Krishnapatnam Port Company Limited Development of Phase-III at Krishnapatnam Port, Sri Potti Sriramulu Nellore Dist

Krishnapatnam Port Company Limited Development of Phase-III at Krishnapatnam Port, Sri Potti Sriramulu Nellore Dist

Krishnapatnam Port Company Limited Development of Phase-III at Krishnapatnam Port, Sri Potti Sriramulu Nellore Dist Pre-Feasibility Report December 2015 KRISHNAPATNAM PORT COMPANY LIMITED Regd.Off: H.No. 8-2-293/82/A/379&379A, Ground Floor, Plot No. 379, Road No.10, Jubilee Hills, Hyderabad – 500033, India. Tel: +91-40-23339990/91/92 Fax: +91-40-23337789 E-mail: [email protected] www.krishnapatnamport.com PDF compression, OCR, web optimization using a watermarked evaluation copy of CVISION PDFCompressor Krishnapatnam Port Co. Ltd. December 2015 TABLE OF CONTENTS 1.0 EXECUTIVE SUMMARY 1-1 1.1 Preamble 1-1 1.2 External Road and Rail Connectivity 1-1 1.3 Need for Phase III Development 1-2 1.4 Planning Considerations 1-2 1.5 Infrastructure Proposals of Phase III Development 1-3 1.6 Review of Land use Plan 1-8 1.7 Estimated Capital Cost of Phase III, Viability, Implementation Period 1-8 1.8 Environmental Aspects 1-8 1.9 Social Benefits 1-9 2.0 INTRODUCTION 2-1 2.1 Identification of the Project and Project Proponent 2-1 2.2 Brief Description of the Nature of the Project 2-2 2.3 Need for the Project and its Importance to the Country and Region 2-2 2.3.1 Preamble 2-2 2.4 Traffic Forecast 2-4 2.4.1 Coal 2-5 2.4.2 Iron Ore 2-5 2.4.3 General Cargo 2-6 2.4.4 Liquid Cargo 2-8 2.4.5 Container Cargo 2-9 2.4.6 Port Craft Berthing and Repair Needs 2-9 2.4.7 Coast Guard Jetty 2-9 2.5 Importance to the Country and the Region 2-9 2.6 Demand Supply Gap 2-11 2.7 Import Vs Indigenous Production 2-12 2.8 Export Possibility 2-12 2.9 Domestic/Export Markets 2-13 2.10 Employment Generation Due to the Project 2-13 3.0 PROJECT DESCRIPTION 3-1 3.1 General 3-1 3.2 Type of project Including Interlinked and Interdependent projects 3-2 3.3 Location 3-3 3.4 Details of alternate site 3-4 3.5 Size or magnitude of Operation 3-4 3.6 Project Description with Process Details 3-5 3.7 Raw Material Required along with Estimated quantity 3-7 3.8 Resource Optimization / Recycling and Reuse Envisaged in the project 3-8 3.9 Availability of water, its source, Energy / Power requirement 3-8 3.9.1 Water Requirement 3-8 Pre-Feasibility Report - Phase III i PDF compression, OCR, web optimization using a watermarked evaluation copy of CVISION PDFCompressor Krishnapatnam Port Co. Ltd. December 2015 3.9.2 Power Requirement 3-9 3.9.3 Quantity of Wastes to be generated 3-9 3.10 Schematic representations of the feasibility drawing 3-10 4.0 SITE ANALYSIS 4-1 4.1 Connectivity 4-1 4.2 Land Form, Land Use and Land Ownership 4-1 4.3 Topography (along with Map) 4-2 4.4 Existing Land Use Pattern 4-3 4.4.1 Straightening of Creek 4-5 4.4.2 Development of Mangroves 4-5 4.4.3 Shore Protection- South of South Breakwater 4-6 4.4.4 Shore Protection North of North Breakwater 4-6 