Signal and Telecommunication Department

Signal and Telecommunication Department

SIGNAL AND TELECOMMUNICATION DEPARTMENT: Sl. NO. OF INSPECTIONS AND ITEM TO BE INSPECTED No. i) Station Inspection (Signal, Point, Track and Documentation) ii) Gate Inspection (Station Section, Mid Section Interlocked, Manned Non- Interlocked) iii) Stores Inspection of Signal/Telecom depot iv) Zonal Training School-Refresher/Initial Training v) Surprise Inspection vi) Foot Plate Inspection (Signal Visibility) vii) Any other item assigned by Superior. RRI/Panel/EI installations, Block Instruments, IPS, Battery Rooms, Data logger, BPAC : Sl. No. DETAILS i) Check Panel Operation. ii) Relay Rooms details. iii) Emergency counters. iv) Signal Failures. v) Disconnection/Reconnection. vi) Safety compliance of last inspections. Note : One should be between 00:0 hrs to 4:00 hrs and one during day - at least a stretch of 100 km. INSPECTION GUIDELINES - for S & T Installations SAFETY CHECKS LIST 1. Relay Room / Cabin Basement / Block Instrument key Observations (a) Relay Room key is not taken more than once in a month for schedule maintenance & supervisor takes it. (b) Switch on Relay Room Door is as per standard arrangement & spurious logging is not there. (c) Cross check relay room register with data logger records and mechanical counters / S&T control record - No. of times key taken and duration shall match. (d) Key for Construction work is taken as per the programme agreed by Sr. DSTE. (e) Construction staff has given memo of the work done for each occasion of key taken. (f) Block Instrument key is not taken or instrument opened when it is on TOL / Line Clear position. Check timing from TSR. (g) Double locks at all the places are effective and it is not possible to open without proper key. Try with all available keys with S&T staff. (h) Check for duplicate keys in ESM / MSM duties room, tool box / bag. (i) ESM / MSM duty room key is with ESM and Section SI only (j) Relay Room key of S&T lock remains in custody of ESM of Station / Section. (k) Exceptional report from data loggers to be checked if provided for - point failure, signal failure and delay in signal going to ON after occupation of controlling TC. (l) All relay are properly sealed with screw fully tightened and an impression on seal is proper. (m) Spare relays are kept sealed in Relay Room. (n) Date Loggers / modem or its reset is shifted outside, wherever feasible (o) Panel, lever frame, SM frame, Block testing / overhauling is not due. (p) In Relay Room loop or extra wire are not kept. 2. Signal Failure Register - (a) Signal Failure Memo is issued for each failure recorded in SFR. (b) Each memo issued by SM is acknowledged. (c) Put right time & cause of failure are entered properly by SM & S&T staff respectively. (d) Signal failure, which could have been attended from outside but relay room key taken. (e) Trains passed on signal during signal failure. (f) Train passed on signal when relay room key was taken during signal failure. (g) Total trains passed during failures as per TSR & SFR & T/369(36) B actually issued. (h) T/369(36)B cancelled during signal failure & otherwise. 1. Disconnection Memo - a) Total Nos. and adequacy of duration for the type of work done. b) No. of trains passed on signal during disconnection. c) Cross check the functioning of the disconnected gear with data loggers report and the work, if any done after reconnection. d) Reconnection of Construction work on existing gear is after testing by open line. a) All Supervisors & Maintainers are aware of the activities to be done with and without disconnection. 4. Counters- a) Checks all the counters are in working conditions and increment by one only. b) RRBU cancellations are done after receipt of memo from SM & all memos kept serially numbered in guard file. c) EBPU operation during TC failure - corresponds with SFR record. d) ERRB cancellations are not too many & analysis of it. e) Proper procedure of Axle Counter / MUX resetting is followed. 5. Joint inspection of Panel & Crossing and TC - a) Quarterly schedule is followed. b) Deficiencies are not carried forward. c) Major deficiencies yet to be attended like worn out tongue rail, stock rail, machine sleepers, out of square, missing stock bolts and loose packing. d) Availability of pad & liner, condition of sleeper. e) Drainage system. 6. Material availability - a) Critical stores for regular maintenance. b) Torches & Cells. c) Tools and measuring instruments. d) Cotton waste, signal bulbs, lubricating & gear oil. 7. SSE’s Depot- a) Safety meetings are scheduled every month and all staff attended. b) Signal lamp lasting arrangements for 3 hours. c) Material shortage, stock / non-stock items and storage system. d) Staff grievances. e) Competency certificate cum training history book is with each maintainer as issued by SBI school. f) Staff categorized as A, B, C category and 6 monthly reviews done. g) Staff is not due for refresher course. 