Under the Multiple Framework Services Contract for Impact Assessments and Evaluations TREN/A2/143-2007 Lot 1

Under the Multiple Framework Services Contract for Impact Assessments and Evaluations TREN/A2/143-2007 Lot 1

European Commission Directorate-General for Transport and Energy Under the Multiple Framework Services Contract for Impact Assessments and Evaluations TREN/A2/143-2007 Lot 1 The revision of the trans-European energy network policy (TEN- E)TREN/A2/143-2007/SI2.544824 Appendices 21October2010 Cambridge Econometrics Covent Garden Cambridge CB1 2HT Tel +44 1223 533100 Fax +44 1223 533101 Email [email protected] Web www.camecon.com The Revision of the Trans-European Energy Network Policy (TEN-E): Final Report Revision and Authorisation History Version Date Authorised for Description release by 5.0 21/10/10 Sudhir Junankar Appendices to final report – revised with final date of submission. 4.0 25/08/10 Rachel Beaven Appendices to final report – revised to address comments made by Commission. 3.0 12/08/10 Sudhir Junankar Appendices to revised Draft Final Report 2.0 31/03/10 Sudhir Junankar Appendices to Revised interim report submitted in response to changes requested by the client (letter of 2/03/10 sent to COWI) 1.0 12/02/10 SJ Version submitted ii The Revision of the Trans-European Energy Network Policy (TEN-E): Final Report Contents Page 1 Appendix I: New Power Transmission Projects 1 2 Appendix II: Size of Power Transmissions Equipment 29 3 Appendix III: TradeWind Study Results 30 4 Appendix IV: TEN-E Projects Eligible for Grants 33 5 Appendix V: Literature Review of Electricity Infrastructure Requirements 37 6 Appendix VI: Data & Calculations for Appendix V 63 7 Appendix VII: Background Data to Chapter 4 64 8 Appendix VIII: Chapter 4 Tables Expressed in Mtoe 112 9 Appendix IX: E3ME and KEMA Model Descriptions 116 iii The Revision of the Trans-European Energy Network Policy (TEN-E): Final Report 1 Appendix I: New Power Transmission Projects Co Countries Project Description Status Expected Comments de Date 50 France - Moulaine (FR) – Creation of a Permitting 2010 Region: Central Luxembour Beval (LX) line 225 kV West g TSO in charge: RTE & SOTEL Project driver: consumer connection Source: UCTE 3 France - Moulaine (FR) – Upgrade of Permitting 2010 Region: Central Belgium Aubange (BE) the existing West 225 kV line Project driver: Moulaine congestion (FR) – remediation Aubange (BE) Scope: Installation of a 2nd circuit and replacement of conductors Studies are being carried out Project driver: Congestion on the 225 kV line between the Lorraine area (FR) and Belgium TSOs in charge: RTE & ELIA Source: UCTE 52 Netherlands BritNed HVDC New HVDC Under 2012 Region: Central – United link link between construction West Kingdom (Isle of Grain, Project driver: Kent) and the Security of Supply Netherlands Scope: enhancing (Maasvlakte), diversity and Transmission security of supply capacity for both markets: 1320 MW, open access for all length 260 market parties by km. explicit auction and market coupling; increase of interconnection capacity 1 The Revision of the Trans-European Energy Network Policy (TEN-E): Final Report TSOs in charge: TenneT TSO and National Grid Source: UCTE 53 Luxembour New New 220 kV Design & 2012 Region: Central g - Belgium interconnector in underground permitting West the southern cable between Project driver: section of the substations of security of supply LU grid Bascharage for the public grid (LU) and Scope: - Aubange (BE) TSOs in charge: Cegedel Net & Elia Source: UCTE 17 Netherlands Line 60 km new Planned Earliest Region: Central - German Doetinchem double circuit 2013 West (NL) – 400 kV OHL Project driver: Niederrhein Congestion in the (DE) area around German – Dutch border during peak hours and wind in- feed Scope: - TSOs in charge: TenneT & RWE TSO 3 France - Interconnection Strengthening Under 2012-2015 Region: Central Belgium France - of present consideratio West Belgium interconnectio n (study in Project driver: n or new progress) constraints appear interconnectio on the France – n project Belgium border due to development in generation in Northern France TSOs in charge: RTE & ELIA Source: UCTE 35 Germany - NORD.LINK HVDC Under >2015 Region: Central Norway transmission consideratio West system 700 – n (feasibility Project Driver: 1400 MW study coupling the hydro- performed dominated by Statnett Norwegian and electricity system EON.Netz) and the wind and thermal dominated electricity system in the northern 2 The Revision of the Trans-European Energy Network Policy (TEN-E): Final Report Germany Scope: first Norway-Germany interconnector Source: UCTE 54 Belgium – Belgium – HVDC link Under study To be Region: Central United United Kingdom with determined West Kingdom Interconnector National Project driver: Grid creating trading capacities by coupling the Belgian grid (ELIA) and the British grid (NG) Scope : establishing a direct power exchange capacity