HYDROPOWER PROJECTS Under FIT SYSTEM (With Certificate of Confirmation of Commerciality) As of December 31, 2015

HYDROPOWER PROJECTS Under FIT SYSTEM (With Certificate of Confirmation of Commerciality) As of December 31, 2015

HYDROPOWER PROJECTS under FIT SYSTEM (with Certificate of Confirmation of Commerciality) as of December 31, 2015 APRROVED DECLARED START OF CITY / CONTRACT DATE OF PROJECT PROGRESS AS COMMISSIONING FIT REGION PROVINCE PROJECT NAME COMPANY NAME CAPACITY REMARKS COMMERCIAL MUNICIPALITY NO. CONVERSION PER WORKPLAN IN (%) DATE CAPACITY (MW) OPERATION (MW) Natalang B Pre-construction___% Aboitiz Power 2009-10- CAR Benguet Kabayan Hydroelectric Power 38 6/11/2015 Construction 0% Corporation 034 Project Interconnection 0% Kapangan Cordillera Hydro Pre-construction___% Kapangan & 2013-10- Groundbreaking held on Hydroelectric Power Electric Power 60 2/13/2014 Construction___% Kibungan 325 February 9, 2015 Project Corporation Interconnection___% • On Commercial Operation Sabangan Pre-construction 100% Hedcor Sabangan, 2012-04- • Issued Certifiacte of Sabangan Hydroelectric Power 14 8/28/2013 Construction 100% 6/2/2015 6/2/2015 14.0 Inc. 201 Endorsement (COE) under Project Interconnection 100% FIT on July 21, 2015. Pre-construction___% Abdao Hydroelectric AV Garcia Power 2009-10- Tabaan Sur, Tuba 2 9/25/2014 Construction 0% Power Project Systems Corp. 026 Interconnection 0% • On Commercial Pre-construction 100% Operation Irisan 1 Hydroelectric 2012-09- Tuba HEDCOR, Inc. 3.8 1/31/2014 Construction 100% • Issued Certifiacte of 4/30/2012 3.80 Power Plant 224 Interconnection 100% Endorsement (COE) under FIT on June 16, 2014. Pre-construction___% Ibulao Hydroelectric 2010-03- Ifugao Lagawe Hydrocore, Inc. 4.5 6/26/2013 Construction 0% Power Project 135 Interconnection 0% Pre-construction___% Tinoc 1 Hydroelectric Quadriver Energy 2010-03- Tinoc 4.1 8/9/2013 Construction 0% Power Project Corporation 143 Interconnection 0% Pre-construction___% Tinoc 2 Hydroelectric Quadriver Energy 2010-03- 11 1/6/2014 Construction 0% Power Project Corporation 144 Interconnection 0% Pre-construction___% Tinoc 3 Hydroelectric Quadriver Energy 2010-03- 8 1/6/2014 Construction 0% Power Project Corporation 145 Interconnection 0% Pre-construction___% Tinoc 4 Hydroelectric Philnew Hydro Power 2010-03- 5 8/9/2013 Construction 0% Power Project Corp 146 Interconnection 0% Tinoc 5 Hydroelectric Pre-construction___% Philnewriver Power 2011-12- Power Project (Lower 6.9 12/5/2014 Construction 0% Corp. 163 Luhong) Interconnection 0% Tinoc 6 Hydroelectric Pre-construction___% Philnewriver Power 2011-12- Power Project 8 12/19/2014 Construction 0% Corp. 164 (Wangwang) Interconnection 0% Pre-construction___% Biyao Hydroelectric Biyao Hydro Power 2014-03- Kalinga Balbalan 0.8 8/1/2014 Construction 0% Power Project Corporation 408 Interconnection 0% HYDROPOWER PROJECTS under FIT SYSTEM (with Certificate of Confirmation of Commerciality) as of December 31, 2015 APRROVED DECLARED START OF CITY / CONTRACT DATE OF PROJECT PROGRESS AS COMMISSIONING FIT REGION PROVINCE PROJECT NAME COMPANY NAME CAPACITY REMARKS COMMERCIAL MUNICIPALITY NO. CONVERSION PER WORKPLAN IN (%) DATE CAPACITY (MW) OPERATION (MW) Pre-construction___% Alilem Hydroelectric Philnewriver Power 2011-12- I Ilocos Sur Alilem 16.2 