GOVERNMENT OF TELANGANA RURAL WATER SUPPLY AND SANITATION DEPARTMENT APPENDEX (See Rule 6) t< FORM-'A' Form for seeking prior approval under section 2 of the proposals by the state Government and other authorities. PART-l (TO BE FILLED BY USER AGENCY) 1. Project Details : TELANGANADRINKING WATER SUPPLY PROJECT for Laying Pipe line and Construction of the Other Structures for Providing safe Drinking Water in Manakondur,Huzurabad,Husnabad,Peddapally, Ramagundam,Choppadandi Constituencies of Karimnagar and Parkal in Warangal District - Segments 16" (East Division) i) Short narrative of the Proposal for Project : The Government of Telangana has decided to improve the drinking water Supply level to all the habitations in the new State to Provide safe Drinking Water to all in the State. To avoid Quantitative and Qualitative problems it is proposed to supply surface water from LMD and Ellampally in Manthani(M) in Karimnagar District. The Raw Water and Treated Water Pipe lines are to be laid to cover in the Segment - 16 in the all habitations in the Manakondur,Huzurabad,Husnabad, Peddapally,Ramagundam,Choppada ndy Constituencies in Karimnagar and Parkal in Warangal Constituencies. The proposed Pipe line alignment is passing through the Reserve Forest for which Forest Land Diversion is required to complete the Telangana Drinking Water Project for Karimnagar District covering above Constituencies. ii) Map showing the required forest land Map showing the reserve forest and Boundary of adjoining Forest on a 1 in boundary is enclosed. 50,000 Scale topo map. The land is meant for Laying Pipe line And Construction of the Other Structures For Providing safe Drinking Water in Manakondur,Huzurabad,Husnabad, Peddapally,Ramagundam,Choppadandi Constituencies of of Karimnagar and Parka! Constituencies in Waranga! District _ Segment No _ 16. iii) Cost of the Project. Rs. 2848.00 Crores. iv) Justification for location the project The proposed Pipe lines of Telangana Drinking in forest area Water Project have no other alternative routes to cover all the habitations. And the proposed Structures in the Forest Area are essential to cover the habitations in the Karimnagar & Warangal Districts. As per the Hydraulic Designs and Topography of the Area the proposed locations are very much essential and there is no other alternative alignment. Not applicable, as there is no other alternate to v) Cost benefit analysis compare the cost. (to be enclosed) vi) Employment likely to be Mandays generated 2. Purpose wise breakup of the After working out various options in total Land required Extent execution of the Pipe Line Works in the forest Land, the diversion of forest land to the minimum requirement is worked out. The details of the land requirement are here with enclosed for more clarity. The purpose wise land requirement for 1. Pipe lines - 2.4333 Hect. 2. For Structures - 0.6875 Hect. 3.For Head Works- 0.8000 Hect. 4.For Ghat Roads- 1.2000 Hect. Total - 5.1208 Hect. 2 East Division 1. Pipe lines - 0.9038 Hect. 2. For Structures - 0.3200 Hect. 3. For Ghat Roads - 0.6000 Hect 4.For Head works- 0.8000 Hect. -----".--------- Total - 2.6238 Hect 3. Details of displacement of people due to the project if any: i) Number of families ii) Number of Schedule Caste / Schedule Tribal families. iii) Rehabilitation Plan 4. Where Clearance under Environment (Protection) Act, 1986 Required? (Yes/No) No 5. Undertaking to bear the cost of rising and maintenance of compensatory Afforestation and lor penal ompensatory Enclosed afforestation as well as cost are protection and regeneration of Safety zone., etc., as perthe Scheme prepared by the state Government (under taking to be enclosed). 