Project Document (Prodoc) Template and Guidelines – Version 02, May 5, 2016 for INTERNAL USE ONLY - PLEASE DO NOT DISTRIBUTE

Project Document (Prodoc) Template and Guidelines – Version 02, May 5, 2016 for INTERNAL USE ONLY - PLEASE DO NOT DISTRIBUTE

CI-GEF PROJECT AGENCY GEF Project Document Securing the long-term conservation of Timor-Leste’s biodiversity and ecosystem services through the establishment of a functioning National Protected Area System and the improvement of natural resource management in priority catchment corridors (“TLSNAP”) Timor-Leste / Asia and the Pacific December 05, 2017 PROJECT INFORMATION PROJECT TITLE: Securing the long-term conservation of Timor-Leste’s biodiversity and ecosystem services through the establishment of a functioning National Protected Area System and the improvement of natural resource management in priority catchment corridors PROJECT OBJECTIVE: To establish Timor-Leste’s National Protected Area System and improve the management of forest ecosystems in priority catchment corridors PROJECT OUTCOMES: Outcome 1.1: National Protected Area system established and implementation initiated Outcome 2.1: Land degradation drivers halted and/or minimized in key catchment areas Outcome 2.2: Capacity for communities to manage their natural resources substantially increased Outcome 3.1: Sustainable forest management in priority catchment corridors substantially improved Outcome 3.2: Priority degraded areas reforested COUNTRY(IES): Timor-Leste GEF ID: 9434 GEF AGENCY(IES): Conservation International CI CONTRACT ID: OTHER EXECUTING PARTNERS: Ministry of Agriculture and Fisheries DURATION IN MONTHS: 48 (MAF) Ministry of Commerce, Industry and Environment (MCIE) Conservation International Timor-Leste GEF FOCAL AREA(S): Multi-focal Area START DATE (mm/yyyy): 01/2018 INTEGRATED APPROACH PILOT: N/A END DATE (mm/yyyy): 12/2021 NAME OF PARENT PROGRAM: N/A PRODOC SUBMISSION DATE: December 05, 2017 RE-SUBMISSION DATE(S): N/A FUNDING SOURCE AMOUNT (USD) GEF PROJECT FUNDING: 3,340,367 PPG FUNDING: 100,000 TOTAL GEF GRANT: 3,440,367 CO-FINANCING 1: CONSERVATION INTERNATIONAL 350,000 CO-FINANCING 2: MINISTRY OF AGRICULTURAL AND FISHERIES 4,000,000 CO-FINANCING 3: MINISTRY OF COMMERCE, INDUSTRY AND ENVIRONMENT 4,000,000 CO-FINANCING 4: JAPAN INTERNATIONAL COOPERATION AGENCY (JICA) 3,942,000 TOTAL CO-FINANCING: 12,292,000 TOTAL PROJECT COST: 15,732,367 TABLE OF CONTENTS TABLE OF APPENDICES ...................................................................................................................... iii GLOSSARY OF TERMS ........................................................................................................................ vi SECTION 1: PROJECT SUMMARY .........................................................................................................1 SECTION 2: PROJECT CONTEXT ...........................................................................................................4 A. Geographic Scope .................................................................................................................. 4 B. Environmental Context and Global Significance ............................................................................... 6 C. Socio-Economic and Cultural Context ............................................................................................. 12 D. Global Environmental Problems and Root Causes .......................................................................... 16 E. Barriers to Addressing the Environmental Problems and Root Causes .......................................... 20 F. Current Baseline (Business-as-Usual Scenario) / Future Scenarios without the Project ................ 23 G. Alternatives to the Business-as-Usual Scenario .............................................................................. 25 H. Cost Effectiveness Analysis of Chosen Alternative ......................................................................... 26 SECTION 3: PROJECT STRATEGY ........................................................................................................ 28 A. Objective, Components, Expected Outcomes, Targets, and Outputs ............................................. 28 B. Associated Baseline Projects ........................................................................................................... 55 C. Incremental Cost Reasoning............................................................................................................ 59 D. Global Environmental Benefits ....................................................................................................... 60 E. Socio-Economic Benefits ................................................................................................................ 62 F. Risk Assessment and Mitigation...................................................................................................... 