Intermoor Inc. Morgan City, LA Fabrication Facility Intermoor Has

Intermoor Inc. Morgan City, LA Fabrication Facility Intermoor Has

InterMoor Inc. Morgan City, LA Fabrication Facility InterMoor has the capability to roll and fabricate piles from steel plate up to 2¼ inches thick (grade 50 material), up to 32 foot in diameter and 100+ feet in length. InterMoor has designed hundreds of piles, both suction and driven pile, utilized in the most complex projects, including; Shell - Stones, BP - Thunder Horse, Chevron -Jack/St. Malo, Williams – Gulfstar 1, LLOG -Delta House and Subsea 7 – Shell ALM. The list below highlights InterMoor’s recent experience with pile projects. Client PROJECT Year Claiborne Capex Modifications 2018 New Industries Sleepers and Jumper Stands - (4) 2018 Resolve Marine Corner Softeners - (12) 2018 Subsea 7 Grillage 2018 Subsea 7 BSL Centralizer - (1) and Bolt Trays - (42) 2018 McDermott BP Angelin Head Fabrication 2018 Quanta Marine 48” Sleepers - (4) 2018 New Industries 18’ Rolled Cans (18) and 10’ x 10’ Mudmats (168) 2018 Fisher Various Winch and Equipment Frames 2018 Stone Energy Cofferdam Modifications (1) - 20’ OD x 70’ L 2018 Ranger Offshore Split Deck Lifting Eye (8) and Jacket Lifting Trunnions (4) 2018 Onesubsea Mad Dog II: Pile Fabrication (4) and Dummy Pile Top (1) - 20’ OD X 65’ L 2018 LLOG Buckskin: Pile Fabrication (6) – (2) PLET: 16’ OD X 93’ L & 2018 (4) SCR: 12’9” OD X 72’ L Technip Leviathan: Pile Fabrication (1) 19’8” OD X 85’ L 2018 Subsea 7 Shell Coulomb: L67 Pile modification 2017 OneSubsea Chevron TVEX: Pile Fabrication (1) - 18’ OD X 65’ L 2017 Subsea 7 Shell ALM: Pile fabrication (1) –32’ O.D. x 55’ L (1) 2016 Subsea 7 Shell Coulomb: Sleepers (2) and Installation Aids 2016 McDermott I-Hub: Winch Grillage 2016 McDermott Sercan Pipeline: Installation aids 2016 McDermott I-Hub: Abandonment Pull Heads (460-720 T) 2016 Anadarko Project Yellow: Mudmats and Sepla Anchors 2016 Aquatic Bumper Sub-frame 2016 Aquatic Link Repairs, Drive Adaptor, Track Frame Assembly 2016 Aquatic AQLW Modifications 2016 McDermott Riser Frames 2016 Subsea 7 Various Installation Aids 2016 Subsea 7 Heidelberg: Installation Aids 2015 Confidential – InterMoor Inc. Not to be copied to third parties. Copyright InterMoor Inc. All rights reserved. InterMoor Inc. Morgan City, LA Fabrication Facility Subsea 7 Shell Stones: Installation Aids 2015 Technip Mudmat (1) 2015 Distribution Now Buoys (3) – 55 KIP 2015 DOF Subsea Jumper (1) 2015 Pemex Lakach: Suction Piles Fabrication (2) and Grillage –18’9” OD X 58’ L 2015 ExxonMobil / Julia: Suction Piles Fabrication (4) – 20’ OD X 45’L, 2015 McDermott 20’OD X 75’ L Anadarko / Subsea Heidelberg: Suction Piles Fabrication (9) – 12’9” OD X 60’ L 2015 7 Murphy Medusa: Suction Pile Fabrication (1) –14’ OD X 76’4” L 2014 bpTT Juniper: Mooring Piles Fabrication (8) – 48” OD X 200’ L 2014 LLOG Delta House: Suction Piles Fabrication (12) – 16’ OD X 93’ L 2013/2014 BP Thunder Horse Water Injection: Suction Pile Fabrication (1) – 16’ OD X 2013 70’ BP Cofferdam Fabrication (1) – 20’ OD X 60’ L 2013 BP Galapagos: Suction Pile Fabrication (1) – 12' 9” OD X 65 ' L 2013 Cameron Suction Pile Fabrication (1) – 15’ OD X 65’ L 2013 Enbridge Suction Pile Head Fabrication (1) – 17’ OD X 10’ L 2013 Oceaneering Sleepers (20) and Magazines (5) Fabrication 2013 Aker SDA Suction Pile Top 2012 BP Rope Guide & Riser Booster 2012 Cameron Valve Brackets (3); Clamps; Accumulator Rack 2012 EMAS Tamar: Suction Pile Fabrication (3) & Cradle Modifications 2012 LLOG WHO DAT: Suction Pile Fabrication (2) – 16’ OD X 70’ L 2012 Oceaneering Funnel Guide; Repair Spooling Unit 2012 Procurement Anchor Buoys 2012 Services Pro-Log Offshore Box (2) 2012 Shell BC 10 Phase 2: 48" Conductors (5) 2012 Signet Maritime Cascade Package 2012 Technip SIT Stand Fabrication & WET Parking Frame 2012 Transocean Spooling Unit Fabrication and Repair 2012 Williams Gulf Star 1: Suction Pile Fabrication (10) – 18’ OD X 93’ L 2012 Aker SDA Suction Pile Top 2011 Anadarko Tugger Frames (2) 2011 ATP Mudmats (5); Lift Frame 2011 BP Cradle Fabrication; Lift Frame 2011 Cabgoc 80 Kip Buoys 2011 Cameron Jack St. Malo: Suta Mudmat; Suction Piles (11) – 18’OD X 90’L; Dummy 2011 Mandrel; Lower Frames; Cradle Fabrication; Fabricate Shipping Post (4); Confidential – InterMoor Inc. Not to be copied to third parties. Copyright InterMoor Inc. All rights reserved. InterMoor Inc. Morgan City, LA Fabrication Facility Shoe Fabrication Diamond Anchor Repair; Horse Collars 2011 EMAS Tamar: Suction Piles (3) – 12’9” OD X 65’ L 2011 LLOG Tree Base; Capex Mods; Fabrication Stabbing Guide; Fabrication Pile 2011 Oceaneering Spooling Unit Skid; Funnel Guide; Mudmats; Umbilical Weldment; 2011 Spooling Unit Shafts Petrobras Papa Terra: 36” Conductors (17) 2011 Shell Auger: Hang off Platform; Modify Reel Frame 2011 Transocean Cradle Fabrication 2011 Confidential – InterMoor Inc. Not to be copied to third parties. Copyright InterMoor Inc. All rights reserved. .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    3 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us