TEN-E Financed Projects 1995-2013 for Europa.Xls P Rojec T Referenc E Dec Is Ion 2006 Guidelines Referenc E P Rojec T P Riority

TEN-E Financed Projects 1995-2013 for Europa.Xls P Rojec T Referenc E Dec Is Ion 2006 Guidelines Referenc E P Rojec T P Riority

2013 TEN-E financed projects 1995-2013 for Europa.xls Member Company Description State(s) Decision Priority axe Priority Project reference Project Project priority (*) priority Project Financing by TEN Financing 2006 guidelines reference2006 guidelines E341/13 13-E341/13EL.9 PEI EL.9 IT DII GmbH 206.225 € (GERMANY) + Feasibility study on a submarine electricity interconnection between Italy and North EuropaGrid Africa (Algeria, Tunisia, Libya) for the exchange of renewable electricity between Transmission Europe and North Africa Services Ltd (IRELAND) E344/13 13-E344 EL.7 PEI EL.7 DK Energinet 1.100.000 € Kasso-Tjele Monopiles (DENMARK) E345/13 13-E345 2.23 PCI, PEI DK Energinet 400.000 € Oresund - two new 132 kV interconnectors from Denmark to Sweden (DENMARK) E346/13 13-E346 EL.7 PEI EL.7 DK Energinet 1.100.000 € Synchronous condensers in Fraugde and Herslev (DENMARK) E348/13 13-E348 4.1 PCI IT Feasibility study for a new electrical interconnection through the northern cross border 251.910 € CIE, CVA, SAV, between Italy and Switzerland, by means of the under-construction Gran San Bernardo SITRASB (ITALY) safety gallery and existing highway infrastructures E351/13 13-E351 3.55 PCI BE ELIA Asset 2.000.000 € Offshore Grid and Interconnection Enabler: Stevin Project (BELGIUM) E352/13 13-E352 EL.7 PEI EL.7 LT LITGRID AB Oversight of design and build contract of HVDC back-to-back station interconnecting 50.000 € (LITHUANIA) Lithuanian and Polish power grids in LitPol Link Project E353/13 13-E353 EL.8 PEI EL.8 SK Slovenska 2.338.779 € elektrizacna Erection of the "2x400 kV OHL Vel'ky Dur (SK) – Gabcikovo (SK) prenosova sustava (SLOVAKIA) E354/13 13-E354 EL.3 PEI EL.3 FR-ES Red Electrica de 1.498.000 € Espana (SPAIN) + Réseau deTransport Studies for a new Western interconnection between Spain and France d'Electricité (FRANCE) E355/13 13-E355 1.9 PCI ES Red Electrica de Feasibility studies of the electrical connection by submarine cable between the Canary 508.250 € Espana (SPAIN) islands of Gran Canaria and Fuerteventura Page 1 of 34 2013 (continue) TEN-E financed projects 1995-2013 for Europa.xls G219/13 13-G219 NG.1 PEI NG.1 PL 400.000 € Operator Gazociagow The expansion of the Mallnow metering station to allow the physical reverse flow on the Przesylowych GAZ- Yamal pipeline in the Poland direction, in connection with the obligation of the SYSTEM SA Regulation 994/2010 (POLAND) G222/13 13-G222 8.39 PCI Lietuvos energijos 252.250 € "Preparation of Syderiai Underground Gas Storage Project Development Plan and of gamyba, AB the Environmental Impact Assessment" (LITHUANIA) G223/13 13-G223 7.15 +PCI 9.27 SI Additional studies on the environment (routing) related to the development of cross- 575.000 € Plinovodi (SLOVENIA) border transmission capacities of the Slovenian gas transmission system towards neighbouring systems G224/13 13-G224 9.1 + 9.4PCI PL-LT AB Lietuvos Dujos 420.000 € Environmental Impact Assessment documentation up to environmental decision (LITHUANIA) + Gaz- obtainment for the Gas Interconnection Poland-Lithuania System (POLAND) G226/13 13-G226 8.28 PCI PT Transgas 269.061 € Construction of two caverns, TGC 3S and TGC 4S, for underground storage of natural Armazenagem gas in the concession area of Carriço, Portugal (PORTUGAL) G228/13 13-G228 NG.5 PEI NG.5 ES Completion of several necessary technical studies for an underground natural gas 300.000 € Petroleum Oil & Gas storage in salt leached caverns in the Bages area, North-Eastern Spain (Mediterranean Espana (SPAIN) axle) 2012 Member Company Description State(s) Decision Priority axe Priority Project reference Project Project priority (*) priority Project Financing by TEN Financing 2006 guidelines reference2006 guidelines Terna – Austrian Lienz (AT)-Cordignano (IT) line : Network and Feasibility study for new Alternate 952.567 € E319/12 12-E319 2.16 PCI IT-AT Power Grid AG Current Extra High Voltage interconnection Double circuit Internal overhead Line 400 kV from Substation Prosenice to Substation 137.000 € E321/12 12-E321 3.83 PCI CZ CEPS Nosovice with ID code E323/12 12-E323 3.32 PCI PT REN Reinforcement of Beira Interior axis 589.031 € Environmental Impact Assesment and Right-of-way study in Latvian territory (substation 500.000 € Latvijas Elektriske E324/12 12-E324 4.13 PCI LV Riga CHP2 – Estonian-Latvian state border) of the Project "Estonian-Latvian third Tikli AS electricity interconnection 905.200 € E325/12 12-E325 EL.7 PEI EL.7 DK Energinet Danmark Synchronous Condenser at 400kV substation Njaeverskov Page 2 of 34 SlovenskaTEN-E financed projects 1995-2013 for Europa.xls 1.550.000 € elektrizacna Realisation of the 2x400kV line between the crossing of the lines V409 and V071/072 E327/12 12-E327 3.76 PCI SK prenosova