12/2/2014 Construction 0% Power Project Corp. 154 Interconnection 0% Pre-construction___% Quirino Hydroelectric Philnewriver Power 2011-12- Quirino 11.5 9/7/2015 Construction 0% Power Project Corp. 161 Interconnection 0% Pre-construction___% Danac Hydroelectric Philnewriver Power 2011-12- Sugpon 13.2 6/29/2015 Construction 0% Power Project Corp. 155 Interconnection 0% Pinacanauan River Pre-construction___% Sunwest Water & 2010-02- II Cagayan Peñablanca Hydroelectric Power 6 9/17/2013 Construction 0% Electric Company, Inc. 101 Project Interconnection 0% Pre-construction___% Ilaguen 2 Hydroelectric Isabela Power 2013-08- Isabela Dinapigue 14 5/22/2015 Construction 0% Power Project Corporation 272 Interconnection 0% Tumauini Hydroelectric Pre-construction___% Quadriver Energy 2010-03- Tumauini Power Project (Lower 7.8 10/15/2014 Construction 0% Corporation 148 Cascade) Interconnection 0% Tumauini Hydroelectric Pre-construction___% Philnew Hydro Power 2010-03- Power Project (Upper 14 10/15/2014 Construction 0% Corp 147 Cascade) Interconnection 0% Matuno 1 Pre-construction___% Nueva Smith Bell Mini-Hydro 2012-10- Ambaguio Hydroelectric Power 7.4 12/29/2015 Construction 0% Vizcaya Corp. 230 Project Interconnection 0% Matuno 2 Pre-construction___% Smith Bell Mini-Hydro 2012-10- Bambang Hydroelectric Power 7.9 12/29/2015 Construction 0% Corp. 231 Project Interconnection 0% Pre-construction___% Matuno Hydroelectric Epower Technologies 2010-03- 8 6/24/2015 Construction 0% Power Project Corp. 133 Interconnection 0% • On Commercial Commonal-Uddiawan Pre-construction 100% Operation Smith Bell Mini-Hydro 2010-02- Solano Hydroelectric Power 1.8 4/24/2014 Construction 100% • Issued Certificate of 12/26/2010 1.80 Corp. 060 Plant Interconnection 100% Endorsement (COE) under FIT on August 04, 2014. Pre-construction___% Dupinga Hydroelectric Constellation Energy 2010-02- III Nueva Ecija Gabaldon 3.4 6/26/2013 Construction 0% Power Project Corporation 074 Interconnection 0% (Laguio) Laginbayan Pre-construction___% Enervantage 2014-03- IV-A Quezon Mauban Malaki 2 Hydroelectric 3.1 10/9/2015 Construction___% Supplier's Co., Inc. 414 Power Project Interconnection__% HYDROPOWER PROJECTS under FIT SYSTEM (with Certificate of Confirmation of Commerciality) as of December 31, 2015 APRROVED DECLARED START OF CITY / CONTRACT DATE OF PROJECT PROGRESS AS COMMISSIONING FIT REGION PROVINCE PROJECT NAME COMPANY NAME CAPACITY REMARKS COMMERCIAL MUNICIPALITY NO. CONVERSION PER WORKPLAN IN (%) DATE CAPACITY (MW) OPERATION (MW) Lalawinan Repower Energy Pre-construction___% 2014-02- IV-A Quezon Real Hydroelectric Power Development 3 12/29/2015 Construction 0% 394 Project Corporation Interconnection 0% Laguio (Laginbayan) Pre-construction___% Enervantage 2014-12- Rizal (blank) Malaki 1 Hydroelectric 1.6 10/9/2015 Construction___% Supplier's Co., Inc. 538 Power Project Interconnection__% Pre-construction___% Majayjay Hydroelectric Majayjay Hydropower 2014-04- Groundbreaking held on Laguna Majayjay 2.2 10/10/2014 Construction 0% Power Project Company, Inc. 437 November 18, 2015 Interconnection 0% Barit (Irrigation Pre-construction___% NASCENT 2010-02- V Camarines Sur Buhi Discharge) 0.4 9/12/2014 Construction 0% Technologies Corp. 059 Hydroelectric Power Interconnection 0% Main Aklan River