Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï ÏÏ ÏÏ Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï LochaberÏ Forest District Ï Ï Woodland management. Areas of more Ï Ï Sunart SAC : Is designated under the European Loch Sunart LMP advanced regeneration will be respaced PAWS: Through the continuation of a system Designated Areas : All the woodlands are Community Council Directive on the Conservation Ï to encourage a greater diversity of species of clearfell coupes all the woodlands within the within a designated area. Ï Ï Ï of Natural Habitats. The major habitats that are Ï and to remove any non-native conifer Sunart LMP area will gradually be transformed reason for selection are; 1. Sessile Oak woodlands regeneration. back to native woodland by natural regeneration Concept MapÏ - Sunart East from local seed sources. These areas will be with Holly and Ferns; 2. Otters. Ï Ï Ï monitored over a 5 year period and if necessary ÏÏ Sunart SSSI: This site is characterised Ï enrichment planting will take place. Ï Date: 12/03/2018 Ï by one of the most extensive areas of Ï Ï Ï Ï ancient semi-natural woodland in Britain. Ï Ï Ï Ï Ï Ï Ï It displays relatively intact transitions from Lochaber FD: Will work with SNH to ensure that Ï Ï Ï Ï marine to woodland habitats, a feature no these habitats are protected and where possible Scale: 1:25,000 Ï Ï Ï Ï longer common in this country. enhanced. Ï Ï ± Ï Ï Ï ÏÏ Ï Ï Ï Ï Ï Ï Ï LMP Boundary Ï k Ï ÏÏ Ï Ï k Water Supply Ï Ï Ï Ï Ï Ï Watercourse Ï k Ï ÏÏ ÏÏ Ï Ï Ï Ï ÏÏ ELEC_S_AND_S_OH_LINES Ï Ï Ï A861 Road Ï Ï Ï Ï Ï Ï Ï ÏÏ Ï Ï Ï Ï Ï B8007 Ardery: some enrichment with local Ï Ï Ï Ï Ï Ï seed sourced native trees will be Ï Ï Forest Roads required. Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Camus a Choirce: Potential for productive Ï Ï Planned Road Segments k Ï Ï Ï Ï broadleaf establishment using oak raised k Ï Ï ÏÏ Ï Ï Ï ÏÏ Ï from Sunart collected acorns. Ï Ï Ï Ï Ï AWS_2013 Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï ÏÏ Ï Ï Ï Ï SSSI Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï SAC Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï k Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï ÏÏÏ Ï Ï Ï Planning: It is important that forest operations are Ï Recreation: All existing recreational facilities will be Ï Ï Ï Ï Water: Forest Operations will be planned to Ï maintained - car parks, forest trail, wildlife hide. co-ordinated to avoid a conflict of interests. The Ï Ï Ï Ï Ï protect water supplies and water courses. Ï LMP will detail the expected work programme and Ï Ï Ï the timing of operations. These work programmes Ï Ï Ï Deer: Management is necessary to allow for will be reviewed at 5 year intervals to ensure targets ÏÏ the natural regeneration of native tree species are met. Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï ÏÏ Ï Ï Ï Ï ÏÏ Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï Ï.
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages1 Page
-
File Size-