High Performance Concrete and Drilled Shaft Construction

High Performance Concrete and Drilled Shaft Construction

High Performance Concrete and Drilled Shaft Construction Dr. Dan Brown, P.E. Dr. Anton Schindler Auburn University A Proposal for High Performance Concrete • Similar concept as used for current high performance concrete, but • Performance characteristics for fresh concrete properties (rather than hardened) 1 Why? Workability and Passing Ability tremie rebar concrete Concrete with inadequate Concrete with good workability workability and filling ability 2 Congested Rebar Cage Exposure of Trapped Laittance Attributed to Inadequate Workability 3 Congested Rebar Cage SCC Mix 4 Conventional Concrete Workability Retention Fresh, fluid concrete Trapped Laittance Old, stiff concrete 5 600 Tremie Placement Loading Traveling Hopper # 1 500 Waiting Period 12:05 AM: tremie stuck, rigging failure resulted 12:30 AM: tremie re-rigged, pulled free. 400 12:35 AM: tremie over-flowed , pour stopped, cable up and down. 12:40 AM: flow resumed, but last 10CY in hopper would not come out, sprayed and wasted. 300 1:00 AM: new hopper, flow resumed. 5 hrs 34 min. 200 Concrete Volume (CY) Volume Concrete 100 0 PM PM AM 10:00 11:00 12:00 6:00 PM 6:00 PM 7:00 PM 8:00 PM 9:00 AM 1:00 AM 2:00 AM 3:00 AM 4:00 AM 5:00 AM 6:00 AM 7:00 Unit Weight (kN / cu. m) Anomaly – Probable Defect of Unknown Size Mean Minus 3 Standard Depth (m) Deviations Possible Contaminated Mean Concrete at Base of Shaft Near One Tube 6 Bleeding Bleeding Crack 7 Bleeding Cracks Bleeding 8 Temperature 14 T0 = Initial Temperature T0 = 90° F τ = 28.0 hrs 12 β = 1.50 αu = 0.850 ) 3 10 T0 = 80° F 8 6 T0 = 70° F 4 T0 = 50° F Generated Heat (W/cm Generated 2 0 0 10203040506070 Concrete Age (hours) High Performance Drilled Shaft Concrete • We need to define a “high performance concrete” based on fresh properties: o Workability o Passing ability (tight rebar cages) o Retarded set time o Avoid segregation & bleeding (need cohesive paste); will need fines & proper aggregate gradation o Control of hydration temperature 9 Strategies for Drilled Shaft Concrete Mix Design • Aggregates: o Use rounded gravel aggregates rather than crushed stone o Use No. 67 or 78 aggregate gradation rather than No. 57 o Use sand to total aggregate ratio in the range of 0.44 to 0.50 Strategies for Drilled Shaft Concrete Mix Design • Admixtures: o water reducing & hydration control admixtures o viscosity modifying admixtures (VMA) as needed to help control bleeding o fly ash and/or slag to increase cementitious content & reduce the portland cement content o Use 56 day or 90 day strength specifications with high dosage of fly ash or GGBF slag 10 Strategies for Drilled Shaft Concrete Mix Design • Temperature: o temperature affects admixture dosages! o use adiabatic or semi-adiabatic curing of specimens o Control the fresh concrete placement temperature to less than 80°F (75°F) o Utilize Type II cement + fly ash or slag to control heat of hydration & reduce DEF potential Strategies for Drilled Shaft Concrete Mix Design • Most Important: o Develop project-specific mix design o Fresh concrete performance requirements should be specific to application 11 Thanks for Listening! 12.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    12 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us