4.4.5 Maintaining Existing Drainage 4-6 4.5 Existing Infrastructure 4-6 4.5.1 General 4-7 4.5.2 Berthing Front 4-7 4.5.3 Marine Infrastructure 4-7 4.5.4 Navigational Aids 4-8 4.5.5 Storage Yards 4-8 4.5.6 Road/ Rail /pipe line network 4-8 4.5.7 Drainage 4-9 4.5.8 Water Supply 4-9 4.5.9 Other Infrastructure 4-9 4.6 Shore Line and Littoral Drift 4-10 4.7 Soil 4-11 4.8 Climatic data from Secondary sources 4-12 4.8.1 Climate 4-12 4.8.2 Temperature 4-12 4.8.3 Humidity 4-12 4.8.4 Visibility 4-12 4.8.5 Rainfall 4-13 4.8.6 Currents 4-13 4.8.7 Tidal Data 4-13 4.8.8 Wind 4-14 4.8.9 Wave data 4-14 4.8.10 Harbour Tranquillity 4-15 4.8.11 Cyclones 4-17 4.9 Social Infrastructure Available 4-17 Pre-Feasibility Report - Phase III ii PDF compression, OCR, web optimization using a watermarked evaluation copy of CVISION PDFCompressor Krishnapatnam Port Co. Ltd. December 2015 5.0 PLANNING BRIEF 5-1 5.1 Planning Concept 5-1 5.1.1 Design Vessel Size 5-1 5.1.2 Navigational and Operational Requirements 5-2 5.1.2.1 Navigable Channel 5-3 5.1.2.2 Stopping Distance 5-6 5.1.2.3 Turning Circle Dimensions and Depth at Berths 5-7 5.1.3 Berthing Requirements 5-8 5.1.3.1 Parcel Size and Cargo Handling Rates 5-8 5.1.3.2 Effective Working Days and Working Hours Per Day 5-10 5.1.3.3 Time for berthing / De-berthing and Peripheral Activities 5-10 5.1.3.4 Berth Occupancy 5-11 5.1.3.5 Requirement of Berths and Quay Length 5-14 5.1.4 Berthing and Repair Facility including dry dock for Port Crafts, Naval & Commercial Vessels 5-15 5.1.4.1 Port Craft Jetty 5-16 5.1.4.2 Coast Guard Jetty 5-16 5.1.4.3 Dry Docking, Berthing and repair Facility 5-17 5.1.5 Dry Dock Facility 5-17 5.1.6 Cargo Storage Area Requirements 5-18 5.1.6.1 Storage for Coal 5-18 5.1.6.2 Container Storage Area 5-19 5.1.6.3 General Cargo 5-20 5.1.6.4 Liquid Cargo 5-21 5.1.6.5 Total Cargo Storage Area Requirement 5-22 5.1.7 Cargo Handling Equipment 5-23 5.1.8 Shore Protection near South & North Breakwaters 5-26 5.2 Population Projection 5-27 5.3 Development Strategy 5-28 5.4 Study of Alternative Layouts 5-28 5.4.1 Alternative I 5-30 5.4.2 Alternative II 5-30 5.4.3 Evaluation of Alternative Layouts 5-30 5.5 Recommended Port Layout 5-33 5.6 Land use Planning 5-36 5.7 Dredging 5-36 5.8 Maintenance Dredging 5-38 5.9 Reclamation 5-38 Pre-Feasibility Report - Phase III iii PDF compression, OCR, web optimization using a watermarked evaluation copy of CVISION PDFCompressor Krishnapatnam Port Co. Ltd. December 2015 5.10 Assessment of Infrastructure Demand 5-38 5.10.1 Road connectivity 5-38 5.10.2 Railway connectivity 5-39 5.10.3 Bridges 5-40 5.10.4 Service Corridor 5-41 5.10.5 Water Requirement 5-41 5.10.6 Power Requirement 5-42 5.10.7 Buildings 5-43 5.11 Amenities / Facilities 5-44 5.11.1 Navigational Aids 5-44 5.11.2 Port Craft 5-44 5.11.3 General Lighting 5-44 5.11.4 Storm Water Drainage 5-44 5.11.5 Bunkering 5-45 5.11.6 Environmental Aspects 5-45 6.0 PROPOSED INFRASTRUCTURE 6-1 6.1 Port Area (Processing Area) 6-1 6.1.1 Infrastructure