6. Details of Certificates / Documents Enclosed as required Enclosed under the instructions. M Superintending Engineer, TDWSP,Circle,Karimnagar "Counter Signed", Chief Engin~WSp, v~ Hyderabad 3 GOVERNMENT OF TELANGANA RURAL WATER SUPPLY AND SANITATION DEPARTMENT '- APPENDEX (See Rule 6) FORM-'A' Form for seeking prior approval under section 2 of the proposals by the state Government and other authorities. PART-l (TO BE FILLED BY USER AGENCY) 1. Project Details : TELANGANA DRINKING WATER SUPPLY PROJECT for Laying Pipe line and Construction of the Other Structures for Providing safe Drinking Water in Manakondur,Huzurabad,Husnabad,Peddapally, Ramagundam,Choppadandi Constituencies of Karimnagar and Parkal in Warangal District - Segments 16" (West Division) i) Short narrative of the Proposal for Project : The Government of Telangana has decided to improve the drinking water Supply level to all the habitations in the new State to Provide safe Drinking Water to all in the State. To avoid Quantitative and Qualitative problems it is proposed to supply surface water from LMD and Ellampally in Manthani(M) in Karimnagar District. The Raw Water and Treated Water Pipe lines are to be laid to cover in the Segment - 16 in the all habitations in the Mana kondu r, Huzu rabad, Husna bad, Peddapally,Ramagundam,Choppada ndy Constituencies in Karimnagar and Parkal in Warangal Constituencies. The proposed Pipe line alignment is passing through the Reserve Forest for which Forest Land Diversion is required to 1 complete the Telangana Drinking Water Project for Karimnagar '---' District covering above Constituencies. ii) Map showing the required forest land Map showing the reserve forest and Boundary of adjoining Forest on a 1 in boundary is enclosed. 50,000 Scale topo map. The land is meant for Laying Pipe line And Construction of the Other Structures For Providing safe Drinking Water in Manakondur,Huzurabad,Husnabad, Peddapally,Ramagundam,Choppadandi Constituencies of of Karimnagar and Parkal Constituencies in Warangal District _ Segment No _16. iii) Cost of the Project. Rs. 2848.00 Crores. iv) Justification for location the project The proposed Pipe lines of Telangana Drinking in forest area Water Project have no other alternative routes to cover all the habitations. And the proposed Structures in the Forest Area are essential to cover the habitations in the Karimnagar & Warangal Districts. As per the Hydraulic Designs and Topography of the Area the proposed locations are very much essential and there is no other alternative alignment. Not applicable, as there is no other alternate to v) Cost benefit analysis compare the cost. (to be enclosed) vi) Employment likely to be Mandays generated 2. Purpose wise breakup of the After working out various options in total Land required Extent execution of the Pipe Line Works in the forest Land, the diversion of forest land to the minimum requirement is worked out. The details of the land requirement are here with enclosed for more clarity. The purpose wise land requirement for 1. Pipe lines - 2.4333 Hect. 2. For Structures - 0.6875 Hect. 3.For Head Works- 0.8000 Hect. 4.For Ghat Roads- 1.2000 Hect. Total - 5.1208 Hect. 2 West Division 1. Pipe lines - 1.5295 Hect. 2. For Structures - 0.3675 Hect. 3. For Ghat Roads - 0.6000 Hect --------------- Total - 2.4970 Hect 3. Details of displacement of people due to the project if any: i) Number of families ii) Number of Schedule Caste / Schedule Tribal families. iii) Rehabilitation Plan 4. Where Clearance under Environment (Protection) Act, 1986 Required? (Yesl No) No 5. Undertaking to bear the cost of rising and maintenance of compensatory Afforestation and lor penal ompensatory Enclosed afforestation as well as cost are protection and regeneration of Safety zone., etc., as perthe Scheme prepared by the state Government (under taking to be enclosed). 6. Details of Certificates I Documents Enclosed as required Enclosed under the instructions. #f- Superintending Engineer, TDWSP,Circle,Karimnagar "Counter Signed", Chief Engin~, v~ Hyderabad 3.
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages6 Page
-
File Size-