CPES Report 14Th Release.Xlsx

CPES Report 14Th Release.Xlsx

CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORT CPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011 CONTRACT CPES FINAL RATING/ NAME OF LICENSE DATE OF *IMPL. PROJECT AMOUNT STATUS WMS MTL TIME FAC ESH RDR VISIT QUALITATIVE CONSTRUCTOR NO. EVALUATION AGENCY DUR (C.D.) (Php, M) RATING DESCRIPTION *87.50% 11-18-70 Construction 32944 Road Concreting at Brgy. Sallacapo 02/28/09 I 0.855 18 C 0.375 0.200 0.300 - - - 87.50 Satisfactory 121 Construction Const. of 2-Storey, 2-Classroom Sch. 89.10% V. Corporation (Formerly: 21686 04/15/11 III 2.472 120 C 0.419 0.200 0.300 - - - 91.90 Bldg. at Heritage ES, Loma de Gato Satisfactory 121 Construction) 121 Construction Impvt. of MPB at Sta. Maria Agro- *96.50% Corporation (Formerly: 21686 11/26/08 III 1.717 90 C 0.365 0.300 0.300 - - - 96.50 Industrial High School Outstanding 121 Construction) 121 Construction *78.00% Corporation (Formerly: 21686 Const. of MPB 11/24/08 NCR 3.821 90 C 0.280 0.200 0.300 - - - 78.00 Satisfactory 121 Construction) 121 Construction 91.97% Corporation (Formerly: 21686 Const. of MPB, Brgy. Mabini J. Rizal 06/02/10 NCR 9.315 180 C 0.475 0.200 0.300 - - - 97.50 V. Satisfactory 121 Construction) Const. of Two (2) Storey Sch. Bldg. *88.20% 2H2L Construction 16293 04/04/11 IVA 0.999 60 C 0.382 0.200 0.300 - - - 88.20 Oogong E/S Satisfactory Const. of Two (2) Storey, Six (6) 85.75% 2H2L Construction 16293 04/15/11 IVA 7.848 150 C 0.389 0.200 0.300 - - - 88.90 Classrooms Cainta E/S Satisfactory 80.34% 2H2L Construction 16293 Widening of Antipolo-Teresa Road 11/25/08 IV-A 19.224 180 C 0.261 0.300 0.300 - - - 86.10 V. Satisfactory Impvt. of Flood Control at So. Upper *89.90% 2H2L Construction 16293 03/12/09 IVA 2.692 120 C 0.461 0.138 0.300 - - - 89.90 East Kamias & So. East Kamias V. Satisfactory Impvt. of Multi-Purpose Pavement at *91.20% 2H2L Construction 16293 03/12/09 IVA 3.748 150 C 0.479 0.133 0.300 - - - 91.20 Brgy. Dela Paz & Brgy. San Isidro V. Satisfactory Rehab./Reconst./Upgrading of 91.86% 2H2L Construction 16293 Marikina-Victoria Valley-Antipolo 08/26/09 IVA 19.222 180 C 0.475 0.200 0.300 - - - 97.50 V. Satisfactory Road Rehab./Reconst./Upgrading of 2H2L Construction 16293 Marikina-Victoria Valley-Antipolo 05/18/09 IV-A 19.221 180 O 0.387 0.239 0.150 0.030 0.025 0.050 88.10 - Road 2-R Construction & Repair/Impvt. of Villasis-Malasiqui *83.80% 15304 08/27/08 I 2.410 60 C 0.338 0.200 0.300 - - - 83.80 Supply San Carlos Road V. Satisfactory 2-R Construction & Const. of Additional Classroom @ *86.80% 15304 05/21/09 I 2.417 120 C 0.496 0.072 0.300 - - - 86.80 Supply Comprehensive Nat'l. H/S Satisfactory 310 Construction Estrella-Pantaleon Bridge 83.22% 4875 11/28/08 NCR 38.627 405 C 0.376 0.200 0.300 - - - 87.60 Specialist Corporation Approaches (Across Pasig River) V. Satisfactory Road Upgrading (Gravel to Paved) of 90.62% 3FS Construction 30464 Bagahupi-Babatngon-Sta. Cruz- 04/06/11 VIII 19.108 180 C 0.459 0.176 0.300 - - - 93.50 V. Satisfactory Barugo-Carigara Road * 1st/Final * For DPWH, only the region and PMO office are listed 14th CPES Release Page1 CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORT CPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011 CONTRACT CPES FINAL RATING/ NAME OF LICENSE DATE OF *IMPL. PROJECT AMOUNT STATUS WMS MTL TIME FAC ESH RDR VISIT QUALITATIVE CONSTRUCTOR NO. EVALUATION AGENCY DUR (C.D.) (Php, M) RATING DESCRIPTION *85.40% 3FS Construction 30464 Const. of Coastal Road 04/08/11 VIII 18.895 150 C 0.421 0.133 0.300 - - - 85.40 Satisfactory Upgrading of Bagahupi-Babatngon- 91.07% 3FS Construction 30464 03/11/10 VIII 19.289 230 C 0.497 0.189 0.300 - - - 98.60 Sta. Cruz, Barugo-Carigara Rd. V. Satisfactory *88.10% 3FS Construction 30464 Const. of Grouted Riprap @ Brgy. 90 03/18/09 VIII 0.962 70 C 0.381 0.200 0.300 - - - 88.10 Satisfactory Repair/Rehab. of MNR, Km.174+000 - 88.80% 3K Builders 27277 Km.175+000 w/ exception Villasis 06/10/10 I 9.996 32 C 0.455 0.133 0.300 - - - 88.80 Satisfactory Section Const. of One Unit Classroom *91.80% 3K Rock Engineering 