8. Station Staff- a) Competency of operation is available. b) Setting of point against stabled/stationery load. c) Prescribed practice is followed for treating a point/signal defective till a written advice for its rectification from S&T staff is given. d) Point is inspected by SM after its failure. 9. SWR/SWRD- a) SWR matches with SP. b) SP matches with the last work commissioned. c) Counseling of station staff is done for the late update of SWR. 10. Drivers lobby- a) Signal defects are attended and the remarks are put in b) Repeated cases of defects reported. RELIABILITY CHECK: 1. Maintenance- a) Maintenance by ESM is regular & record kept in SMC and site book. b) Sectional SI's inspections are regular & record kept. c) Quarterly inspections by SSE and monitoring system by him to ensure quarterly inspection. d) P-6 Schedule by SSE and corresponding disconnection memo of adequate duration. 2. Points- a) Point motors are opened for regular maintenance & not kept sealed throughout the year except monsoon. b) Epoxy coating of motors & detector assembly in flood prone area is done. c) Ground connections are fitted as per standard drawing d) Wear & Tear on machine slides looseness on pins in ground connections. e) Motor current under obstruction & normal. f) Friction clutch strips under obstruction. g) WJR timing for "N" & "R" h) Wards on point motor correspond with the KLR. i) Cleanliness of carbon brush & availability of chamois leather. 3. Track Circuit- a) Track circuit parameters are within limit. b) Relay are not overdue for overhauling. c) Track circuit history card are maintained every six months. d) Track circuit batteries are positively wired in circuit. e) Track circuit in flood prone areas and improvement needed like axle counter in parallel. f) Testing of GJ/IBJ and replacement of IBJ is done as per schedule & procedure followed during replacement. g) OHE bands are available on FP/SEJ & track crossing is insulated. 4. Signal- a) Lamp voltages are not than 11.2V. b) MECR functions are checked regularly as per schedule. c) Cases of repeated lamp fusing of a signal of particular 5. Lever lock & circuit controller - a) Proper adjustment of bands & make in proper position. b) Serrations are holding bands and nut/split pin are intact. c) Lock is effective and releases at the required position. 6. Power equipment, batteries & fuses - a) Battery conditions and year of installation, plan for replacement. b) Battery maintenance SG & voltage. c) Load capacity. d) Redundant fuses are removed. e) Charger failure & alarm for TC batteries & other. 7. BPAC & AXLE Counters - a) Co-operative reset is effective & for point zone it is from site. b) Resetting of axle counter - analysis, repeated resets and cause thereof. c) Channels voltages are in limit. d) Resetting of Mux and analysis of it. e) Quad cable is terminated on M6 terminals - plan for removing 8-way. f) Availability of spares, card, field units & measuring instruments. g) Checking system of spares, put for one work in service. h) Storage of spare cards. i) Axle Counters/MUX are provided with better earth through resistance improvement compound. 8. Panel- a) Panel testing is as per schedule of 3 years. b) Record of panel testing is kept at site, check the LT/ST on which testing done and signed by testing official. c) Date of testing is painted on panel. d) Cable from relay room to panel is in protected pipe. e) RRBU lock is not free. 9. Cable Testing- a) Cable Testing as per maintenance schedule. b) System of monitoring cable testing as per schedule. c) Availability of left over spares in existing cables. d) Age & insulation value left. e) Need for replacement of defective cable & quantity. f) Tail cables of all electrical gears are tested as per schedule. 10. Signal Failures - a) Repeated failure of a gear. b) Repeated & causes. c) Broad analysis and input needed for improvement. 11. Documents- a) Completion documents are available at site. b) Modifications, if any done, each as per approved circuit & approved diagrams for that are available. c) All documents as per list are available. Annexure-I Check List for different Register: 1. Joint Points & Crossing Register i) Quarterly schedule is followed by SSE/JE (Signal) & SSE/JE(P-Way) ii) Deficiencies are not carried forward iii) Compliance being done & recorded iv) Major deficiencies yet to be attended like worn out tongue rail, stock rail, Machine sleepers out of square, missing stock bolts and loose packing, Defective glued joint & damage of insulation under clit bolt over bridge portion track circuit area v) Availability of pad & liner, condition of sleeper vi) Drainage vii) Engineering and S&T Officers are checking register while on inspection. viii) Whether summary of inspection is recorded in the summary column properly.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    17 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us