01 | 2019 MAURER MAGAZINE MAURER || MAG SAY HI TO THE MUNICH SKY MAURER LOCATION New landmark for the INDIA Bavarian metropolis A daughter is growing up MAURER SIP®-ADAPTIVE Newest-generation Sliding Isolation Pendulum forces in motion Photo: New Acropolis Museum, Athens/Greece Museum, Acropolis New Photo: MAURER SIP®-Adaptive NEWEST GENERATION SLIDING ISOLATION PENDULUM Plan with maximum seismic protection: Reduced starting resistance, reduced structural acceleration, reduced wear: The 3-in-1-System of MAURER SIP®-Adaptive Sliding Isolation Pendulum protects vulnerable buildings such as hospitals, schools, research institutes, government buildings and museums even better – and longer. The isolator withstands 5 MCEs. MAURER SE | Frankfurter Ring 193 | 80807 Munich Phone +49.89.323 94-0 | Fax +49.89.323 94-306 | www.maurer.eu forces in motion Anz_SIP-Adaptive_A4_EN--ISOcV2.indd 1 18.03.19 10:35 Dear readers, We are the recognized market leader in the field of structural protection systems. We manufacture bridge bearings, roadway expansion joints, seismic protection devices, vibration dampers and monitoring systems. The crucial factor speaking in favor of MAURER SE: over 1,000 employees working for us worldwide. In this magazine, you will get to know some of them, their projects, their tasks and their professional passions. In face-to-face conversations they describe what particular challenges they have to face in their daily work and how these challenges can be mastered in cooperation with customers, partners and technicians on site. Maybe you have already worked together with one or another colleague or know about projects from his/her area of responsibility. MAURER MAG has been created to provide you – in this first edition and many more to follow – with an overview of and insights into the many facets of our work. With kind regards from Munich, Dr. Christian Braun Max Meincke MAURER MAGAZINE | 3 140 YEARS MAURER 6MAURER NEWS 10 OF MAURER 14 TIMELINE The MAURER MarCom team issues press 140-year anniversary – celebrated at The moving story from metal craftsman releases on interesting projects or new Frankfurter Ring in November 2016. Friedrich Maurer to today’s globally active products in regular intervals in cooperation MAURER SE. with in-house product experts. THE INTELLIGENT MAURER WE ARE 32 BRIDGE 36 LOCATION INDIA 38 MAURER Within the scope of the project “Digital A daughter is growing up: the location in Rosa Ripa // civil engineer: she checks Testbed Highway”, our engineers have Bhopal for the Indian subcontinent has MAURER products and adjusts them to created the technical basis for a more long since targeted the global market. performance parameters. Daniel Jaremko // efficient and more economical maintenance fitter: half the world is a construction site management for the bridge infrastructure. – and he is always on the spot. 4 | MAURER MAGAZINE MAURER || TOPICS SAY HI TO THE MAURER TRUST ONE IN 16 MUNICH SKY 20SIP®-ADAPTIVE 26 ITS THIRTIES In the Munich “Werksviertel”, the largest Latest-generation Sliding Isolation Pen- How to more than double the service life transportable obervation wheel in the world dulums. MAURER MAG talked to Hans of a bridge with the least possible effort. spins around inviting visitors to search for Distl and Felix Weber, the two developers the vastness in the heart of the city. in charge of this product. // IMPRINT Publisher: MAURER SE · Frankfurter Ring 193 80807 Munich · Germany www.maurer.eu Responsible for the content: MAURER SE, Judith Klein Design: 3 hoch K Werbeagentur AG Brecherspitzstr. 8 · 80807 Munich · Germany MAURER Editorial assistance: MAURER Georg Krause TRAINEES EVENT CALENDAR 40 42 Photos: MAURER SE not only trains young men In the coming months, we will attend the MAURER SE, High-Sky, Mi Kube, but also women in commercial-technical conferences shown here. Helmut Felser professions. © MAURER SE. Errors and modifications reserved. MAURER MAGAZINE | 5 56 HYDRAULIC DAMPERS FOR // THE BUTTERFLY TOWERS OF BUCHAREST MAURER plans and delivers hydraulic dampers for protection against earthquakes and wind. Bucharest. Bucharest is about a steel structure. This rather soft to get a huge butterfly: two slim and elastic type of construction office towers, the floor plan of in combination with the shape which resembles a butterfly. The (BEHF Architects, Vienna) brings wing tips are designed as an elastic about substantial wind-induced steel skeleton and thus are parti- vibrations due to strong vortex cularly vulnerable to earthquakes shedding at the building edges and wind. MAURER supplied that interferes with the living 56 dampers. These are the first comfort. Moreover, Bucharest is NEWS hydraulic dampers in structur- situated in a seismic area. Without al engineering delivered by the damping of the upper stories, Munich specialists for building building vibrations of more than protection. 