Green Initiatives 1. 10 kWp Solar panels at ` 0.06 crore have been installed at Vikarabad Railway Station. 2. Revival of water Bodies with a cost of `0.035 crore has been completed towards Environmental/conservation measures. 3. LED lighting has been provided at all Railway Stations falling under the jurisdiction of Chevella Parliamentary constituency towards Environmental/ conservation measures. 4. 55 kWp Solar panels and 35 kWp Solar panels are installed at Tandur Station. Passenger Train Services Details of New Trains/ Special Trains/ Provision of Stoppages/ Extension/ Increase in the frequency of Trains in Chevella Parliamentary Constituency Jurisdiction. New Trains Chevella Parliamentary Constituency 1. Tr.No.19316/19315 Lingampalli – Indore – Lingampalli Humsafar Express Stoppages provided Shri Narendra Modi 1. Tr.No.17621/17622 Aurangabad–Renigunta–Aurangabad (Weekly) Express at Vikarabad & Tandur Hon’ble Prime Minister 2. Tr.No.17417/17418 Tirupati–Shirdi–Tirupati Weekly Express at Vikarabad, Tandur & Lingampalli 3.Tr.No.11308/11307 Hyderabad–Gulbarga–Hyderabad Intercity Express (Daily) at Tandur, Vikarabad & Lingampalli 4. Tr.No.18112/18111 Baiyyappanahalli (Bengaluru)–Tatanagar Weekly Express at Tandur ,Vikarabad & RAIL DEVELOPMENTAL WORKS Lingampalli 5. Tr.No.11019/11020 Mumbai–Bhubaneswar–Mumbai Konark Express at Lingampalli. Chevella Parliamentary Constituency Jurisdiction 6.Tr.No.17014/17013 Hyderabad–Pune–Hyderabad Tri-Weekly Express at Lingampalli Increase in Frequency 1. Tr.No.17319/17320 Hubli–Secunderabad–Hubli Tri-Weekly Express to Daily 2. Tr.No.16571/16572 Bidar–Yesvantpur–Bidar Tri-Weekly Express to Daily 3. Tr.No.12795/12796 Vijayawada – Lingampalli Express from 6 days a week to Daily South Central Railway 4. Tr.No.17010/17009 Secunderabad – Bidar Express from 6 days a week to Daily serving the entire state of Special Trains on Originating basis Telangana, major portion 1. Dharur to Hyderabad 2 special trains. of Andhra Pradesh and 2. Dharur to Bidar 2 special trains . considerable portion of SOUTH CENTRAL 3. Lingampalli to Secunderabad 8 special trains. Karnataka, Maharastra 4. Lingampalli to Kakinada 1 special train. states and small parts RAILWAY (Total 13 special Trains) of Tamilnadu and Extension of train services Madhya Pradesh. 1. Tr.No.12737/12738 Kakinada - Secunderabad Express is extended up to Lingampalli 2.Tr.No.12775/12776 Kakinada - Secunderabad Tri Weekly Express is extended up to Lingampalli Chevella Parliamentary 3. Tr.No.16583/16584 Yesvantpur – Bidar Express extended up to Latur Constituency falls under 4. Tr.No.12749/12750 Machilipatnam – Secunderabad Express extended up to Bidar Telangana State. Entire 5. Tr.No.11303/11304 Kolhapur – Hyderabad Express extended up to Manuguru Railway Network of 6. Tr.No.12795/12796 Vijayawada – Secunderabad Express extended up to Lingampalli this constituency 7. Tr.No.12733/12734 Tirupati – Secunderabad Express extended up to Lingampalli is being served by 8. Tr.No.12805/12806 Vishakhapatnam – Secunderabad Express extended up to Lingampalli South Central Railway. ASSEMBLY SEGMENTS Safety – The First Priority Safety is the priority on SCR, to ensure safety of the Rail users, Foot over Bridges (FoBs)/ Road under/overBridges are constructed / proposed for construction at various stations/ locations Maheswaram in Chevella Parliamentary Constituency Jurisdiction. ` Rajendranagar