Item No. RE 2014-15 Allocation Particulars

Item No. RE 2014-15 Allocation Particulars

2.1.1 EASTERN RAILWAY ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15 (Figures in thousand of Rupees) Item Particulars Allocation RE 2014-15 No. NEW LINES (CONSTRUCTION) A - Works in Progress 1 Lakshmikantapur-Namkhana-Chandanagar with new material modification for Cap. 2,19,15 Kakadwip-Budakhali (5 km) & Chandanagar-Bakhali (17.2 km) 2 Deogarh-Dumka (72.25 km) Cap. 5,53,80 EBR .. 3 Deoghar-Sultanganj incl. Banka to Barhat & Banka to Bithia Road (147 km) Cap. 40,00,00 4 Tarakeswar-Bishnupur with extension upto Dhaniakhali, Arambagh-Irphala and new Cap. 33,69,00 material modification for Irphala-Ghatal (11.2 km), Arambagh-Champadanga (23.3 km) & Bishnupur-Uparsol (31.8 km) 5 Rampurhat-Mandarhill via Dumka (130 km) with new material modification for Cap. 55,36,05 Rampurhat-Murarai (29.48 km) - 3rd line EBR 14,98,00 6 Azimganj-Murshidabad (Jiaganj), incl. railway bridge over river Bhagirathi Cap. 4,10,00 7 Bariarpur-Mananpur via Kharagpur, Lachimpur-Barhat (67.78 km) Cap. 50,00 8 Sultanganj-Katuria via Asarganj, Tarapur & Belhar (74.8 km) Cap. 51,00 9 Tarkeshwar-Magra (51.95 km); incl material modification for Tarkeshwar-Furfura Cap. 20,00 Sharif (21.75 km) - New Line 10 Hasnabad-Hingalganj (17.37 km) Cap. 1,19,00 11# Hansdiha-Godda (30 km) Cap. 8,03,00 EBR 2,00,00 12 Pirpainti - Jasidih (97 km) Cap. 25,00 TOTAL-WORKS IN PROGRESS Cap. 151,56,00 EBR 16,98,00 TOTAL-New Lines (Construction) Cap. 151,56,00 EBR 16,98,00 GAUGE CONVERSION A - Works in Progress 13 Bardhaman-Katwa (51.52 km) with new material modification for Katwa-Bazarsau Cap. .. (30.59 km) - doubling, Katwa (Dainhat)-Mateswar (34.4 km), Negun - Mangalkot (8.60 km) & Mateswar - Memari (35.6 km) - NL EBR 62,49,98 TOTAL-WORKS IN PROGRESS EBR 62,49,98 TOTAL-Gauge Conversion EBR 62,49,98 DOUBLING A - Works in Progress 14 Sainthia-Tarapith - 3rd line Cap. 60,00,00 15 Plassey-Jiaganj (54.29 km) Cap. 39,00,00 16 Boinchi-Shaktigarh - 3rd line (25.83 km) Cap. 10,62,34 17 Bandel-Boinchi - 3rd line (30.53 km) Cap. 12,00,00 18 Princepghat-Majherhat - Doubling of Circular Railway (4.98 km) Cap. 50,50 19 Pirpainti-Bhagalpur (59.06 km) Cap. 25,00,00 2.1.2 EASTERN RAILWAY ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15 (Figures in thousand of Rupees) Item Particulars Allocation RE 2014-15 No. DOUBLING 20 Bazar Sau-Azimganj Jn (42.15 km) Cap. 50,00 21 Monigram-Nimtita (34.30 km) Cap. 10,00 22 New Alipore-Akra & Budge Budge-Pujali with new material modification for Pujali- Cap. 61,60 Uluberia (Birshivpur)(10.25 km) & Pujali-Bahrahat(9.75 km)- new lines EBR .. 23 Habra-Bongaon Phase-I (Habra-Chandpara) & Machlandapur-Swarupnagar Cap. 55,00 EBR .. 24 Sonarpur-Canning (14.96 km) with new material modification for Kalikapur-Minakhan Cap. 1,10,00 via Ghatakpur (38 km) - new line EBR .. 25 Kalinarayanpur-Krishnanagar with Krishnanagar-Shantipur-Nabadwipghat - GC, Cap. 25,00,00 Krishnanagar-Chartala, MM for Krishnanagar-Chapra-NL, Naihati-Ranaghat-3rd line, Nabadwipghat-Nabadwipdham upto BB loop (9.58 km), Ranaghat-Lalgola- strengthening (bridge No.2) EBR .. 26 Barasat-Hasnabad (12.12 km) Cap. 1,35,91 EBR .. 27 Bandel-Jirat of Bandel-Katwa section Cap. 1,50,25 EBR .. 28 Baruipur-Magrahat (15 km) Cap. 1,75,00 EBR .. 