FARGO ND – Moorhead Flood Risk Management Project

FARGO ND – Moorhead Flood Risk Management Project

FARGO ND – Moorhead Flood Risk Management Project Red River Levees Phase I 2nd Street Downtown Reach CONTRACT AWARD DOCUMENTS October 9, 2014 Fargo ND Moorhead Flood Risk Management Project FNDMRM2ST Red River Levees Phase 1 2nd Street Downtown Reach PROJECT TABLE OF CONTENTS October 9, 2014 DIVISION 02 - EXISTING CONDITIONS 02 41 00 DEMOLITION DIVISION 03 – CONCRETE 03 11 13.00 10 STRUCTURAL CAST-IN-PLACE CONCRETE FORMING 03 15 00.00 10 STRUCTURAL CAST-IN-PLACE CONCRETE FORMING 03 20 00.00 10 CONCRETE REINFORCING 03 30 00.00 10 CAST-IN-PLACE CONCRETE 03 35 00.00 10 CONCRETE FINISHING 03 39 00.00 10 CONCRETE CURING 03 45 33 PRECAST AND PRESTRESSED STRUCTURAL CONCRETE DIVISION 04 - MASONRY 04 20 00 MASONRY DIVISION 05 – METALS 05 12 00 STRUCTURAL STEEL 05 50 13 MISCELLANEOUS METAL FABRICATIONS 05 50 14 STRUCTURAL METAL FABRICATIONS 05 51 33 METAL LADDERS 05 72 00 DECORATIVE METAL SPECIALTIES DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES 06 10 00 ROUGH CARPENTRY DIVISION 07 - THERMAL AND MOISTURE PROTECTION 07 11 13 BITUMINOUS DAMPPROOFING 07 14 00 FLUID-APPLIED WATERPROOFING 07 19 00 WATER REPELLENTS 07 21 13 BOARD AND BLOCK INSULATION 07 22 00 ROOF AND DECK INSULATION 07 53 23 ETHYLENE-PROPYLENE-DIENE-MONOMER ROOFING 07 60 00 FLASHING AND SHEET METAL 07 92 00 JOINT SEALANTS DIVISION 08 – OPENINGS 08 11 16 ALUMINUM DOORS AND FRAMES 08 60 45 SKYLIGHTS 08 71 00 DOOR HARDWARE 08 81 00 GLAZING 08 91 00 METAL WALL LOUVERS DIVISION 09 – FINISHES 09 06 90 COLOR SCHEDULE 09 90 00 PAINTS AND COATINGS TABLE OF CONTENTS Page 1 CONTRACT AWARD DOCUMENTS - OCTOBER 9, 2014 Fargo ND Moorhead Flood Risk Management Project FNDMRM2ST Red River Levees Phase 1 2nd Street Downtown Reach DIVISION 10 - SPECIALTIES 10 14 00.20 INTERIOR SIGNAGE 10 44 16 FIRE EXTINGUISHERS DIVISION 22 – PLUMBING 22 00 00 PLUMBING, GENERAL PURPOSE 22 10 00.00 10 VERTICAL PUMPS, AXIAL-FLOW AND MIXED-FLOW IMPELLER- TYPE 22 10 00.00 10A SYSTEM CURVE 22 12 00 WET WELL PHYSICAL MODEL STUDY 22 13 29 SUBMERSIBLE NON-CLOG PUMP DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING 23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS 23 03 00.00 20 BASIC MECHANICAL MATERIALS AND METHODS 23 05 48.00 40 VIBRATION AND SEISMIC CONTROLS FOR HVAC PIPING AND EQUIPMENT 23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC 23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS 23 08 00.00 10 COMMISSIONING OF HVAC SYSTEMS 23 09 33.00 40 ELECTRIC AND ELECTRONIC CONTROL SYSTEM FOR HVAC 23 23 00 REFRIGERANT PIPING 23 31 13.00 40 METAL DUCTS 23 82 46.00 40 ELECTRIC UNIT HEATERS DIVISION 26 – ELECTRICAL 26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS 26 20 00 INTERIOR DISTRIBUTION SYSTEM 26 23 00.00 40 SWITCHBOARDS 26 29 01.00 10 ELECTRIC MOTORS, 3-PHASE VERTICAL INDUCTION TYPE 26 36 00.00 10 AUTOMATIC TRANSFER SWITCH 26 41 00 LIGHTNING PROTECTION SYSTEM 26 51 00 INTERIOR LIGHTING 26 56 00 EXTERIOR LIGHTING DIVISION 31 – EARTHWORK 31 00 00.00 14 EARTHWORK FOR PUMP STATION AND FLOODWALL DIVISION 33 – UTILITIES 33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION 35 05 40.17 SELF-LUBRICATED MATERIALS, FABRICATION, HANDLING, AND ASSEMBLY 35 20 14 STOPLOGS 35 20 16.53 VERTICAL LIFT GATES TABLE OF CONTENTS Page 2 CONTRACT AWARD DOCUMENTS - OCTOBER 9, 2014 Fargo ND Moorhead Flood Risk Management Project FNDMRM2ST Red River Levees Phase 1 2nd Street Downtown Reach DIVISION 40 - PROCESS INTEGRATION 40 05 13 PIPELINES, LIQUID PROCESS PIPING 40 95 00 PROCESS CONTROL 40 95 00A PROCESS CONTROL - PLC POINTS LIST 40 95 00B PROCESS CONTROL - CONTROL LOOP DESCRIPTIONS DIVISION 46 - WATER AND WASTEWATER EQUIPMENT 46 20 20 MANUALLY CLEANED TRASH RACK AND RAKE END OF TABLE OF CONTENT TABLE OF CONTENTS Page 3 CONTRACT AWARD DOCUMENTS - OCTOBER 9, 2014 DIVISION 2 EXISTING CONDITIONS Fargo ND Moorhead Flood Risk Management Project FNDMRM2ST Red River Levees Phase 1 2nd Street Downtown Reach SECTION 02 41 00 DEMOLITION 05/10 09/12/2014 PART 1 GENERAL 1.1 REFERENCES The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only. AMERICAN SOCIETY OF SAFETY ENGINEERS (ASSE/SAFE) ASSE/SAFE A10.6 (2006) Safety Requirements for Demolition Operations U.S. ARMY CORPS OF ENGINEERS (USACE) EM 385-1-1 (2008; Errata 1-2010; Changes 1-3 2010; Changes 4-6 2011; Change 7 2012) Safety and Health Requirements Manual U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA) 40 CFR 61 National Emission Standards for Hazardous Air Pollutants 1.2 PROJECT DESCRIPTION 1.2.1 Demolition/Deconstruction Plan Prepare a Demolition Plan and submit proposed demolition, and removal procedures for approval before work is started. Include in the plan procedures for careful removal and disposition of materials specified to be salvaged, coordination with other work in progress, a disconnection schedule of utility services, a detailed description of methods and equipment to be used for each operation and of the sequence of operations. Coordinate with Waste Management Plan. Provide procedures for safe conduct of the work in accordance with EM 385-1-1. Plan shall be approved by Owner's Representative prior to work beginning. 