Scheme for the Banks of the Volme, Hagen

Scheme for the Banks of the Volme, Hagen

E_03_a_dreiseitl_078-111_16 20.09.2005 11:15 Uhr Seite 98 Scheme for the banks of the Volme, Hagen The Volme inside the town of Hagen was constrained within a box profile with embankment walls 3 metres high. As the concrete bed slowly crumbled away, a complete change of direction was envisioned. There are some towns that have a considerable number of inhabitants and whose names are familiar, but do not trigger any associations. For example, you’ve heard of Hagen, but it’s unlikely that you can describe more than the platform on the ICE train line. It’s the Weir at Kaufmannschule Weir Bridge at Rathausstraße at Marktstraße Weir Bridge at Badstraße same with rivers. The Ennepe is familiar 1. Previous state 100 year floodline enough, but how many people know that it flows into the Volme, which is a Volme Hydraulic assessment tributary of the Ruhr? Only people who Laid aggregate of the previous state of live in Hagen, you might think. Anyway, riverbed the Volme and projected the rivers come together just outside the effects of a new design town gates, and the Volme runs through the town centre. 2. Effects of the design But in the case of Hagen’s inhabit- Volme Rise of water level ants you can’t even be certain about Laid aggregate the Volme. As in many other places, this riverbed town with 200,000 inhabitants at the southern gateway of the Ruhr has 100 year floodline treated its river somewhat shabbily. It 3. Compensatory measures was downgraded to a canal in the past Steeper slope Volme Laid aggregate ramp 100 years, polluted with industrial waste Raised riverbed level and hidden away behind factory halls. Laid aggregate Laid aggregate ramp The municipal backyards are all on the riverbed Volme. For this reason the town brought its angry citizens into the equation when it was choosing a site for its new Since restoration, the river town hall on the Volme. The people Volme has regained the voted to dump these plans in a local diversity of its river referendum – until they heard in structure. Natural shorelines autumn 2000 about the idea of making alternate with urban ones. the river and above all its banks attrac- Stepped terraces in front of tive to the population at this point. At the Town Hall restore river the same time the open-space planners access to the citizens. wanted to lay the foundation stones for a waterway redevelopment that was to be continued in the long term. For exam- ple, the bottoms of the waterways were to be roughened, two weirs were to be removed or at least lowered, and banks arranged to impede the water or to allow it to flow. 98.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    1 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us