29 Kajra-Kiul (15.85 km) Cap. 27,80 EBR .. 30 Chandpara-Bongaon with extension to Chandabazar and new material modification Cap. 2,00,00 for Bongaon-Poramaheshtala (20 km) & Chandabazar-Bagdah (13.86 km) - new lines EBR .. 31 Barharwa-Tinpahar (16.49 km) Cap. 2,57,00 32 Pandabeswar-Chinpai (21.41 km) with new material modification between Barbani- Cap. 1,55,00 Churulia (9 km) - new line EBR .. 33 Chinpai-Sainthia & New Lines - Prantik-Siuri and new material modification for Cap. 3,37,50 Chowrigachha - Sainthia via Kandi C.Fund .. EBR .. 34 Tinpahar-Sahibganj (37.81 km) - As phase-I of doubling of Tinpahar-Bhagalpur Cap. 67,20,00 EBR .. 35 Ghutiari Sharif-Canning with extension upto Bangankhali & new material modification Cap. 7,23,00 for Bangankhali-Basanti (14.3 km) & Basanti-Jharkhali (23 km) - new line EBR .. 36 Dakshin Barasat-Lakshmikantapur (19.68 km), new line from Joynagar to Raidighi Cap. 14,50,00 (20 km) and new material modification for Joynagar-Durgapur (32 km) 2.1.3 EASTERN RAILWAY ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15 (Figures in thousand of Rupees) Item Particulars Allocation RE 2014-15 No. DOUBLING 37 Magrahat-Diamond Harbour (19.67 km) with material modification for Sangrampur - Cap. 7,85,00 Krishanchandpur (25 km), Diamond Harbour (Gurudasnagar) - Bahrahat (21 km) - new line & Daiamond Harbour (Gurudasnagar) - Kulpi (17.25 km) - new line EBR .. 38 Jirat-Ambika Kalna (20.23 km) Cap. 4,00,00 39 Nallikul-Tarakeshwar (17.18 km) Cap. 1,61,50 EBR .. 40 Krishnanagar-Bethuadahari (27.92 km) Cap. 13,50,00 EBR .. 41 Liluah-Dankuni - 3rd line (10.13 km) with extension to Furfura Sharif Cap. 6,90,00 EBR .. 42 Kalinarayanpur-Shantipur (15.85 km) with new material modification for Ranaghat Cap. 12,50,00 (Aranghata)-Duttapulia (8.17 km) - new line EBR .. 43 Katwa-Patuli (17.7 km) with new material modification for Ahmedpur-Katwa (51.92 Cap. 97,94,06 km) - gauge conversion EBR .. 44 Nalhati-Sagardighi (26.30 km) Cap. 22,20,25 45 Sondalia-Champapukur (23.64 km) with new material modification for Bira-Chakla Cap. 20,97,00 (11.5 km) EBR .. 46 Azimganj-Manigram (20.49 km) Cap. 18,00,00 EBR .. 47 Lalgola-Jiaganj (22.95 km) Cap. 7,00,25 EBR .. 48 Sealdah Division - 2nd passenger line between Mile 5-B and New Alipore (1.67 km) Cap. 50,00 49 Bethudahari-Palassey (22.51 km) Cap. 13,71,32 EBR .. 50 Sahibganj-Pirpanti (10.45 km) Cap. 21,46,89 EBR .. 51 Nabadwip Dham-Patuli (22 km) Cap. 16,65,00 EBR .. 52 Ambika Kalna-Nabadwipdham (23.29 km) Cap. 41,02,50 EBR .. 53 Barharwa-Bonidanga (4.73 km) Cap. 10,05,00 EBR .. 54 Dankuni-Chandanpur- 4th line(25.41 km) as 1st phase of Dankuni-Saktigarh 4th line Cap. 1,30,33 with new material modification for Baruipara-Furfura - new line 55 Dankuni-Bhattanagar via CC line (west) - Doubling with one additional loop at Cap. 3,31,00 Bhattanagar 56 Tarapith-Rampurhat - 3rd line Cap. 14,00,00 2.1.4 EASTERN RAILWAY ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15 (Figures in thousand of Rupees) Item Particulars Allocation RE 2014-15 No. DOUBLING 57 Sagardighi-Azimganj Cabin (16.30 km) Cap. 6,00,00 TOTAL-WORKS IN PROGRESS Cap. 618,81,00 B - New Works 58 Works costing below Rs.2.5 crore each Cap. .. DRF .. TOTAL-NEW WORKS Cap. .. DRF .. TOTAL-Doubling Cap. 618,81,00 DRF .. TRAFFIC FACILITIES-YARD REMODELLING & OTHERS A - Works in Progress 59 Sitarampur - Remodelling of Yard DF(3) 1,00 60 Dum Dum Jn. - Flyover to improve passage of goods & mail/express trains Cap. 1,00 EBR .. 