Division Kaithal District Tehsil Pundri

Division Kaithal District Tehsil Pundri

,/. .f,utt titte of the Project :- Diversion of 0.0421 Ha. of Forest Land to proposed New Retail Outlet of IOCL Between Km. Stone No. 170-172, on Assandh-Kaithal Road (SH-l1), RD-l71.890 (LHS) at Village/Town Rajound, under Forest Division & Distt. Kaithal, Haryana. File No :- FP/HR/Othersl24435/2017 Date of Proposal : 2410412017 CHECK LIST SERIAL NUMBER: 17 " Scheme for C.A." Name of the Forest/Reaches to be diverted: Diversion of 0.0421 Ha. of Forest Land to proposed New Retail Outlet of IOCL Between Km. Stone No. I70-I72, on Assandh-Kaithal Road (SH-11), RD-171.890 (LHS) at Village/Town Rajound, under Forest Division & District Kaithal. Forest Area = 0.0421 ha. Details of degraded forest land/non-forest land where C.A. is to be carried out. Division Kaithal District Kaithal Tehsil Pundri Range Pundri C.A. Site Name : P.F Fatehpur Escape Compartment No. C-5 Teh. Pundri Distt. Kaithal Area to be Afforested :- a) Whether the site selected for Compensatory Afforestation is a land bank (Yes or Not : Yes b) If the CA site is other than the land bank, reasons be given:-- N'A In case of non- forest area identified for CA, then what is the distance of CA site from the adjoining forest boundary: i) Soil type : Sandy Loam - ii) Topography: (a) Hilly/Undulating/Plain (b) Slope: Steep/Medium/Gentle iii) Whether the area is bearing any root stock of vegetation: Plantation Model :- - Copy of the approved Compensatory Afforestation Scheme/Model showing component wise physical and financial break up is as under: 1. Schedule of Plantation Programme:- Detail of year wise break-up of requirements of funds is as under:- The plantation cost is calculated for Tall Plants norms at 4m x 2.5m spacing and it is approved by PCCF, Haryana's letter No. Misc- dated at the wage rate of Rs. 2241- per duy_glrl4gt' Sr. No. Year Rate oer Planl I Ist Year cost of afforestation Rs. 172l- Per Plant 2 IInd Year Plantation Rs. 64l- Per Plant J IIIrd Year Plantation Rs. 32l- Per Plant 4 IVth Year Plantation Rs. 25l- Per Plant 5 Vth Year Plantation Rs. 26l- Per Plant 6 VIth Year Plantation Rs. 15/- Per Plant I VIIth Year Plantation Rs. 8/- Per Plant 8 VIIIth Year Plantation Rs. 9/- Per Plant 9 IXth Year Plantation Rs. l0/- Per Plant l0 Xth Year Plantation Rs. I l/- Per Plant Total 3721- Area to U" Oiu"rt"a : 0.0421 Ha. No. of trees to be felled = 4 Plants 32 : Area t time of the area to be diverted 0'0421x2:0'0842 Numb anted 0.0842x1000 =84.2 Plants or say 84 Plants Total S. Description Rate No. Amount (Rs.) A Nett present value of Forest Land to be diverted Rs. 8.87 Lacs/Ha 37343 t] Compensatory AlTorestation Chargcs No. of I Plants 84 Rs. l12l- Per Plant t4448 1 l" Year cost of afforestatiotr 5376 2 2no vear maintenance 84 Rs. 64l- Per Plant a Plant 2688 J 3to vear maintenance 84 Rs. 32l- Per Plant 2l 00 4 4"' year maintenance 84 Rs. 25f Per Plant 2184 5 5t" vear rnaitttenatrce 84 Rs. 26l- Per 1260 6 6t't vear maintenance 84 Rs. l5f Per Plant 6'72 1 7t" vear maintenance 84 Rs. 8/- Per Plant tt" 156 8 year maintenattce 84 Rs. 9/- Per Plarrt rt Per Plant 840 9 ve ar t.t'' a i''l te n a n ce 84 Rs. l0f l0 -t" vau, maintettance 84 Rs I l/- Per Plant 924 l1 Barbed wire fencing cltarges t, 11 Rs. 76700/- per rl<tn 253 il Rl<rn Total C.A. charges (1 toll) 56559 C Supervisory/Overhead/ Misc. Charger l0% on the total CA 56s6 charges D Additional compensatory Afforestattqn !h4lges 32X2 : 64 Plants l't Year cost of afforestation 64 Rs. l72f Per Plarrt r 1008 4096 2 f.-yeut nterlance 64 Rs 641- Per Plant '.'.,a 2048 J Tily"u, ntenance 64 Rs. 32l- Per Plant 't-tu A Plant I 600 T 4t" year ma ntenance 64 Rs. 25l- Per t664 5 5"t year maintenance 64 Rs. 261- Per Plant 6 6"'year maintenance 64 Rs. 15/- Per Plant 960 Plant 512 7 Ttltyear maintetrauce 64 Rs. 8/- Per 8'ltyear 515 8 maintenance 64 Rs. 9/- Per Plant nt" 9 year maintenance 64 Rs. 101 Per Plant 640 Rs. I ll- Per Planl 104 r0 '0"' yeat tnaintetrance 64 l1 Barbed wire fencing charges 0.26 Rs. 76700/- per rkm 19942 Rkrn Sub Total (D) Total Addl. C.A. Charges 43750 E Penal C.A. 0 F Total C.A. Charses (B+C1 62215 per G Felline Charges 0.99 M' Rs. 1000/- M' 990 per plattt H Plantation damage charges: 0 plant Rs. 236l- 0 I Any Otl-rer Charges Grancl Totat A+D+B+F+G+FI+I to be deposited in r44298 CAMPA Fund - Technical details:- Technical details of Compensatory Afforestation Scheme are as follows:- a) General Details :- Compensatory Afforestation will be carried out alongwith P.F Fatehpur Escape, Compartment No. C-5 b) Spacing :- 4x2.5 c) Species :- Neem, Bakain, Papri, Jamun, Bar, Pipal, Suhajna etc. d) PlantationMethod: TallPlantation e) Soil and Moisture Conservation Works:- Nil 0 Protection (Fencing, Watch man, People's Participation etc.): Fencing s) Proposed Monitoring Mechanism : (M&E) t h) Any other information:- Nil.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    3 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us