Hindawi International Journal of Mathematics and Mathematical Sciences Volume 2020, Article ID 9308174, 9 pages https://doi.org/10.1155/2020/9308174 Research Article The Measures of Efficiency of Power Generation Plants in Sylhet of Bangladesh Kanis Fatama Ferdushi,1 Anton Abdulbasah Kamil ,2 Saleh Ahmed,1 and Luthful Alahi Kawsar1 1Department of Statistics, Shahjalal University of Science and Technology, Sylhet 3114, Bangladesh 2Faculty of Economics, Administrative and Social Sciences, Istanbul Gelisim University, Istanbul, Turkey Correspondence should be addressed to Anton Abdulbasah Kamil; [email protected] Received 4 December 2019; Revised 2 March 2020; Accepted 30 March 2020; Published 1 May 2020 Academic Editor: Niansheng Tang Copyright © 2020 Kanis Fatama Ferdushi et al. *is is an open access article distributed under the Creative Commons Attribution License, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited. *is study measures the performance of power generation plants in Sylhet region of Bangladesh considering twenty-four-month monthly dataset during 2013-14. To measure the performance of those plants, gross electricity generation was considered as output for the stochastic frontier model, whereas fuel consumption, lube oil consumption, auxiliary consumption, cost, heat rate, and hours of run were considered as input variables. Based on the log-likelihood hypothesis test, trans-log production model is preferred over Cobb–Douglas (C-D) production model for this study. *e average efficiency of the selected plants is above 90 percent, and there is Sylhet Combined Cycle Power Plant (CCPP) which has an efficiency of about 78.6 percent for truncated normal distribution. In the time-variant inefficiency effects model, fuel consumption, cost, square product of lube oil con- sumption, interaction between fuel consumption and lube oil consumption as well as auxiliary consumption, and hours of run have a significant positive influence on power generation. On the other hand, some input variables such as hours of run and interaction between cost and heat rate have a significant negative influence on power generation. *e estimated values of the time- varying inefficiency parameter η are positive for both the truncated and the half-normal distribution. *is result indicates that technical efficiency has declined over the reference period of the study. 1. Introduction facing the problem of load shedding in urban and rural areas. Electricity is the main source of power of a country, and *ere are many areas in Bangladesh where electricity most of the economic activities depend on this power. facilities do not exist properly even in this twentieth century. Bangladesh is the most densely populated country in the In other words, more than a third of Bangladesh’s 166 world and also considered one of the most arousing energy million people still deprive from access to electricity, while growth nations. *e rapid increase of economic and pop- the country hardly can produce some of its 11,500 mega- ulation growth has resulted in increasing electricity demand watts (MW). *e installed capacity of power generation in in Bangladesh [1, 2]. Although the number of power plants is Bangladesh was 1,437 MW in 1986. More than 90% of the increased from 108 to 127, the demand for electricity could nation’s power was generated by steam turbine, gas turbine, not be mitigated. Moreover, the nation’s power generation or combined cycle power stations using domestically units have repeatedly become unable to meet system de- available natural gas. *e total installed capacity is mand over the past decade [2, 3]. Power generation has been 20,000 MW (combining solar power) as of September 2018. accelerated through different resources (solar, renewable *e government of Bangladesh (GoB) has declared and energy, etc.) in Bangladesh, but mass people could never aimed to provide electricity for the people living in Ban- enjoy hundred percent electrification, and people are still gladesh by the year 2021 [4]. According to the Power System 2 International Journal of Mathematics and Mathematical Sciences Master Plan, the government of Bangladesh has planned to Bangladesh by using the techniques of efficiency, then generate 11,450 MW power from domestic coal and limited resources cannot create hindrance. In that case, 8,400 MW from import coal within 2030 [4]. Despite the fact policy makers can be able to make a master plan to increase that there is showed many initiative, however another sig- the production level up to the maximum level and savings as nificant obstacle is facing to deliver generated power effi- well. ciency. It has been estimated that one-third of the total A firm is efficient means this firm can produce the generation are losses due to transmission and distribution. maximum level of output for a given level of input on the In this case, we have to pay serious attention to combat assumption that technology is fixed. Efficiency scores vary various difficulties in the energy sector whereas the Ban- across producers, and they can be related to firm’s char- gladesh