'-0" EASEMENT - PLAN 30720 129 STALLS 10'-0" 129 STALLS E-FILE: 1925 - A1.1 - SITE PLAN.DWG 64 64 REAR YARD 20'-0" 1'-0" EASEMENT - RD. NO. 6, PLAN 52148 EXISTING DITCH EXISTING DITCH N E J M A R K A R C H I T E C T NEW APPROACH RED FIFE NEW APPROACH NEW APPROACH 2-54 Adelaide Street Winnipeg Manitoba R3A 0V7 P 204 947 3775 F 204 947 3789 www.nejmark.mb.ca Drawings and specifications, as instruments of service are the property of the architect, the copyright in the same being reserved to them. No reproduction may be made without the permission of the architects, and when made, must bear their names. All prints to be returned. The contractor is to verify dimensions and date noted herein with conditions on the site and is held responsible for reporting discrepancy to the architects for adjustment. PROJECT TITLE: STEELE INDUSTRIAL DEVELOPMENT ROSSER, MANITOBA SHEET TITLE: OPTION 3: SITE PLAN PRELIMINARY SITE PLAN 1 COMMISSION NUMBER: SHEET NUMBER: 1.0 1.0 SCALE: N.T.S. 1925 A1.1 E-FILE: 1925 - A1.1 - SITE PLAN.DWG BUILDING SPECIFICATIONS 123'-0" X 660'-0" BALLASTED 60 MIL. EPDM ROOF WITH PRE-FINISHED METAL R30 INSULATION AND 10 MIL VAPOUR PARAPET FLASHING. BARRIER ON STEEL STRUCTURE. 3" INSULATED METAL WALL PANEL 3" INSULATED METAL WALL PANEL (R22) WITH STEEL STRUCTURE. (R22) WITH STEEL STRUCTURE. 12' HIGH 10" PRECAST CONCRETE INSULATED WALL PANEL (R23.6). 28'-0" CLEAR MINIMUM 9'-0" X 10'-0" OVERHEAD DOORS WITH VIEW WINDOWS. 30'-0" X 50'-0" BAYS, TYP. 7" CONCRETE SLAB WITH 10 MIL VAPOUR BARRIER ON RECESSED LOADING DOCK COMPACTED GRANULAR FILL LEVELER. CONCRETE SIDEWALK CONCRETE FOUNDATION CONCRETE LOADING APRON AT-GRADE LOADING RAMP WITH 16'-0" X 14'-0" OVERHEAD DOORS WITH VIEW WINDOWS Contractor Concord Projects Ltd. Square Footage (+/-) 80,190 sf (Phase I) Dimensions (+/-) 120’-11” Deep x 658’-6” Wide Acres (+/-) 17 Acres (Total Site) Slab 7” Thick Slab on Grade,Troweled Finish with Sawcuts and Sealer Column Spacing (+/-) 50’ x 120’ Spans 10” Thick Insulated Precast Concrete Wall Panels for First 12’ High on the Rear Walls Loading Walls, 3” Thick Insulated Metal Wall Panels for the Balance of the Walls (R22) 13 - 9’ x 10’ Dock Doors with 13 - 35,000 Lb. Capacity Automatic Hydraulic Loading Doors Electrically-Operated Dock Levelers 13 - 14’ x 16’ Drive-in Doors with Concrete Ramps - Electrically-Operated Parking Spaces 129 Auto (Phase I) Electrical TBD Ceiling Height 28’ Clear to Underside of Roof Joists Sprinkler Type ESFR System Roofing System Loose-Laid EPDM with Ballast (R30) Ventilation Fans/Louvers TBD LOCATION MAP 3 7 4 5 6 8 STEELE BUSINESS 2 PARK 1 Winnipeg Richardson International Brookside Industrial Park Brookside Business Park 1 Airport & Airport Campus 4 West Phase III 6 • FedEx Freight • Air Canada Cargo • Canada West Limited • SMS Equipment • Cargo Jet • Groupe Touchette • The Rosedale Group • FedEx • Freightliner Manitoba • Trans X • Purolator • National Research Council’s • United Rentals • Standard Aero Advaned Manufacturing Facility • UPS 7 BrookPort Business Park 5 Brookside Industrial Park West • Merit Functional Food Corporation 2 Future Residential Development • Fort Garry Fire Trucks • Maxim Truck & Trailer 8 Red River College 3 CentrePort Canada Rail Park • Pacific Coast Express • Payne Transportation • Trailer Wizards PERIMETER HIGHWAY A RAPIDLY-DEVELOPING TRANSPORTATION HUB • Tri-modal inland port situated Sold in the heart of the continent in Winnipeg, Manitoba Conditionally Chief Peguis Sold • 20,000 acres of prime Extension Paterson Inland industrial land Terminal BrookPort Business • Foreign Trade Zone Park 90 ROUTE CN RAIL STEELELINE BUSINESS Sold PARK advantages Brookside Recreation/ Business • Dedicated planning resource Open Space Park General Industrial to expedite the planning and Logistics Park land development approval Player’s Golf Course Sold CP RAIL LINE Imperial process Seed Sold • Affordable skilled labour force Sold CentrePort Brookside Industrial Brookside Phase III in close proximity Canada Industrial PERIMETER HIGHWAY Rail Park Sold Park West • Renewable, reliable, low-cost Manufacturing & Strategic energy Logistics Industrial Development CentrePort CENTREPORT CANADA WAY North Sold • Situated one hour north of the Municipal CentrePort Canada-US border Boundary South • $174 million of development Sold and building permits issued Service- Recreation/ Open Space Oriented to date since 2019 (750,000+ Industrial sf of industrial space under Winnipeg construction) Business James Armstrong Richardson Park International Airport • Major trucking centre with Air CentrePort 1000+ for-hire trucking Canada Way Serviced Extension to Residential Industrial companies Bypass Headingley • $1 billion in supporting highway CP RAIL LINE SASKATCHEWAN AVENUE Aerospace infrastructure and Air Cargo Murray Industrial Campus Park “Development activity at CentrePort over the last year has skyrocketed, with the value of building permits issued increasing 1000% over 2018 values. With planning complete and strategic infrastructure in place, we are seeing an incredible response from the market, including for the first time ever, significant development on spec.” – Diane Gray, President & CEO, CentrePort Canada Inc. DEMOGRAPHICS Stephen Sherlock Murray Goodman Vice President Executive Vice President T 204 928 5011 T 204 928 5009 C 204 799 5526 C 204 990 4800 [email protected] [email protected] Cushman & Wakefield | Stevenson 200 - 55 Donald Street Winnipeg, Manitoba R3C 1L8 T 204 928 5000 www.cwstevenson.ca Independently Owned and Operated / A Member of the Cushman & Wakefield Alliance ©2020 Cushman & Wakefield.
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages7 Page
-
File Size-