Proposed in Phase III 6-1 6.1.2 Designation of Berths 6-7 6.1.3 Navigable Waterways 6-7 6.1.4 Summary of Infrastructure Required in Phase III 6-8 6.2 Non-Operational Area (Non Processing Area) 6-11 6.3 Green Belt 6-11 6.4 Social Infrastructure 6-11 6.5 Connectivity (Traffic and Transportation Road / Rail / Water ways etc.) 6-12 6.5.1 Rail 6-12 6.5.2 Road 6-12 6.5.3 Waterways 6-13 6.6 Drinking Water Management (Source & Supply of Water) 6-13 6.7 Sewerage System 6-13 6.8 Industrial Waste Management 6-14 6.9 Solid Waste Management 6-14 6.10 Power Requirement & Supply / Source 6-14 7.0 REHABILATATION AND RESETTLEMENT (R&R) PLAN 7-1 Pre-Feasibility Report - Phase III iv PDF compression, OCR, web optimization using a watermarked evaluation copy of CVISION PDFCompressor Krishnapatnam Port Co. Ltd. December 2015 8.0 PROJECT IMPLEMENTATION SCHEDULE AND COST ESTIMATES 8-1 8.1 General 8-1 8.2 Proposed Development 8-1 8.3 Time Schedule 8-2 8.3.1 Civil Works 8-2 8.3.1.1 Dredging and Reclamation 8-2 8.3.1.2 Berth Construction 8-2 8.3.1.3 Shore Protection on the windward side of the Breakwaters 8-3 8.3.2 Mechanical and Electrical works 8-3 8.3.3 Onshore Development 8-3 8.3.3.1 Buildings 8-3 8.3.3.2 Stockyards 8-3 8.3.3.3 Road and Rail 8-4 8.3.3.4 Utilities and Environmental Aspects 8-4 8.4 Capital Cost Estimates for Phase III Development 8-4 Pre-Feasibility Report - Phase III v PDF compression, OCR, web optimization using a watermarked evaluation copy of CVISION PDFCompressor Krishnapatnam Port Co. Ltd. December 2015 LIST OF DRAWINGS DRAWING NO. DRAWING NAME KP/PH-III/PFR/01 Location Map KP/PH-III/PFR/02 Phase I & Phase II Layout of the Port KP/PH-III/PFR/03 Proposed Phase III Layout Superimposed Along With Existing Port Plan (Sheet 1 of 2) Proposed Phase III Layout Superimposed Along With Existing Port Plan (Sheet 2 of 2) KP/PH-III/PFR/04 Existing Road & Rail Connectivity to Port KP/PH-III/PFR/05 Proposed Straightening of the Kandaleru Creek & Reclamation of Old Course of Creek KP/PH-III/PFR/06 Existing Mangroves Requiring Replacement KP/PH-III/PFR/07 Proposed South shore protection KP/PH-III/PFR/08 Proposed North shore protection KP/PH-III/PFR/09 Alternative I Layout for Phase-III KP/PH-III/PFR/10 Alternative II Layout for Phase-III KP/PH-III/PFR/11 Combined Land Use Plan on completion of Phase-III Developments of Krishnapatnam Port KP/PH-III/PFR/12 Dredging Plan for Phase III KP/PH-III/PFR/13 Dredge Disposal Location KP/PH-III/PFR/14 Reclamation for Area Development / Site Grading for Phase III KP/PH-III/PFR/15 Transit Corridors (Road, Railway lines, Pipelines, Conveyor lines etc.,) KP/PH-III/PFR/16 Phase III Buildings KP/PH-III/PFR/17 Implementation Schedule for Phase III Pre-Feasibility Report - Phase III vi PDF compression, OCR, web optimization using a watermarked evaluation copy of CVISION PDFCompressor Krishnapatnam Port Co.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    122 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us