Department of Energy Royal Government of Bhutan

Department of Energy Royal Government of Bhutan

Department of Energy Royal Government of Bhutan Dagachhu Hydropower Project Environmental Assessment (EA) Report July 2006 Section I - Main Report Bhutan Consultants & Research (BHUCORE) Consultants in Engineering, Natural Resources and Environmental Management Changlam Plaza, Room No 56, Chang Lam, P.O. Box 955 Thimphu, Bhutan Telephone: +975 1760 - 1111, Fax: +975 2 326594 E-Mail: [email protected], [email protected] Table of Content ACRONYMS................................................................................................................................................................I BHUTANESE TERMS..............................................................................................................................................II EXECUTIVE SUMMARY...................................................................................................................................... III 1 INTRODUCTION............................................................................................................................................... 2 1.1 PROJECT BACKGROUND ................................................................................................................................. 2 1.2 PROJECT DESCRIPTION................................................................................................................................... 2 1.2.1 Objectives of the Project .............................................................................................................................. 2 1.2.2 Location of Project....................................................................................................................................... 2 1.2.3 General Layout of Project Facilities............................................................................................................ 2 1.2.4 Main project Data........................................................................................................................................ 3 1.2.5 Study of Alternatives .................................................................................................................................... 6 1.2.5.1 Project Selection Alternatives.............................................................................................................................6 1.2.5.2 Site Selection Alternatives..................................................................................................................................8 1.2.5.3 Technological Alternatives.................................................................................................................................8 1.2.5.4 Do Nothing Alternatives...................................................................................................................................10 1.2.6 Access Roads.............................................................................................................................................. 10 1.2.7 Power Transmission Line........................................................................................................................... 10 1.2.8 Quarry Sites ............................................................................................................................................... 10 1.2.9 Staffing and Support System for Construction and Operation ................................................................... 10 1.2.10 Project Cost and Funding Agency............................................................................................................ 11 1.2.11 Implementation plan and Schedule .......................................................................................................... 13 1.3 SCOPE OF EA ............................................................................................................................................... 13 1.4 METHODOLOGY ........................................................................................................................................... 14 1.4.1 Literature Review....................................................................................................................................... 14 1.4.2 Preparation of Working Map ..................................................................................................................... 14 1.4.3 Data Collection through Structured Questionnaires ................................................................................. 15 1.4.4 Public Consultation.................................................................................................................................... 15 1.4.5 Data Collection through Structured Format.............................................................................................. 15 1.4.6 Equipment Used ......................................................................................................................................... 15 1.4.7 Analysis ...................................................................................................................................................... 15 1.5 EA REPORT STRUCTURE.............................................................................................................................. 17 2 REVIEW OF POLICY, LEGAL AND INSTITUTIONAL FRAMEWORK.............................................. 19 2.1 REVIEW OF POLICY FRAMEWORK ................................................................................................................ 19 2.1.1 Overview of Policy Framework related to Hydropower ............................................................................ 19 2.1.2 Bhutan 2020 ............................................................................................................................................... 20 2.1.3 Water Resources Management Plan 2003 ................................................................................................. 20 2.1.4 Hydropower Master Plan (updated) 2003 ................................................................................................. 20 2.1.5 The Environmental Strategy 1998.............................................................................................................. 20 2.2 REVIEW OF LEGAL FRAMEWORK ................................................................................................................. 20 2.2.1 Overview of Legal System in Bhutan.......................................................................................................... 20 2.2.2 EA Act 2000 ............................................................................................................................................... 20 2.2.3 Forest and Nature Conservation Act 1995................................................................................................. 21 2.2.4 Mines and Minerals Act 1995 .................................................................................................................... 22 2.2.5 Bhutan Electricity Act 2003 ....................................................................................................................... 22 2.2.6 Land Act 1979 ............................................................................................................................................ 22 2.2.7 Road Act 2004............................................................................................................................................ 23 2.2.8 Rules and Regulation on Explosives .......................................................................................................... 23 2.2.9 Dzongkhag Yargay Tshogchung Chatrims and Geog Yargay Tshogchung 2002...................................... 23 2.3 INSTITUTIONAL FRAMEWORK ...................................................................................................................... 25 2.3.1 Overview of Government Structure in Bhutan ........................................................................................... 25 2.3.2 National Environment Commission............................................................................................................ 25 2.3.3 Department of Energy................................................................................................................................25 2.3.4 Department of Forest ................................................................................................................................. 25 2.3.5 Department of Geology and Mines ............................................................................................................ 25 2.3.6 Department of Roads.................................................................................................................................. 26 2.3.7 Bhutan Power Corporation........................................................................................................................ 26 2.3.8 Dagana Dzongkhag.................................................................................................................................... 27 3 BASELINE ENVIRONMENTAL INFORMATION & ANALYSIS ........................................................... 28 3.1 OVERVIEW OF ENVIRONMENTAL SETTING IN BHUTAN ................................................................................ 28 3.2 PHYSICAL ENVIRONMENT OF PROJECT SITE................................................................................................

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    113 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us