sustava, and the substation Vola a.s. Red Electrica de Feasibility studies of the electrical connection in the South-East of Andalucia, between 358.750 € E328/12 12-E328 3.25 PCI ES Espana Almeria and Malaga 1.380.000 € E329/12 12-E329 EL.7 PEI EL.7 DK Energinet Danmark Kasso-Revsing-Tjele : Undergrounding of 400 kV cables TenneT TSO GmbH 1.598.000 € E331/12 12-E331 2.20 PCI AT-DE (DE) - Austrian Power Planungsproject fur Verbindungsleitung St.Peter(AT) – Isar (DE) Grid AG (AT) Study for the development of offshore platforms in the Belgian part of the North Sea 1.827.245 € E340/12 12-E340 3.55 PCI BE ELIA Asset SA allowing the connection of offshore windfarms and enabling as a "plug-in" solution for the connection of the future North Sea Offshore Grid Slovenský 1.821.169 € G207/12 12-G207 9.27 PCI SK plynarenský priemysel Modification of T23MW turbines to Dry Low Emission system a.s 7.15 Additional studies on the environment (routing) related to the development of cross- 1.150.000 € G209/12 12-G209 +9.2 PCI SI Plinovodi d.o.o border transmission capacities of the slovenian gas transmission system towards 7 Hungary, Italy and Croatia TIGF Lussagnet's Subsurface studies in view of the extension of underground gas storage 1.665.300 € G210/12 12-G210 8.22 PCI FR capacities NET4GAS s.r.o. (CZ) - 198.000 € G211/12 12-G211 7.14 PCI CZ-AT Gas connect Austria Studies and documentation related to the first bidirectional Czech-Austrian connection GmbH (AT) Energean Oil & Gas South Kavala offshore gas field conversion into underground gas storage (South Kavala 1.750.000 € G213/12 12-G213 8.21 PCI EL S.A. UGS) 150.000 € 9.1+ 7.2+ Analysis of the Polish and German gas interconnections development capabilities in the G214/12 12-G214 7.18 PCI PL context of European gas market integration and improving SoS serviceability of the +7.2 Operator Gazociągów systems 1 Przesyłowych GAZ- SYSTEM S.A Maltese Ministry for 125.925 € Feasibility study and Cost-Benefit Analysis of a gas pipeline between Malta and Sicily G215/12 12-G215 8.38 PCI MT energy and (Italy) conservation of water Transgás 2.505.869 € Armazenagem – Sociedade Construction of 2 caverns,TGC-3S and TGC-4S, for underground storage of natural G216/12 12-G216 8.28 PCI PT Portuguesa de gas in the concession area of Carriço (PT) Armazenagem de Gás Natural, S.A. Page 3 of 34 2011 TEN-E financed projects 1995-2013 for Europa.xls Member Company Description State(s) Decision Priority axe Priority Project reference Project Project priority (*) priority Project Financing by TEN Financing 2006 guidelines reference2006 guidelines ČEPS, a.s., New Internal Overhead line 400kV from Substation Krasikov to Substation Horni E295/11 11-E295 3.84 PCI CZ Transmission system 2.210.000 € Zivotice with ID Code V458 – Action B (42,9km) operator (CZ) Triton Knoll Offshore E296/11 11-E296 3.54 PCI UK Wind Farm Limited Studies on the development of Triton Knoll offshore wind farm in the UK 1.159.559 € (UK) Red Eléctrica de Feasibility studies of the electrical connection on the Aragon(ES)Levante(ES) Axis E297/11 11-E297 3.32 PCI ES 420.550 € Espana, S.A.U (ES) (Platea-Godelleta) Integrated study delivering a technical concept for a major offshore cable corridor 3.50 50Hertz Transmission E298/11 11-E298 PP EL.7 DE linking several offshore wind farms to the high voltage onshore grid at the Substation 450.000 € EL7 Gmbh (DE) Lubmin Nordsee Offshore E300/11 11-E300 3.50 PCI DE SIS-MEG -Realising a self-installing substation to connect MEG Offshore I to the Grid 1.000.000 € MEGI Gmbh Slovenska elektrizacna Looping of the line V409 into the new 400/110kV substation Vol'a (SK) – projecting and E306/11 11-E306 3.76 PCI SK 757.400 € prenosova sustava, engineering Works; environmental monitoring and inspection a.s. (SK) Cobra Instalaciones y E307/11 11-E307 2.9 PCI ES Feasibility study of an interconnector between Spain and France 385.000 € Servicios S.A. (ES) Scottish and Southern E308/11 11-E308 4.10 PCI UK North Connect 690.000 € Energy plc (UK) C.N.T.E.E. Transelectrica S.A.(National Power Studies for the new 400 kV double circuit Overhead Line (OHL) between existing E310/11 11-E310 4.21 PCI RO 395.212 € Grid Company) stations Smardan and Gutinas Romania electricity TSO (RO) GIS substation in Revsing-VSC converter station in Tjele on the Skagerrak 4 Energinet Danmark E311/11 11-E311 EL7 PEI EL.7 DK connection- Phase Shifting Transformers in Kassǿ and Ensted on the Kass-Hamborg 2.438.517 € (DK) connection 2011 (continue) Page 4 of 34 TEN-E financed projects 1995-2013 for Europa.xls Member Company Description State(s) Decision Priority axe Priority Project reference Project Project priority (*) priority Project Financing by TEN Financing 2006 guidelines reference2006 guidelines Energean oil and gas South Kavala offshore gas field conversion into underground gas storage - Basic G188/11 11-G188 8.21 PCI IT, GR S.A.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    34 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us