ARK-LA-TEX SCOUT Serving the Local Market with Drilling Activity, Permits & Deals for Sale Volume 03, No

ARK-LA-TEX SCOUT Serving the Local Market with Drilling Activity, Permits & Deals for Sale Volume 03, No

Regional Oil & Gas Intelligence July 30, 2015 ARK-LA-TEX SCOUT Serving the local market with drilling activity, permits & deals for sale Volume 03, No. 09 Memorial & Tanos test huge Cotton Valley wells Regional Activity (State Data) Two horizontal Cotton Valley gas which is responsible for up to 39% of the (06/29/15 to 07/24/15) wells operated by Memorial Production company’s estimated proved reserves. Compls Permits Partners and Tanos Exploration tested In Smith County, Texas, Tanos’ Guthrie- Arkansas 33 28 above 8.5 MMcf/d, according to state data. Wilson GU 1 Alloc-1H tested at 8,551 North Louisiana – 47 Memorial’s Dulany A Gas Unit-1H was Mcf/d with a 38/64-in. choke. The well, drilled with a 6,335-ft lateral which was completed in mid-July, has a East Texas (RRC 5) 5 17 and fracked using 9.6 million lateral of 4,709 ft. Tanos is a privately held East Texas (RRC 6) 12 25 lb of proppant and 48,000 company founded in 2013 with a focus on Most Active Operators by Permits gallons of acid. The Rusk County, Texas, the Ark-La-Tex region. The company’s ➊ SEECO 21 well had an IP rate of 8,819 Mcf/d on a plans for this year include running one rig ➋ Husqvarna Forestry 12 54/64-in. choke. Memorial is most active to drill six wells in Gilmer field and four ➌ XTO Energy 8 in the East Texas/North Louisiana area, in Overton field in the county. Permits by Formation (by Last Scout) EXCO reports EUR increases from enhanced completions Dallas-headquartered EXCO Resources proppant up to 2,700 lb/ft in its new Formation 07/30 07/09 06/18 reports an 11% drop in Haynesville and completions, an increase of more Fayetteville 18 10 34 Bossier production but EUR increases than 90% from the previous year. The Haynesville 15 20 23 for some wells with enhanced enhanced wells also benefit from greater Cotton Valley 13 8 11 Pettit 4 7 1 completions. The company’s restrictions on rate, which lead to a Barnett 3 12 6 East Texas production was 40 higher level of pressure and greater total Goodland Lime 3 – – MMcfe/d, down from 45 MMcfe/d in Q1, production over time. Moorefield 3 – 4 but EXCO noted that its 2015 development During the quarter, EXCO drilled six Travis Peak 3 5 4 plan favor 2H15 completions. (48% WI) operated horizontal wells in Bacon Lime 2 2 – In 2014, EXCO increased proppant the Shelby area of the Haynesville and Other Formations 53 28 54 from 900 lb/ft to 1,400 lb/ft, resulting Bossier and turned two (50% WI) to sales. TOTAL 117 92 137 in an EUR increase from 1.0 Bcf to 1.5 It plans to run three rigs for the remainder Source: TXRRC, SONRIS & AOGC Bcf per 1,000 ft of lateral. Because of of the year and drill 11 (45% WI) wells Active Rigs Running (Baker Hughes) 58 these results, the company is increasing and turn 10 (49% WI) to sale. EXCO Improves Well East Texas Well Economics Deals For Sale East Texas Well Cost And Days To Drill Improvement Potenal Highlights 1 10-15E; $MM; Days 2 EAST TEXAS DRILLING PROJECT Q2 ‘15 proved reserves of 1.5 Bcf per 1,000 feet of 23,685-Gross Acres. 19,158-Net Acres. • 16 Days toDa drysill to drill70 lateral represents a 15% increase in EUR for 59 14 TRINITY COUNTY undeveloped Haynesville locaons from year-end ‘14 54 52 60 12 47 Carrizo, Eaglebine, Buda, Glen Rose -- 42 50 • Target EUR of 1.75 Bcf per 1,000 feet of lateral observed 10 Pettet, Travis Peak & Deep Bossier. from producing wells with 1,400 lbs of proppant per 40 DV 8 G&G Data Available. Drill Ready Status. lateral foot 14.2 30 6 13.4 12.5 11.2 100% OPERATED WI; Average 81% NRI 10.3 20 • Increasing compleon design to 2,700 lbs of proppant 4 Test Wells Drilled in Carrizo and Bossier. per lateral foot for remaining ‘15 plan 10 2 DV 3218L • Reducing well cost to $10.3 million from $12.5 million 0 0 in 1Q14 and increasing proppant more than 90% 11 12 13 14 15E MADISON CO., TX PROSPECTS East Texas Well EUR Improvement Potenal Improve East Texas Wellhead IRR By 2.2x 14,000-Gross Acres. 15; EUR; BCF/1,000’ 3 14-15; IRR; % 4 WOODBINE / EAGLEBINE / BUDA 33 0.5 Lower Woodbine. 7,500-8,000 Ft. DV 0.20.2 Buda. 8,000-8,500 Ft. 11-Laterals to HBP Core Leases 2.0 1.75 15 1 100% OPERATED WI; ~75% Lease NRI 1.3 1.5 Bcf/1,000’ Q2 15 Proved Bcf/1,000’ ‘15E Target Est. 30-Day IP (Eaglebine): 600 BOPD Est. 30-Day IP (Buda): 300 BOPD EAGLE- Q4 14 Reserve Q2 15 Proved Increased Goal Q4 14 Well Cost & EUR15E Well Cost & EUR Well Reserves: 250 MBO/Well BINE Report Proppant Completion Cost: $6,500,000 per Well Source: EXCO Resources July 27, 2015 via PLS docFinder (www.plsx.com/finder) DV 3169L .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    1 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us