61 Barachak - Direct delivery line & goods shed Cap. 3,00,00 62 Tikiapara-Howrah - Removal of operational constraints by laying addl track below DF(3) 1 Chandmari bridge 63 Durgapur - Extension of up & down loops DF(3) 50,00 64 Sheoraphuli, Uttarpara & Liluah - Dismantling of diamond crossing, provision of new DF(3) 50 crossings and wiring of Bhadreswar Ghat siding 65 Howrah - Extension of platform No.10-11 & 12-13 for accommodating longer length DF(3) 10,00 train 66 Asansol Division - Electrification of 1st down colliery siding with down avoiding line DF(3) 1,00 67 Barddhaman - Remodelling of yard (Phase-I) (Stage-II) Cap. 1,00 68 Chitpur - Addl. terminal Cap. 4,00,00 69 Sealdah-Bongaon-Ranaghat - Running of 12-coach electrical multiple unit trains DF(3) 1,00,00 70 Belgharia-Naihati - Automatic signalling system of quadruple line (C-route) DF(3) 25,00 71 Talit - Addl. movement facility DF(3) 1 72 Aranghata - Full rake capacity goods loop Cap. 9,00 73 Sonarpur-Canning, Ballygunj-Budge Budge & Baruipur-Namkhana - Extension of DF(3) 40,00 platform for running of 12-coach electrical multiple unit trains 74 Sealdah-Kalinarayanpur-Santipur, Kalyani-Kalyani Simanta - Extension of platforms DF(3) 50,00 for running 12-coach electrical multiple unit trains 75 Belur-Dankuni-Bardhaman, Bandel-Naihati & Bandel-Katwa - Running of 12-coach DF(3) 1,00 electrical multiple unit trains 76 Kajoragram-Andal Jn. Cabin - Bypass line to Sendha Road with electrification Cap. 30,00 77 Bandel-Katwa-Azimganj - Extension of loops DF(3) 5,00,00 78 Murahara - Conversion of halt station to B-class DF(3) 1,00,00 2.1.5 EASTERN RAILWAY ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15 (Figures in thousand of Rupees) Item Particulars Allocation RE 2014-15 No. TRAFFIC FACILITIES-YARD REMODELLING & OTHERS 79 Pakur, Tilvita & Kotalpukur - Development of freight & passenger train handling DF(3) 15,00 facilities 80 Topsi & Sonachara - Panel interlocking building DRF 1,00,00 81 Asansol - Stabling line for main line electrical multiple unit rakes DF(3) 5,00 82 Durgapur - Development of 3rd direct delivery line with world class freight terminal DF(3) 70,00 83 Dankuni - Development of freight terminal DF(3) 1,50,00 84 Madhupur - Development of direct despatch line for goods traffic DF(3) 10 85 Katwa-Azimganj - Tokenless block instrument DRF 2,22,00 86 Kankinara-Naihati - 4th passenger line by conversion of 1 up goods line with platform DF(3) 85,00 facilities at Kakinara 87 Jamalpur - Remodelling of yard and extension of platform No.2 & 3 for 24 coaches DRF 40,00 88 Malda Division - 1st foot over bridge (5 stations) DF(4) 7,00 89 Dum Dum-Barasat - Automatic signalling system DF(3) 68,00 90 Sealdah Division - Running of 12-coach electrical multiple unit trains on circular DF(3) 12,00 railway 91 Ranaghat-Gede - Running of 12-coach electrical multiple unit trains DF(3) 20,00 92 Tilbihta, Kotalpukur, Gumani & Tarapith Road - Addl loops DF(3) 1,00 93 Howrah Division - Through renewal of turnouts on main line & loop line (12 stations) DF(3) 20,00 94 Mankar - Addl.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    34 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us