Draft Transportation Baseline Report

Draft Transportation Baseline Report

Transportation Baseline Report Oak Street Refinement Plan Forest Grove, Oregon DRAFT August 2020 Draft Transportation Baseline Report Project Information Project: Oak Street Refinement Plan Prepared for: 3J Consulting 9600 SW Nimbus Avenue, Suite 100 Beaverton, Oregon 97008 Reviewing Agency Jurisdiction : Forest Grove 1924 Council Street Forest Grove, Oregon 97116 Project Representative Prepared by : SCJ Alliance 8730 Tallon Lane NE, Suite 200 Lacey, WA 98516 360.352.1465 scjalliance.com Contact : Anne Sylvester, PTE [email protected] (360) 352-1465 Project Reference: SCJ 1902 .01 Path: N:\Projects\1902 3J Consulting, Inc\1902.01 Forest Grove Oak Street Area Land Use Refinement\04-Dels\01-Baseline\Transp\2020-0808 Draft Oak Street Area Transp Baseline.docx Oak Street Refinement Plan Draft Transportation Baseline Report TABLE OF CONTENTS 1. INTRODUCTION AND BACKGROUND ........................................................................ 1-1 2. REVIEWED DOCUMENTS AND PLANS ....................................................................... 2-1 2.1 State Documents and Plans ................................................................................................ 2-1 2.2 Regional Documents and Plans .......................................................................................... 2-1 2.3 Forest Grove Documents and Plans ................................................................................... 2-2 2.4 Washington County Documents and Plans ........................................................................ 2-2 3. GOALS AND POLICIES ............................................................................................... 3-1 4. STREETS AND ROADS ............................................................................................... 4-1 4.1 Functional Classification of Streets .................................................................................... 4-1 4.2 Street Jurisdiction ............................................................................................................... 4-3 4.3 Roadway Design Characteristics ......................................................................................... 4-3 4.4 Existing Street Characteristics ............................................................................................ 4-6 4.5 Existing Traffic Volumes ..................................................................................................... 4-9 4.6 Existing Traffic Performance .............................................................................................. 4-9 4.7 Traffic Safety ..................................................................................................................... 4-11 5. BICYCLE AND PEDESTRIAN TRANSPORTATION SYSTEMS ........................................... 5-1 5.1 Existing Bicycle Facilities ..................................................................................................... 5-1 5.2 Existing Trails/Bikeways ..................................................................................................... 5-2 5.3 Planning Context ................................................................................................................ 5-2 5.4 Bicycle System Improvements............................................................................................ 5-5 5.5 Existing Pedestrian Facilities .............................................................................................. 5-5 5.6 Planning Context ................................................................................................................ 5-9 5.7 Pedestrian System Improvements ..................................................................................... 5-9 6. TRANSIT SYSTEM ..................................................................................................... 6-1 6.1 Introduction ........................................................................................................................ 6-1 6.2 Fixed Route Bus Service ...................................................................................................... 6-1 6.3 Ride Connection ................................................................................................................. 6-2 SCJ Alliance Page i August 2020 Oak Street Refinement Plan Draft Transportation Baseline Report 6.4 Planning Context ................................................................................................................ 6-3 7. FUTURE STREET AND ROADWAY SYSTEM................................................................. 7-1 7.1 Future (2040) Traffic Volumes ............................................................................................ 7-1 7.2 Future Traffic Performance ................................................................................................ 7-1 7.3 Street and Roadway Plan ................................................................................................... 7-3 8. RAIL FACILITIES ........................................................................................................ 8-1 APPENDICES A – Traffic Count Data B – 2020 PM Peak Hour Intersection Operations C – Crash Data D – Traffic Forecasts E – 2040 PM Peak Hour Intersection Operations SCJ Alliance Page ii August 2020 Oak Street Refinement Plan Draft Transportation Baseline Report LIST OF TABLES Table 4 -1. Major Street Network Classifications ................................ ................................ ....................... 4-2 Table 4-2. Functional Classification Definitions ......................................................................................... 4-2 Table 4-3. Roadway Jurisdictional Ownership ........................................................................................... 4-3 Table 4-4. Design Parameters for Major Study Area Streets ..................................................................... 4-4 Table 4-5. Green Street Design Elements .................................................................................................. 4-5 Table 4-6. Summary of Key Features for Existing Streets .......................................................................... 4-6 Table 4-7. Existing 2020 PM Peak Hour Intersection Level of Service ..................................................... 4-11 Table 4-8. Intersection Crashes in Vicinity of Oak Street Plan Area, 2014-2018 ..................................... 4-11 Table 4-9. Intersection Crashes by Severity, 2014-2018 .......................................................................... 4-12 Table 4-10. Summary of Roadway Crashes by Type, 2014-2018 ............................................................. 4-12 Table 4-11. Summary of Roadway Crashes by Severity, 2014-2018 ........................................................ 4-13 Table 4-12. Summary of Roadway Crashes by Severity, 2014-2018 ........................................................ 4-13 Table 5-1. Bicycle System Projects and Programs ..................................................................................... 5-5 Table 5-2. Pedestrian System Projects and Programs ............................................................................... 5-9 Table 6-1. Fixed Route Bus Service in Forest Grove................................................................................... 6-1 Table 7-1. Existing 2040 PM Peak Hour Intersection Level of Service ....................................................... 7-3 Table 7-2. Planned Roadway Improvements ............................................................................................. 7-4 LIST OF FIGURES Figure 1 -1. Oak Street Refinement Plan Study Area and Vicinity ................................ .......................... 1-2 Figure 4-1. Relationship between Functional Classification, Mobility and Access ................................ 4-1 Figure 4-2. Existing Traffic Volumes ..................................................................................................... 4-10 Figure 5-1. Existing Bicycle Facilities ...................................................................................................... 5-1 Figure 5-2. Tualatin Valley Scenic Bikeway ............................................................................................ 5-3 Figure 5-3. Forest Grove Bicycle Plan .................................................................................................... 5-4 Figure 5-4. Council Creek Trail Plan ....................................................................................................... 5-6 Figure 5-5. Council Creek Trail Design Elements.................................................................................... 5-7 Figure 5-6. Existing Sidewalks/Highway Shoulders ................................................................................ 5-8 Figure 5-7. Forest Grove Pedestrian Plan ............................................................................................ 5-11 Figure 6-1. GroveLink Route Map .......................................................................................................... 6-2 Figure 6-2. WestLink Route Map............................................................................................................ 6-3 Figure 7-1. 2040 PM Peak Hour Baseline Traffic Volumes ..................................................................... 7-2 Figure 7-2. OR 47 at Martin Road – Proposed Roundabout

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    132 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us