Pre-construction___% Sunwest Water & 2010-02- VI Aklan Libacao Hydroelectric Power 15 9/19/2013 Construction 0% Electric Company, Inc. 099 Project Interconnection 0% Sunwest Water & Pre-construction100% Villasiga Hydroelectric 2010-02- Antique Bugasong Electric Company, Inc. 8 10/10/2014 Construction & Power Project 086 2 Interconnection 99.07% Maninila (Lower Pre-construction___% Century Peak Energy 2009-10- San Remegio Cascade) Hydroelectric 4.5 10/2/2013 Construction 0% Corporation 016 Power Project Interconnection 0% Maninila (Upper Pre-construction___% Century Peak Energy 2009-10- Cascade) Hydroelectric 3.1 10/2/2013 Construction 0% Corporation 017 Power Project Interconnection 0% Sibalom (Upper Pre-construction___% Century Peak Energy 2009-10- Cascade) Hydroelectric 4.2 10/2/2013 Construction 0% Corporation 023 Power Project Interconnection 0% Sibalom (Middle Pre-construction___% Century Peak Energy 2009-10- Cascade) Hydroelectric 4 10/2/2013 Construction 0% Corporation 024 Power Project Interconnection 0% Sibalom (Lower Pre-construction___% Century Peak Energy 2009-10- Cascade) Hydroelectric 4 10/2/2013 Construction 0% Corporation 025 Power Project Interconnection 0% Pre-construction___% Caro-an Hydroelectric Antique Electric 2010-02- Sebaste 1 9/30/2015 Construction 0% Power Project Cooperative, Inc. 075 Interconnection 0% Pre-construction___% Ipayo Hydroelectric Antique Electric 2010-02- 0.84 10/2/2015 Construction___% Power Project Cooperative, Inc. 076 Interconnection__% Igbulo (Bais) Pre-construction 67.85% Century Peak Energy 2009-10- Iloilo Igbaras Hydroelectric Power 5.1 6/26/2013 Construction 16.9% Corporation 015 Project Interconnection___% Hilabangan (Upper Pre-construction___% Negros Century Peak Energy 2009-10- Kabankalan Cascade) Hydroelectric 4.8 8/28/2013 Construction 0% Occidental Corporation 011 Power Project Interconnection 0% HYDROPOWER PROJECTS under FIT SYSTEM (with Certificate of Confirmation of Commerciality) as of December 31, 2015 APRROVED DECLARED START OF CITY / CONTRACT DATE OF PROJECT PROGRESS AS COMMISSIONING FIT REGION PROVINCE PROJECT NAME COMPANY NAME CAPACITY REMARKS COMMERCIAL MUNICIPALITY NO. CONVERSION PER WORKPLAN IN (%) DATE CAPACITY (MW) OPERATION (MW) Hilabangan (Lower Pre-construction___% Negros Century Peak Energy 2009-10- VI Kabankalan Cascade) Hydroelectric 3 8/28/2013 Construction 0% Occidental Corporation 012 Power Project Interconnection 0% Pre-construction___% Malugo Hydroelectric Vivant-Malogo 2010-02- Silay 6 10/15/2014 Construction 0% Power Project Hydropower, Inc. 069 Interconnection 0% Pre-construction___% Loboc Hydroelectric Sta. Clara Power 2015-04- VII Bohol Loboc 1.2 6/3/2013 Construction 0% Power Plant Corporation 565 Interconnection 0% Amlan (Plant A) Natural Power Pre-construction___% Negros 2010-02- Amlan Hydroelectric Power Sources 3.2 9/25/2014 Construction 0% Oriental 128 Project Intergration,Inc. Interconnection 0% Amlan (Plant B) Natural Power Pre-construction___% 2010-02- Hydroelectric Power Sources 1.5 7/11/2014 Construction 0% 129 Project Intergration,Inc. Interconnection 0% Amlan (Plant C) Natural Power Pre-construction___% 2010-02- Hydroelectric Power Sources 0.8 9/25/2014

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    6 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us