Government is interested to undertake various acteristics such as size, ownership, and location. *us, one projects to accommodate new policies. *e rapidly growing can identify and remove sources of inefficiencies from the demand also can be mitigated by considering and imple- process using the allocated resources properly. *e common menting the new innovative project in both residential and characteristic of the technical efficiency estimation tech- industrial sectors. *e advantage of energy resources may niques is that information is extracted from optimum ob- play a vital role in economic development of sustainable servations from a body of data to determine the best practice infrastructure development and finally can save insecurity in production frontier. *e study of frontier begins with Farrell any country. *e performance or efficiency measure in the [11] who suggested that efficiency could be attained by using power generation plants has not yet taken place in Ban- minimum level of input under certain production tech- gladesh. *e energy efficiency of high energy-consuming nology to produce maximum level of output. *e stochastic industries plays a contributing role in social sustainability, frontier analysis (SFA) depends on the model with com- economic performance, and environmental protection of posed error terms; one kind of error is due to technical any nation [5]. Liu et al. [6] stated that power industry is the inefficiency parameters and others due to random shocks. basis of economy and society developments. *e stochastic frontier analysis approach is based on the idea *e power sector in Bangladesh was less developed than that an economic unit may operate below its production that in other developing countries in Asia. Recently, Ban- frontier level due to pure errors and some uncontrollable gladesh started construction of the 2.4-gigawatt Rooppur factors. Some researchers had used parametric method SFA Nuclear Power Plant expected to go into operation in 2023. and nonparametric method DEA to measure efficiency in According to the Bangladesh Power Development Board energy sector and recommended policy maker to eliminate (BPDB) in July 2018, 90 percent of the population had access those difficulties. Lin and Long [12] adopted or applied the to electricity [7]. However, the per capita energy con- stochastic frontier analysis to study the average efficiency sumption in Bangladesh is considered low. Meanwhile, the and energy-saving potentiality of the chemical industry. load shedding distracts economic growth which makes Mardani et al. [13] showed data envelopment analysis (DEA) economic activities slower. Fortunately, urban people are is a good evaluative model which is a nonparametric effi- pursuing greater convenience and comfort in their daily lives ciency measuring tool for efficiency measurement. Otsuka for their location, but rural people are deprived from [14] used SFA to estimate the energy demand function and modern facilities even from their compulsory farming ac- analyze the levels and determinants of energy efficiency. tivities. *e largest energy consumers in Bangladesh are Another prominent researcher, Sueyoshi et al. [15], exam- industries and the residential sector, followed by the com- ined a recent research trend on DEA applications from 1980s mercial and agricultural sectors. Agriculture is the main to 2010s on his meta-analysis. source of income for the rural people of the country, and there is a huge demand for electricity in dry season. Hassan 2. Materials et al. [8] showed that in generating and distributing elec- tricity, the failure to adequately manage the load leads to *e main input parameters that need to consider when extensive load shedding resulting in severe disruption in the calculating the efficiency of a power plant are fuel calorific industrial production and other economic activities. For this value, steam tonnage, enthalpy change during expansion in reason, many people in rural areas are migrating urban areas turbine, auxiliary consumptions of equipment, and effi- for work. As a result, the urban areas have become denser. ciency of major equipment such as turbines, generator, and *e demand of electricity of capital increases more and more pumps. According to operational perspective, the efficiency at a significantly high rate. *is demand is driven by the we calculated for this work is mainly combined cycle power continued growth in gross domestic production in recent plant. A combined cycle power plant is operated by a gas years. Islam and Khan [9] showed that Bangladesh is pro- turbine as a topping cycle which is a ranking cycle where ducing more power generation with less energy compared to exhaust heat of sufficiently high temperature is drawn to the some higher-income countries. So Bangladesh has the po- heat recovery steam generator. Heat recovery steam gen- tentiality to do better and achieve higher economic growth erator produces superheated steam which drives a steam by supplying electricity properly. Geller et al.
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages9 Page
-
File Size-