Tokoroa Wastewater Treatment Plant Upgrade South Waikato District Council

Tokoroa Wastewater Treatment Plant Upgrade South Waikato District Council

Tokoroa Wastewater Treatment Plant Upgrade South Waikato District Council • Four Treatment Plants • Tirau Consent Approved Late 2020 • Putāruru Consent Approved Late 2020 • Arapuni Consent Expired 1 July 2020 • Tokoroa Consent Expired 31 Dec 2011 • Tokoroa and Arapuni Consent lodged in 2018 • Notified (likely), New NPS, and NES Tokoroa Wastewater Treatment Plant Existing • Digester, Consolidation, Mechanical Biosolids • Step Screen • 3 Clarifiers • 2 Trickling Filters • FAST 1st in NZ • Drum Filter • UV Disinfection • SWDC inherited the Arapuni Treatment plant from ECNZ in 1993 • Discharge to ground infiltration on west side of Waikato River • Imhoff tank was built in the 1930’s • Upgraded in 1982, sand beds added • Tirau Plant. • It was upgraded in 2005 • Was first membrane treatment in NZ Phasing of Upgrades CAPEX ($000) INCREASED OPEX Year Proposed Staging for Discussion with WRC 1 2019 Wetlands for Tirau $ 418 $ 572 $ 60,600 $ 82,800 2 2020 Sludge Upgrade at Tokoroa - Enabling works for TN and TP upgrades $ 4,469 $ 6,115 $ 183,200 $ 250,700 2 2020 Putāruru Sludge Upgrade (additional centrifuge at Tokoroa) $ 2,466 $ 3,375 $ 233,000 $ 318,800 2 2020 Wetlands for Putāruru $ 599 $ 820 $ 251,400 $ 343,900 3 2021 Wetlands for Tokoroa $ 1,117 $ 1,529 $ 280,000 $ 383,000 4 2022 Tokoroa - TP Upgrade $ 631,200 $ 863,600 8 2026 Putaruru TN Upgrade $ 5,421 $ 7,418 $ 906,100 $ 1,239,700 12 2030 Arapuni $ 1,225 $ 1,676 $ 916,100 $ 1,254,700 14 2032 Tokoroa - TN Upgrade $ 3,250 $ 4,447 $ 1,236,500 $ 1,693,200 22 2040 Putaruru TP Upgrade $ 164 $ 225 $ 1,320,100 $ 1,807,600 27 2045 Tirau TN and TP Upgrade $ 2,088 $ 2,857 $ 1,398,800 $ 1,929,000 35 2053 Consent Expiry $ 21,217 $ 29,034 $ 1,398,800 $ 1,929,000 Tokoroa Wastewater Treatment Plant Upgrades over the years Tokoroa Wastewater Treatment Plant • 1958 • Initially a primary Dortmund, followed by two low rate biological filters and a final Dortmund sedimentation tank. • Sludge digestion of settled and filtered solids was installed to enable sludge to be processed for land application • Tokoroa Wastewater Treatment Plant • 1967 • A second plant was commissioned to run parallel to the original, dividing the waste between the two. • Upgrade included addition of primary treatment, two high rate biological filters, secondary settlement. • Sludge now treated in a new heated digester and existing used as a cold consolidating digester. Tokoroa Wastewater Treatment Plant • 1987 • Upgrades included changing existing low rate filters to high rate filters • Pre treatment was installed • The existing 1967 plant was decomissioned Tokoroa Wastewater Treatment Plant • 1993 • Decommissioned primary clarifier recommissioned as an intermediate clarifier and plumbed in between the trickling filters. Tokoroa Wastewater Treatment Plant • 1997 • Pre screening • Tertiary Treatment upgrades • FAST • Sand filtration • UV Disinfection Tokoroa Wastewater Treatment Plant • 2013 • Biosolids Upgrade • Decommission existing drying beds • New Mechanical dewatering system • Centrifuge and Screw Conveyor • Polymer dosing • Odour control Tokoroa Wastewater Treatment Plant Upgrade Today Tokoroa Wastewater Treatment Plant Upgrades • 2020 • Flare - Complete • New Digester & Ancillary Plant – Construction 60% complete • Site Visit this afternoon • Contract NZS 3916 Design and Build • Mott MacDonald & Spartan Construction Tokoroa Wastewater Treatment Plant • 2021 • Bandscreen • Tradewaste / Septage • Blowers 3 Waters Reform Funding • Application prepared with recommendation to bring forward planned upgrade in the LTP 2028 to 2022 to improve Total Nitrogen discharges (TN). • Denitrification Stage 1 of a process to improve water effluent quality to the receiving environment. • Receiving environment will change from a freshwater receiving environment to a Cultural Wetland to be constructed by 2023. Tokoroa Wastewater Treatment Plant • 2022 • Denitrification Project • Sampling (Pilot Complete) ECI • BIOWIN Model to determine best solution • Basis of Design to be novated • Design and Build Contract NZS 3916 • Completion March 2022 • Watch this space.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    36 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us