1.2.2 General Requirements Do not begin demolition until authorization is received from the Owner's Representative. Remove rubbish and debris from the project site daily; do not allow accumulations inside or outside the buildings. The work includes demolition, salvage of identified items and materials, and removal of resulting rubbish and debris. Remove rubbish and debris from Owner's property daily, unless otherwise directed. Store materials that cannot be removed daily in areas specified by the Owner's Representative. In the interest of occupational safety and health, perform the work in accordance with EM 385-1-1, Section 23, Demolition, and other applicable Sections. SECTION 02 41 00 Page 1 CONTRACT AWARD DOCUMENTS - OCTOBER 9, 2014 Fargo ND Moorhead Flood Risk Management Project FNDMRM2ST Red River Levees Phase 1 2nd Street Downtown Reach 1.3 ITEMS TO REMAIN IN PLACE 1.3.1 Existing Construction Limits and Protection Do not disturb existing construction beyond the extent indicated or necessary for installation of new construction. Provide temporary shoring and bracing for support of building components to prevent settlement or other movement. Provide protective measures to control accumulation and migration of dust and dirt in all work areas. Remove dust, dirt, and debris from work areas daily. 1.3.2 Trees Protect trees within the project site which might be damaged during demolition or deconstruction, and which are indicated to be left in place, by a 6 foot high fence. Erect and secure fence a minimum of 5 feet from the trunk of individual trees or follow the outer perimeter of branches or clumps of trees. Replace any tree designated to remain that is damaged during the work under this contract with like-kind or as approved by the Owner's Representative. 1.3.3 Utility Service Maintain existing utilities indicated to stay in service and protect against damage during demolition operations. Prior to start of work, Owner's Representative will coordinate shutoff of utilities serving each area of alteration or removal. Disconnect and seal utilities in accordance with Utility Owner requirement. 1.3.4 Facilities Protect electrical and mechanical services and utilities. Where removal of existing utilities and pavement is specified or indicated, provide approved barricades, temporary covering of exposed areas, and temporary services or connections for electrical and mechanical utilities. Floors, roofs, walls, columns, pilasters, and other structural components that are designed and constructed to stand without lateral support or shoring, and are determined to be in stable condition, must remain standing without additional bracing, shoring, or lateral support until demolished or deconstructed, unless directed otherwise by the Owner's Representative. Ensure that no elements determined to be unstable are left unsupported and place and secure bracing, shoring, or lateral supports as may be required as a result of any cutting, removal, deconstruction, or demolition work performed under this contract. 1.4 BURNING The use of burning at the project site for the disposal of refuse and debris will not be permitted. 1.5 SUBMITTALS Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES: SD-01 Preconstruction Submittals Existing Conditions; G SECTION 02 41 00 Page 2 CONTRACT AWARD DOCUMENTS - OCTOBER 9, 2014 Fargo ND Moorhead Flood Risk Management Project FNDMRM2ST Red River Levees Phase 1 2nd Street Downtown Reach SD-07 Certificates Demolition Plan; G Deconstruction Plan; G Notification SD-11 Closeout Submittals Receipts 1.6 QUALITY ASSURANCE Submit timely notification of demolition projects to Federal, State, regional, and local authorities in accordance with 40 CFR 61, Subpart M. Notify the local air pollution control district/agency and the Owner's Representative in writing 10 working days prior to the commencement of work in accordance with 40 CFR 61, Subpart M. Comply with federal, state, and local hauling and disposal regulations. In addition to the requirements of the "Contract Clauses," conform to the safety requirements contained in ASSE/SAFE A10.6. Comply with the Environmental Protection Agency requirements specified. 1.6.1 Dust and Debris Control Prevent the spread of dust and debris and avoid the creation of a nuisance or hazard in the surrounding area. Do not use water if it results in hazardous or objectionable conditions such as, but not limited to, ice, flooding, or pollution. 1.7 PROTECTION 1.7.1 Traffic Control Signs a.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    766 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us