09 Development of New Shinkansen Lines(Hokuriku Shinkansen

09 Development of New Shinkansen Lines(Hokuriku Shinkansen

WEST JAPAN RAILWAY COMPANY CORPORATE OPERATING CONTENTS BUSINESS DATA OTHER Fact Sheets 2017 OVERVIEW ENVIRONMENT 9 Business Development of New Shinkansen Lines (Hokuriku Shinkansen Line) FIVE NEW SHINKANSEN LINES PROPOSED IN 1973 UNDER THE NATIONWIDE SHINKANSEN RAILWAY DEVELOPMENT LAW Line Lines in Operation Approved Zone for Construction Expense Burden TRAVEL TIME AND MARKET SHARE Implementation Plan JR 3 JR market share Morioka — Shin-Aomori Airlines* 4 Tohoku (Morioka–Aomori) Before opening*1 After opening*2 before opening* (opened in December 2010, 178km) Ishikawa — About 3h 50m 2h 28m About 2h 50m 38.3% Takasaki — Nagano Kanto region (opened in October 1997, 117km) Hokuriku (Tokyo–Osaka) Kanazawa — Tsuruga (125km) Nagano — Kanazawa • Central government (existing Shinkansen Toyama — transfer revenues, public utilities expenses) About 3h 10m 2h 08m About 2h 30m 61.5% (opened in March 2015, 228km) Kanto region • Local governments Shin-Aomori — Shin-Hakodate-Hokuto Shin-Hakodate-Hokuto — Sapporo Hokkaido (Aomori–Sapporo) (one-half of the central government) *1. Using the Joetsu Shinkansen and Hakutaka limited express train (opened in March 2016, 149km) (211km) • JR (usage fees with the upper limit to be *2. Time required for fastest “Kagayaki” Hakata — Kagoshima-Chuo determined by the range of expected benefits) *3. Includes airport access and egress time Kyushu (Fukuoka–Kagoshima) (opened in March 2011, 289km) *4. Source: Statistical survey of Ministry of Land, Infrastructure, Transport and Tourism (FY2014.3, preliminary) Kyushu (Fukuoka–Nagasaki) Takeo-Onsen — Nagasaki (66km) PLANNING OF NEW SHINKANSEN LINES As of March 31, 2017 Shin-Otaru In Operation Sapporo Planned New Shinkansen Line (Under construction) Planned New Shinkansen Line (To be determined) Oshamanbe Shin-Hakodate-Hokuto JR-West JR-West Shin-Aomori 451km Hachinohe 125km 169km Akita Morioka Shinjo Niigata Yamagata Joetsu Sendai Toyama Kanazawa Myoko Shin-Shimonoseki Fukushima Hakata Hiroshima Fukui Hakusan Nagano Takeo-Onsen Okayama Tsuruga Car Isahaya Maintenance Shin-Tosu Center Takasaki Nagasaki Hokuriku Shinkansen Kyoto Nagano–Hakusan Car Maintenance Center Kumamoto Shin-Osaka Nagoya Omiya Opened on March 14, 2015. Shin-Yatsushiro Tokyo Hakusan Car Maintenance Center–Tsuruga Scheduled to be completed by end of FY2023.3. Kagoshima-Chuo Note: Hakusan Car Maintenance Center is located from Kanazawa station to the west about 12 kilometers..

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    1 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us