Orlando Stadium Client City of Johannesburg Location Soweto, Johannesburg, South Africa Completion Date November 2008

Orlando Stadium Client City of Johannesburg Location Soweto, Johannesburg, South Africa Completion Date November 2008

application report Project Orlando Stadium Client City of Johannesburg Location Soweto, Johannesburg, South Africa Completion Date November 2008 Project Overview Orlando stadium, which will be used as a training venue for the 2010 FIFA World Cup, is being turned into a multipurpose facility for soccer, rugby, gatherings and concerts. It will have about 120 suites and conference facilities. Contract investment 280 million ZAR Capacity 40,000 Jobs created 2,205 Technology Used BEKA’s Stadium Controller (with WAGO’s 0750-0841 Industrial Ethernet Controller and Remote I/O) was designed to control and protect the stadium’s flood lights through a selection of four scenes. These scenes differed in the application of the pitch (from practice through to televised international games). Flood lights get switched on in sequence which allows the stadium to keep a low maximum energy demand and lights with the lowest usage time will be switched on first, helping save overall flood light life time. With power outages, the controller allows the flood lights to cool down before they can be switched on again, which protects and extends the flood light’s life time. About Us Shorrock Automation (1975) is a South African company and is, along with Industrial Automation, very involved in the fields of Building Automation and Installation. Shorrock represents German based company WAGO, who offer a wide range of solutions across all market sectors. WAGO is, with their vast product offering, one of the leading international, and especially European, Building Automation solution providers, and definitely the market leader in the field of high speed and totally secure electrical Building Installation. Shorrock Automation Pretoria www.shorrock.co.za Durban [email protected] Cape Town 0861 SHORROCK (746776) Port Elizabeth building automation & panel building .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    2 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us