Two Foot Over Bridges are constructed at Lingampalli station with the cost of 3.20 crore and one more FoB is proposed with an estimated cost of ` 2.05 crore Serilingampally Chevella Road Over / Under Bridges Pargi W i t h a v i e w t o Road Over Bridges Road Under Bridge Vikarabad strengthen safety at Level 1. RoB in lieu of level crossing 1. Construction of RUB in lieu of LC Tandur Crossing gates and to No 20 in Secunderabad–Wadi No 15 (M) in Secundarabad–Wadi avoid untoward incidents section is completed at a Section at an estimated cost of a n d a l s o t o p r o v i d e Sanctioned Cost `30.40 `2.50 crore in progress seamless journey to road crore 2. Construction of Subway in lieu of traffic, the following Road 2. Proposed RoB in lieu of level LC No. 16 in Tandur – Vikarabad RAIL DEVELOPMENTAL WORKS u n d e r / o v e r B r i d g e s c r o s s i n g N o . 1 3 i n Section is completed Tandur–Mantatti Section at 3. Construction of RuB in lieu of LC Chevella Parliamentary Constituency Jurisdiction ( R u B / R o B ) a r e ` an estimated cost of 51.75 No. 17 in Vikarabad – Parli Section constructed / proposed for crore c o n s t r u c t i o n u n d e r is completed Infrastructural Development Chevella Parliamentary constituency. New Railway Lines Proposed for construction of new line for MMTS - Passenger Amenities Phase II project for a distance of 84 Kms with an Station Amenity Amount Status estimated cost of `817 crore 2.Electrification of Vikarabad–Parli Vaijnath Section Provision of Passenger Amenities and Shankarpalli Adarsh station ` 0.09 crore Developed Doubling of Railway Lines is proposed for a distance of 269Rkms at an estimated cost of `262.12 crore facilities, and its improvements at Lingampalli COP Replacement Proposed for doubling of Secunderabad– Railway Stations is one of the most & Extension ` 1.00 crore Completed Capacity enhancement Mahbubnagar section of distance of 85 kms with an important aspect Railway Services. Lingampalli 3 ATVMs estimated cost of `728.10 crore 1. New Crossing Station is proposed between Umdanagar Chandanagar 1 ATVM – Thimmapur stations at an estimated cost of `23.43 Hafeezpet 2 ATVMs Electrification of Railway Lines crore 1. Platform extension works are completed at Tandur 2 ATVMs ` 18 lakh Installed 1. Electrification of Manmad - Dhone Railway line for 2. New Crossing Station is proposed between Vikarabad – Matalkunta, Rukmapur, Kalgupur & Halbarga a distance of 868 Kms has been proposed with an Sadashivpet stations at an estimated cost ` 32.22 crore stations with the cost of `0.50 crore Vikarabad 2 ATVMs estimated cost of ` 1031 crore 2. Toilets construction is completed at Umdanagar 2 ATVMs Shankarpalli & Umdanagar stations with the Lingampalli CoVTVM ` 4.5 lakh Installed cost of `0.02 crore Lingampalli 2 Escalators ` 2.00 crore In Progress 3. Platform extension works are proposed at Vikarabad TIB/CIB replacement ` 1.03 crore Completed Gollaguda, Hi-Tech City, Lingampalli, Manthati Tandur TIB/CIB replacement ` 1.03 crore Completed and Vikarabad Stations at a cost of `9.0 crore Lingampalli Waiting Room ` 5 lakh In Progress Lingampalli 3 Lifts ` 1.5 crore In Progress Vikarabad 2 Lifts ` 1.0 crore In Progress Hafizpet 2 Lifts ` 1.0 crore In Progress Nagulapalli Adarsh Station ` 2.8 crore Developed 4 Stations Wi-Fi ` 6 lakh Provided.
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages2 Page
-
File Size-