27908 04/08/11 II 0.641 45 C 0.485 0.133 0.300 - - - 91.80 School Building, San Antonio I/S V. Satisfactory Construction of Multi-Purpose *90.70% 3K Rock Engineering 27908 09/03/09 II 0.572 45 C 0.407 0.200 0.300 - - - 90.70 Building, Magsaysay V. Satisfactory Const./Repair of Multi-Purpose 84.60% 3K Rock Engineering 27908 02/25/10 II 1.735 60 C 0.413 0.133 0.300 - - - 84.60 Building Satisfactory Const./Completion of MPB, 87.40% 3K Rock Engineering 27908 06/05/10 II 1.445 60 C 0.441 0.133 0.300 - - - 87.40 Liwayway Satisfactory *82.50% 3K Rock Engineering 27908 Const. of Flood Control, Sangbay 08/18/08 II 0.954 70 C 0.321 0.204 0.300 - - - 82.50 V. Satisfactory Const. of Sch. Bldg., Bannawang *89.30% 3K Rock Engineering 27908 08/18/08 II 0.578 45 C 0.375 0.218 0.300 - - - 89.30 Integrated School V. Satisfactory *87.50% 3K Rock Engineering 27908 Const. of Sch. Bldg., Victoria H/S 11/25/08 II 1.622 100 C 0.375 0.200 0.300 - - - 87.50 V. Satisfactory Completion of Multi-Purpose *95.80% 3K Rock Engineering 27908 03/06/09 II 1.783 60 C 0.458 0.200 0.300 - - - 95.80 Building, Gundaway V.Satisfactory Const. of 2 Storey Multi-Purpose *91.10% 3-L Construction 16745 03/09/09 V 0.955 120 C 0.436 0.175 0.300 - - - 91.10 Bldg. (Brgy. Hall), Brgy. San Gabriel V. Satisfactory * 1st/Final * For DPWH, only the region and PMO office are listed 14th CPES Release Page2 CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORT CPES Reports-On-going and Completed Projects from January 01, 2009 to December 31, 2011 CONTRACT CPES FINAL RATING/ NAME OF LICENSE DATE OF *IMPL. PROJECT AMOUNT STATUS WMS MTL TIME FAC ESH RDR VISIT QUALITATIVE CONSTRUCTOR NO. EVALUATION AGENCY DUR (C.D.) (Php, M) RATING DESCRIPTION Road Upgrading (Gravel to Paved), 89.64% 3-L Construction 16745 09/09/09 V 6.555 150 C 0.418 0.200 0.300 - - - 91.80 Sipocot-Cabusao Road V. Satisfactory 3RB Construction & 89.10% 19541 Const. of Sto. Cristo Seawall 05/28/10 V 2.876 150 C 0.458 0.133 0.300 - - - 89.10 Supply Satisfactory 3RB Construction & Const./Rehab. of Water Supply, 73.94% 19541 08/19/08 IV-A 1.921 30 C 0.288 0.200 0.300 - - - 78.80 Supply Level 1 and II System Satisfactory Road Upgrading along DM Jct.-Leg.- 3RB Construction & 84.30% 19541 Sto. Domingo-Tab.-Cam. Sur Bdry., 02/24/09 V 19.233 150 C 0.488 0.133 0.300 - - - 92.10 Supply Satisfactory Tiwi-Tabaco Section 3RB Construction & Impvt. of San Fernando North Road, 19541 02/17/10 V 9.450 210 O 0.378 0.240 0.150 0.015 0.035 0.050 86.80 - Supply San Jacinto Section 3RB Construction & Road Conc. & Impvt. of Barangay 86.38% 19541 02/22/10 V 0.959 160 C 0.396 0.139 0.300 - - - 83.50 Supply Road Satisfactory 3RB Construction & Const. of Tagas-Divino Rostro Supply/Ajan Jaeda, Inc. JV-08-209 09/01/09 V 19.179 202 O 0.384 0.240 0.150 0.030 0.033 0.050 88.70 - Bridge (JV) Repair and Rehab. of MPB *92.40% 3S Builders 18009 04/09/11 VII 1.893 97 C 0.491 0.133 0.300 - - - 92.40 (Municipal Hall) V. Satisfactory Construction of 1-CL (7x9) Lupigue *88.70% 4 A's Construction 9446 09/05/09 II 1.108 45 C 0.454 0.133 0.300 - - - 88.70 IS Satisfactory 84.60% 4 A's Construction 9446 Const./Conc. of Road 02/23/10 II 4.822 330 C 0.413 0.133 0.300 - - - 84.60 Satisfactory 79.54% 4 A's Construction 9446 Construction of Road 08/11/08 II 1.926 90 C 0.326 0.200 0.300 - - - 82.60 Satisfactory *89.70% 4 A's Construction 9446 Asphalt Overlay of Daang Maharlika 03/03/09 II 1.929 30 C 0.464 0.133 0.300 - - - 89.70 V.Satisfactory 4B Construction Upgrading and Concreting of Subic- 83.76% 23445 03/03/09 III 41.616 180 C 0.407 0.163 0.300 - - - 87.00 Corporation Philseco Road Satisfactory Rehab./Reconst./Upgrading of 4B Construction *87.40% 23445 Damaged Paved National Road, 05/23/09 III 33.265 45 C 0.374 0.200 0.300 - - - 87.40 Corporation Satisfactory Olongapo-Bugallon Road Rehab./Reconst./Upgrading of 4B Construction 80.41% 23445 Damaged Paved National Roads at 04/04/11 III 41.378 163 C 0.356 0.167 0.300 - - - 82.30 Corporation Unsatisfactory Subic-PHILSECO Rd.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    433 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us