TSOs in charge: ELIA & National grid Source: UCTE 55 Germany - Investigation of New Under To be Region: Central Belgium grid extension interconnectio consideratio determined West options n between the n Project Driver: 400 kV ELIA establish a direct nd RWE TSO exchange capacity grids on the TSOs in charge: central ELIA & RWE Western TSO European Source: UCTE market 7 Germany - Esdorf (DE) – Identification Under To be Region: Central France St. Avold (FR) of possibilities consideratio determined West line to improve the n Project driver: Ensdorf (DE) increase the power – St. Avold exchange capacity (FR) on the DE-FR interconnectio border n TSOs in charge: RWTE & RWE TSO Source: UCTE 56 Netherlands Cobra project HVDC link Under 2016 Region: Central - Danemark Capacity 600- consideratio West 700 MW in n Project driver: both Market coupling directions Denmark – Total length Netherlands 3 The Revision of the Trans-European Energy Network Policy (TEN-E): Final Report of about 350 Scope: To allow km exchange and integration of wind energy and increase value of renewable energy into the Dutch and Danish Power systems and to increase security of supply TSOs in charge: TenneT TSO and Energinet.dk Source: UCTE 6 Germany - Strengthening Under study Under To be Region: Central Denmark AC consideratio determined West interconnections n Project driver: Strengthening AV interconnections Scope: identification of possibilities to increase capacity on AC interconnections TSOs in charge: E.ON Netz & Energinet.dk Source: UCTE 5 CzechRepu Hradec (CZ) – New 400 kV Under First Region: Central blic - Vernerov (CZ) – double circuit consideratio planning is East Germany Vitkov (CZ) – overhead n due on 2016 Project driver: Mechlenreu interconnectio increasing the n line through current power th (DE) two 400 kV exchange capacity substations between the CzechRepublic and Germany Scope: interconnector between Germany and the CzechRepublic TSOs in charge (to be confirmed): CEPS, E.ON Netz & VE-T. Source: UCTE 4 The Revision of the Trans-European Energy Network Policy (TEN-E): Final Report 5 CzechRepu Increase of Possible new Under After 2016 Region: Central blic- interconnection overhead line consideratio East Germany capacity on the (new route) or n Project driver: Czech – German reinforcement Increasing the (n-1) border of expositing security and OHL Hradec interconnection (CZ) – capacity on the Röhsdorf border (DE) Scope: maintain the security of supply and support the Central Eastern Europe Market development TSOs in charge: VE Transmission and CEPS Source: UCTE 4 Austria - Increasing the New 380 kV Under 2017 Region: Central Germany current power double circuit consideratio East exchange line St. Peter n Project driver: capacity between (AT) – increasing the Austria and Isar/Pleinting current power Germany (DE) exchange capacity Scope: Interconnector Austria-Germany TSOs in charge: E.ON Netz & APG Source: UCTE 24 Hungary - Increasing power OVH 400 kV Joint After 2014 Region: Central double lines Slovakia exchange negotiations East (3 options) capacity on are in Project drivers: Hungary – progress · Improve the security and Slovakia border reliability of the network of both partners · Increase transmission capacity in the North-South direction Scope: one of the following options: 1. Sajoivank a (HU) - Rimavska Sobota (SK) 400 kV double line or 2. Vleke Kapusany (SK)- Hungary 400 kV double line (this 5 The Revision of the Trans-European Energy Network Policy (TEN-E): Final Report project replaces interconnection Moldava (SK) ) - Sajoivanka (HU) or 3. Sajoivank a (SK) - Gabcikovo (HU) 400 kV double line TSOs in charge: MAVIR & SEPS Source: UCTE 19 Poland - Increasing the Upgrading of Planned Before 2013 Region: Central Germany power exchange transmissions Financing East capacity through lines Krajnik scheme not Project driver: the upgrading of (PL) – yet decided increase of the existing cross Vierranden security and border (DE) interconnection interconnection (including capacity on PL-DE lines PST border installation in Scope: Krajnik (PL) Conversion of the and Mikulowa existing 220kV (PL) double circuit line into a 400 kV line together with phase Shifting transformers installation on 400 kV lines: Krajnik (PL) –Vierranden (DE- and Mikulowa (PL) – Hagenwerder (DE).The project will decrease the loop flow from DE to PL and to CZ/SK, stimulate the market development and prepare for the RES integration TSOs in charge: VE T (DE) and PSE Operator (PL) Source: UCTE 19 Poland - Increasing power Construction Under After 2015 Region: Central Germany exchange of the third consideratio East capacity across 400 kV n Project driver: the Poland – interconnectio Financing Possible effect of 6 The Revision of the Trans-European Energy Network Policy (TEN-E): Final Report Germany border n line between scheme

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    135 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us