Annex 26 Capacity Restrictions Per Year 2020

Annex 26 Capacity Restrictions Per Year 2020

CFR NETWORK STATEMENT - 2021 ANNEX 26 CAPACITY RESTRICTIONS PER YEAR 2020 Validity: 13.12.2020 – 11.12.2021 Version: 10.3 Update: 07.06.2021 Compania Naţională de Căi Ferate “CFR” S.A. România Capacity restrictions for 2021 Percent/ Time Fit/ Section Distance Period Observation (days) Restriction category (conf. L 202/2016) A closed traffic wire, and on the wire remaining in 200 Branișca - Mintia 30.06.2021 - 25.10.2021 117 B (Z > 7 days; Y ≥ 30%) circulation speed restriction 30 km/h km 502 + 850 - 502 + 250 200 Branișca - Mintia 25.10.2021 - 25.10.2021 1 C (Z ≤ 7days; Y ≥ 50%) Total closure 200 Branișca - Mintia 25.10.2021 - 08.08.2022 287 B (Z > 7 days; Y ≥ 30%) A closed traffic light 200 Branisca - Ilia 08.09.2021 – 08.08.2022 334 B (Z > 7 days; Y ≥ 30%) A closed traffic light A closed traffic wire, and on the wire remaining in 200 Branisca - Ilia 07.01.2020 – 08.09.2021 610 B (Z > 7 days; Y ≥ 30%) circulation speed restriction 30 km/h km 502 + 850 - 502 + 250 200 Ilia - Gurasada 05.08.2020 - 08.09.2021 399 B (Z > 7 days; Y ≥ 30%) A closed traffic light Total closure. It runs on the 200 Ilia - Gurasada 19.05.2021 - 28.07.2022 435 A (Z ≥ 30 days; Y≥ 50%) RV 30km/h route between km 508 + 900-508 + 950 200 Gurasada - Campuri 08.09.2021 - 08.09.2021 1 C (Z ≤ 7days; Y ≥ 50%) Total closure Total closure. It is 216 Ilia - Dobra 08.09.2021 – 28.07.2022 323 A (Z ≥ 30 days; Y≥ 50%) circulating on the new route variant 216 Ilia – Dobra 03.06.2021 – 17.06.2021 14 B (Z > 7 days; Y ≥ 30%) Total closure A closed traffic wire, and on 200 Gurasada - Ilteu 11.03.2020 – 14.03.2022 734 B (Z > 7 days; Y ≥ 30%) the remaining wire the maximum speed is 50 km/h A closed traffic wire, and on 200 Ilteu - Săvârșin 06.02.2019 – 21.04.2021 805 B (Z > 7 days; Y ≥ 30%) the remaining wire the maximum speed is 50 km/h A closed traffic wire, and on 200 Ilteu – Săvârșin 21.04.2021 – 10.06.2022 415 B (Z > 7 days; Y ≥ 30%) the remaining wire the maximum speed is 50 km/h A closed traffic wire, and on 200 Varadia - Batuta 27.02.2019 - 22.06.2023 1576 B (Z > 7 days; Y ≥ 30%) the remaining wire the maximum speed is 50 km/h A closed traffic wire, and on 200 Barzava - Barzava Noua 19.06.2019 - 22.06.2023 1464 B (Z > 7 days; Y ≥ 30%) the remaining wire the maximum speed is 50 km/h A closed traffic wire, and on 200 Savarsin - Varadia 29.03.2018 - 19.08.2021 1239 B (Z > 7 days; Y ≥ 30%) the remaining wire the maximum speed is 50 km/h A closed traffic wire, and on 200 Savarsin - Varadia 19.08.2021 - 10.06.2022 295 B (Z > 7 days; Y ≥ 30%) the remaining wire the maximum speed is 50 km/h 200 Deva – Mintia 22.06.2019 – 30.03.2023 1377 B (Z > 7 days; Y ≥ 30%) A closed traffic light A closed traffic wire, and on 200 Bârzava – Conop 25.09.2017 –14.06.2022 1723 B (Z > 7 days; Y ≥ 30%) the remaining wire the maximum speed is 50 km/h A closed traffic wire, and on 200 Conop – Milova 01.03.2019 – 14.06.2022 1201 B (Z > 7 days; Y ≥ 30%) the remaining wire the maximum speed is 50 km/h 27 CFR Network Statement - 2021 ANNEX 26 Version: 10.3 Update: 07.06.2021 Pag: 2 / 27 Compania Naţională de Căi Ferate “CFR” S.A. România Percent/ Time Fit/ Section Distance Period Observation (days) Restriction category (conf. L 202/2016) 200 Conop – Radna 29.06.2021 – 05.07.2021 6 C (Z ≤ 7days; Y ≥ 50%) Total closure 200 Simeria – Deva 23.04.2020 – 30.03.2023 1071 B (Z > 7 days; Y ≥ 30%) A closed traffic light 200 Simeria – Deva 01.10.2021 – 01.10.2021 1 C (Z ≤ 7days; Y ≥ 50%) Total closure A closed traffic wire, and on 200 Radna - Păuliș 30.09.2020 – 10.11.2021 406 B (Z > 7 days; Y ≥ 30%) the remaining wire the maximum speed is 50 km/h 200 Radna – Ghioroc 04.11.2021 – 10.112021 6 C (Z ≤ 7days; Y ≥ 50%) Total closure A closed traffic wire, and on 200 Milova - Radna 06.03.2018 – 05.07.2021 1217 B (Z > 7 days; Y ≥ 30%) the remaining wire the maximum speed is 50 km/h A closed traffic wire, and on 200 Milova - Radna 05.07.2021 – 08.03.2023 611 B (Z > 7 days; Y ≥ 30%) the remaining wire the maximum speed is 50 km/h Dissolution of the connection between the Bartolomeu