65 G. Sustainability ................................................................................................................ 68 H. Innovativeness ................................................................................................................................ 70 I. Replicability and Potential for Scaling Up ....................................................................................... 71 J. Consistency with National Priorities, Plans, Policies and Legal Frameworks .................................. 72 K. Consistency with GEF Focal Area and/or Fund(s) Strategies .......................................................... 76 L. Linkages with other GEF Projects and Relevant Initiatives ............................................................. 78 M. Consistency and Alignment with CI Institutional Priorities ............................................................. 80 N. Communications and Knowledge Management ............................................................................. 81 O. Lessons Learned During the PPG Phase and from other Relevant GEF Projects ............................ 83 SECTION 4: COMPLIANCE WITH CI-GEF PROJECT AGENCY’S ENVIRONMENTAL AND SOCIAL MANAGEMENT FRAMEWORK (ESMF) ............................................................................................... 85 A. Safeguards Screening Results and Categorization .......................................................................... 85 B. Compliance with Safeguard Recommendations ............................................................................. 85 i CI-GEF Project Agency – Project Document (ProDoc) Template and Guidelines – Version 02, May 5, 2016 FOR INTERNAL USE ONLY - PLEASE DO NOT DISTRIBUTE SECTION 5: IMPLEMENTATION AND EXECUTION ARRANGEMENTS FOR PROJECT MANAGEMENT ....... 91 A. Execution Arrangements and Partners ........................................................................................... 91 B. Project Execution Organizational Chart .......................................................................................... 94 SECTION 6: MONITORING AND EVALUATION PLAN ........................................................................... 95 A. Monitoring and Evaluation Roles and Responsibilities ................................................................... 95 B. Monitoring and Evaluation Components and Activities ................................................................. 95 SECTION 7: PROJECT BUDGET AND FINANCING ................................................................................. 99 A. Overall Project Budget ................................................................................................................ 99 B. Overall Project Co-financing .......................................................................................................... 100 TABLE OF FIGURES Table 1: List of five Globally Threatened bird species identified in Timor-Leste Table 2: Socioeconomic information on the 10 project sucos Table 3: Forest cover and deforestation statistics from 2000 to 2014 Table 4: Estimated business as usual scenario CO2 emissions Table 5: Forest and land rehabilitation and reforestation summary Table 6: Enabling approvals required over the course of project implementation Table 7: Associated baseline projects Table 8: Contributions towards achieving the Aichi targets in Timor-Leste Table 9: Contributions towards achieving Sustainable Development Goal No. 15 in Timor-Leste Table 10: Risk assessment and Mitigation Planning Table 11: Consistency with National Priorities, Plans, and Policies Table 12: Consistency with GEF Focal Area Strategies Table 13: Other Relevant Projects and Initiatives Table 14: Planned workshops and awareness campaigns during project implementation Table 15: Safeguard Screening Results Table 16: Safeguard Categorization Table 17: M&E Plan Summary Table 18: Planned Project Budget by Component Table 19: Planned Project Budget by Year Table 20: Committed Cash and In-Kind Co-Financing (USD) Table VI-1: Socioeconomic information on the 10 project sucos Table VII-1: Stakeholder consultations during PPG phase Table VII-2: Project Stakeholder Engagement Matrix Table VII-3: Planned groups that will be formed or strengthened during project implementation Table VII-4: Planned workshops and awareness campaigns during project implementation ii CI-GEF Project Agency – Project Document (ProDoc) Template and Guidelines – Version 02, May 5, 2016 FOR INTERNAL USE ONLY - PLEASE DO NOT DISTRIBUTE Figure 1: Map of Timor-Leste Figure 2: Map showing locations of Comoro and Irabere catchments Figure 3: Map of the project area in the Comoro catchment Figure 4: Map of the project area in the Irabere catchment Figure 5: Historic and planned withdrawals from the Petroleum Fund Figure 6: Land use trends in Timor-Leste 1961-2014

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    184 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us