Electric Vehicles – Country Update from Ireland

Electric Vehicles – Country Update from Ireland

Electric Vehicles – Country Update from Ireland Graham Brennan Transport Programme Manager IA-HEV Task 1 Information Exchange 30th April 2015 Gwangju Overview • Progress in Ireland – Introduction to Ireland – Cars – Infrastructure • Technology Perspective Energy Infrastructure of Ireland • 4.7GW peak elect demand 250-500MW DC to Scotland – 2GW of wind Corrib Gas Gas Field – Gas, Coal, Peat £ Connections • Energy Imports 89% to Scotland • RE potential >> 100% AC Inter- • Single Electricity System connectors 500MW DC operator to Wales – Very supportive of EVs € – Faster decisions and consistent approach • (No car industry) Design Study for 700MW DC to France Rep. of Ireland v Rep. of Korea • Republic of Ireland – 4.7GW – 4.5m people – 2m cars – Electrical Energy (2012) • 18.2% Renewables • Republic of Korea – 80.5GW – 51m people – 19m cars – Electrical Energy (2012) • 1.8% Renewables Source: IEA 2012 Country Statistics EV Registrations in Ireland - 850 EVs in Total (Ireland has 2m Passenger Cars) 900 x3? 800 700 600 500 x2? 400 x5 300 200 EV Registrations Per Annum Per EV Registrations 100 0 2011 2012 2013 2014 2015 Cars Registered per Manufacturer 600 500 400 300 200 100 0 Public Charging Infrastructure • Ireland – AC Charge Points (22kW) = 820 – Fast Chargers (Chademo with some Combo) = 69 • Northern Ireland – AC Charge Points (22kW) = 320 – Fast Chargers (Chademo) = 14 • EU TEN-T (First EU Country) – 50% Funding for Chargers on main interurban routes & modal hubs Charge Point Management & Billing System • RFID Card • Roaming – Republic of Ireland & Northern Ireland – Two roaming models under review • Mobi.Europe • GeM (Green eMotion) • Remote Operation of Charge Points – Remote control of point – Data gathering • Telecoms based on Global M2M • 24 Hour Call Centre EV Roadmap Ireland 2050 80% Car Stock 60% Growth 40% RES-T % RE 20% in Transport 0% CO2 -20% Reduction -40% % Change wrt 2011 % Change Fossil Fuel -60% Import -80% Reduction 2010 2020 2030 2040 2050 Year Technology Perspective Battery Energy Density 1000 900 Today Future 800 Hour/kg 700 - 600 500 Tesla S Nissan 400 Leaf 300 200 Energy Density Watt Density Energy 100 0 Lead Lithium Lithium Lithium Lithium Lithium Lithium Li-Silicon Ion Ion Ion Ion Sulphur Sulphur Nano Indicative Battery Cell Life Cycle to approximately 80% Storage Capacity 3000 A123 Claimed >7,000 @ 100% DOD 2500 2000 Leaf 1500 1000 Tesla S Number of Cycles 500 @ 100% DOD 0 Second Life...Large Scale Storage? • 24hr of future Winter Demand • 4GW x 24 hr = 1.3m EVs • = 50% of 2030 passenger fleet • EU requirements in place for minimum Gas and Oil reserves • Should a future requirement for electricity storage be considered? 76m • Vehicle EOL and Battery Waste Directives Thank You Graham Brennan Sustainable Transport Programme Manager t + 353 1 8082025 f + 353 1 8082002 e [email protected] w www.seai.ie .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    14 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us