Brief Summary of Project

Brief Summary of Project

BRIEF SUMMARY OF PROJECT Î Project Title : INTEGRATED 36000 TPA HIGH TITANIUM SLAG, 20000 TPA PIG IRON, 30000 TPA TITANIUM DIOXIDE PIGMENT PLANT Î Owner : SARAF AGENCIES PVT LTD Î Project Location : Chhatrapur, Dist. Ganjam, Odisha - Nearest Rail Station : Chhatrapur (5 Km) - Nearest Highway NH-16 (0.6 Km) - Nearest Town : Chhatrapur (4 Km) - Nearest Port : Paradeep : 260 Km. Vizag : 250 Km. Gopalpur Port –under construction (12 Km) - Nearest Airport : Bhubaneswar : 150 Km. - Survey of India Map : 74 A/15 & 74 E/3 Î Capacity of Plant : 36000 TPA Titanium Slag, 20000 TPA Pig Iron, 30000 TPA Titanium Dioxide (both Anatase & Rutile Grade) Î Technology Source/know- : CHINA how for Titanium Project : HPWY (CHINA) for Titanium Slag Plant : Chong Qung Chemical Engineering Design and Research Institute (CCDRI) will supply Process Technology, Basic & Detailed Engineering for Titanium Dioxide Plant. Î Market : Domestic Demand of Pigment: Around 2,00,000 TPA : Present production level : 50,000-60,000TPA : Short fall : Around 1,50,000 TPA Î Land Requirement : 39 Acres required for Titanium Slag plant, 30 Acres for Titanium Dioxide plant, within the existing land of 260 Acres Page 1 of 3 Î Water Requirement : Around 7,700 M3/day [800 M3/day for Titanium slag plant from ground water. 6900 M3/day for Titanium Dioxide plant] Water shall be sourced from Rushikulya River. Î Power Requirement : Around 23MVA [16MVA for slag plant, 7 MVA for dioxide] Î Man Power Requirement : Total 946 [356 for Ti Slag 590 for TiO2] Î Total Cost : Rs. 779.5 Crore Î Debt : Equity Ratio : 2:1 - Debt : Rs. 518.57 Crore (from Banks / Financial Institutions including L/C Facility for import of Machineries ) - Equity : Rs. 260.93 Crore Î Interest Rate : 14% Î Tenure (Term loan) : 12 months moratorium : 84 monthly installments after moratorium period Î Working Capital : Around Rs 106.38 Crore cash. Credit facility against raw material, finished goods, spare parts etc. & outstanding dues from customers. : Around Rs. 72.19 Crore Bank guarantee / L.C facility for import of consumables. Î Financial Results : - IRR : 22.64% - Break even point : 60.41% - Cash Break even point : 50.27% Î Project Completion Time : 24 months Page 2 of 3 Î Present Status : SARAF has peaceful possession of 260 acre land in Chhatrapur in Ganjam District. : SARAF has SEZ approval for setting up Titanium Complex manufacturing various titanium products. : SARAF has already applied for statutory clearances / approvals from Pollution Control Board and environment department. : SARAF has obtained approval for supply of water and power. : High Titanium Slag will be used as feedstock for Pigment Plant. Î Special Highlight of the : Eco friendly Plant Project : Waste Acid treatment facility Comprising both concentration and gypsum conversion facilities (to be used in Cement factory) : SARAF will manufacture Zirconium coated TiO2 Pigment for first time in India. Page 3 of 3 .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    3 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us