500 mm would occur. The “Orhideea Towers” owe their Strongest forces acting on the || official name to the identically wing tips named urban district. It is located This is why the structural engi- west of the center of Bucharest, neers from Popp & Asociaţii have has an outstanding transportation designed diagonally arranged Orhideea Towers, Bucharest connection with roads, pedestrian hydraulic dampers at the four front bridge and subway and is consid- sides. For MAURER, the butterfly ered an upcoming business area. towers are the first project for They are located at the end of the The two slim office towers have a which they supply hydraulic dam- diagonal steel braces, two of which buckled floor plan, which – together pers in structural engineering. “We spanning across two stories each. with the sky bridge connecting were commissioned because the These dampers give the structure them – led to the name “butter- structural engineers and PORR considerably more stability and fly towers”. The towers feature as the prime contractor were sure safety. In addition, a very slim and different heights: the northern that we would be able to deliver cost-effective construction could one 85 m with 17 stories above the required performance in per- be realized so that the dampers do ground, the southern one 64 m fect quality just in time”, explains not cause additional costs for the with 13 stories. Paul Semrau, project manager at total building – in comparison with MAURER. “The task is to limit the a considerably more massive type The central structure of the towers movement in steel construction of construction featuring a similar is made of concrete. The buildings at the wing tips, thus preventing stability. taper off towards the four wing cracks in the structure.” Project co- tips, where they mainly consist of ordination and professional installa- The construction work for the tion were done in cooperation with Orhideea Towers started in October Retter Group, Mr. Guido Retter. 2015. The dampers were produced, tested and installed in 2017. The Dampers are located in the steel total rental area of 37,000 m² has skeleton been available since the end of The steel skeleton at the wing tips 2018. With this 75-million project, accommodates all movements; the building contractor, the Austrian however, the development of company CA Immo, aims at being resonant vibrations must be certified according to LEED Gold The dampers are installed at the bottom avoided. The total of 56 dampers and thus sets highest standards in end of the cross braces. They have a length is activated by too large or too terms of design, technical details, of 750 mm. fast movements of the building. and sustainability. MAURER MAURER 6 | MAURER MAGAZINE SEISMIC ISOLATORS FOR NEW CONSTRUCTION OF THE // A FARMHOUSE IN THE SCHIERSTEINER BRIDGE NETHERLANDS // SPHERICAL BEARINGS FOR 6,000 TONS OF STRUCTURAL LOAD AND LARGE ROTATIONS Earthquake zone Netherlands: the easy-to- handle isolation pendulums can be installed MAURER delivers latest-generation bearings and roadway expansion joints. even in inaccessible places and in new buildings. Wiesbaden, Mainz. The Schiersteiner Bridge ranks Munich, Usquert. The large-scale extraction among the most significant new highway bridge of gas in the area around Groningen results constructions in Germany. The challenge is the in frequent “artificial” earthquakes trig- enormous structural weight causing structural loads gered by subterranean landslips. Control of up to 6,000 t and large rotations. As a specialist calculations have shown that measures for structural protection systems, MAURER delivers must be taken to protect many existing The new Schiersteiner high-performance spherical bearings and noise- buildings in the region against earthquake Bridge under construction reduced roadway expansion joints. damage. This is a particular challenge with older buildings. With its SIP®-D-type MSA® Sliding Isolation Pendulums, MAURER offers an effective solution that is receiv- ing a huge response. The bearings isolate the building from the subsurface and are The Signature Bridge in Delhi in summer 2018 at the same time so light and thus easy- to-handle that they can be used even in difficult locations in existing buildings, for example in a listed farmhouse in Usquert. Two earthquakes occurred in 2018, with a particularly severe magnitude of 3.4 on 8 Orhideea Towers, Bucharest January. This does not sound very much, but the earthquakes are a result of natural gas extraction in the Groningen field. The epicenters are not very far from the earth’s surface and the tremors are therefore felt particularly acutely. Even earthquakes of a magnitude of 3 cause damage. HUGE BEARINGS FOR Around 150,000 people live in the region to the east of Groningen and earthquakes // THE NEW BEAUTY OF DELHI have already damaged thousands of houses. The whole thing has become a political issue and, following public protests, Signature Bridge: MAURER supplies MSM® spherical bearings for structural loads of politicians have ordered the annual output up to 231,000 kN. to be curbed. Gas extraction is set to be discontinued by 2030. Delhi/Wazirabad. It is both a beauty bearings accommodating the tensile and a political issue: the Signature force of the backstay cables Bridge across the Yamuna river con- necting Delhi to Wazirabad.
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages44 Page
-
File Size-