line 205 Brașov - Bartolomeu 04.06.2021 – 04.06.2021 1 C (Z ≤ 7days; Y ≥ 50%) and the II Stupini - Brașov line Line 214 between Simeria - Bârcea Mică closed. It runs 214 Simeria – Bârcea Mică 22.07.2018 – 01.10.2021 1167 A (Z ≥ 30 days; Y≥ 50%) on line 213 Simeria - Bârcea Mică A closed traffic wire, and on 300 Apața - Augustin 15.04.2021 – 15.04.2022 365 B (Z > 7 days; Y ≥ 30%) the remaining wire the maximum speed is 50 km/h A closed traffic wire, and on 300 Rupea – Cața 01.06.2021 – 01.06.2022 365 B (Z > 7 days; Y ≥ 30%) the remaining wire the maximum speed is 50 km/h A closed traffic wire, and on 300 Braşov - Stupini 01.09.2020 – 20.07.2021 322 B (Z > 7 days; Y ≥ 30%) the remaining wire the maximum speed is 50 km/h A closed traffic wire, and on 300 Braşov - Stupini 21.07.2021 – 15.02.2022 209 B (Z > 7 days; Y ≥ 30%) the remaining wire the maximum speed is 50 km/h 01.09.2020 – 20.07.2021 1022 B (Z > 7 days; Y ≥ 30%) A closed traffic wire, and on the remaining wire the maximum speed is 50 km/h 300 Stupini - Bod C (Z ≤ 7days; Y ≥ 50%) Total closure 15.07.2021 – 20.07.2021 6 A closed traffic wire, and on 300 Stupini - Bod 21.07.2021 – 04.11.2022 477 B (Z > 7 days; Y ≥ 30%) the remaining wire the maximum speed is 50 km/h A closed traffic wire, and on 300 Feldioara-Apata 21.07.2021 – 15.02.2022 209 B (Z > 7 days; Y ≥ 30%) the remaining wire the maximum speed is 50 km/h A closed traffic wire, and on 300 Mureni-Vanatori 24.11.2021 – 30.11.2021 7 D (Z ≤ 7days; Y ≥ 10%) the remaining wire the maximum speed is 50 km/h 300 Vanatori-Albesti 16.04.2021 – 30.11.2021 228 B (Z > 7 days; Y ≥ 30%) A closed traffic light A closed traffic wire, and on 300 Vânători - Albești 01.12.2021 – 07.08.2022 250 B (Z > 7 days; Y ≥ 30%) the remaining wire the maximum speed is 50 km/h B (Z > 7 days; Y ≥ 30%) 16.04.2021 – 30.11.2021 228 A closed traffic wire, and on the remaining wire the 300 Albești - Sighișoara maximum speed is 50 km/h A (Z ≥ 30 days; Y ≥ 30.10.2021 – 30.11.2021 31 Total closure 50%) 27 CFR Network Statement - 2021 ANNEX 26 Version: 10.3 Update: 07.06.2021 Pag: 3 / 27 Compania Naţională de Căi Ferate “CFR” S.A. România Percent/ Time Fit/ Section Distance Period Observation (days) Restriction category (conf. L 202/2016) A closed traffic wire, and on 01.12.2021 – 07.08.2022 249 B (Z > 7 days; Y ≥ 30%) the remaining wire the maximum speed is 50 km/h 300 Albești - Sighișoara 08.08.2022 – 09.11.2022 94 B (Z > 7 days; Y ≥ 30%) A closed traffic wire, and on the remaining wire the maximum speed is 50 km / h Modernization of level crossings. During the 328 Ciumeghi - Salonta 01.03.2021 - 31.12.2021 305 C (Z ≤ 7days; Y ≥ 50%) mentioned interval there will be 2 days of total closure Modernization of level crossings. During the 333 Salonta - Kotegyan 01.03.2021 - 31.12.2021 305 C (Z ≤ 7days; Y ≥ 50%) mentioned interval there will be 2 days of total closure Modernization of level crossings. During the 400 Şilindru - Valea lui Mihai 01.04.2021 - 31.12.2021 273 C (Z ≤ 7days; Y ≥ 50%) mentioned interval there will be 2 days of total closure Modernization of level crossings. During the 400 Halmeu - Diacovo 01.03.2021 - 31.12.2021 304 C (Z ≤ 7days; Y ≥ 50%) mentioned interval there will be 2 days of total closure Modernization of level Botiz - Medieşul Aurit crossings. During the 401 01.04.2021 - 31.12.2021 273 C (Z ≤ 7days; Y ≥ 50%) Botiz - Livada mentioned interval there will be 2 days of total closure Modernization of level crossings. During the 401 Buşag - Baia Mare 01.05.2021 - 31.12.2021 244 C (Z ≤ 7days; Y ≥ 50%) mentioned interval there will be 2 days of total closure Modernization of level crossings. During the 404 Săcuieni Bihor - Marghita 01.05.2021 - 31.12.2021 244 C (Z ≤ 7days; Y ≥ 50%) mentioned interval there will be 2 days of total closure Modernization of level crossings. During the 404 Marghita- Suplacu de Barcău 01.05.2021 - 31.12.2021 244 C (Z ≤ 7days; Y ≥ 50%) mentioned interval there will be 2 days of total closure Modernization of level Suplacu de Barcău - Şimleul crossings.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    27 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us